"00IE-095","12TH AVE","LAWTON ST","MORAGA ST","StrtImprov","Gabriel Y. Ng & Associates","","2000-06-01 00:00:00","ACTIVE","531000" "00IE-364","MISSOURI ST","YELLOW CAB ACCESS ROAD","CESAR CHAVEZ ST","StrtImprov","BRUCE BAUMANN & ASSOCIATES","See DPW Order No. 175,515, approved July 6, 2005.","2006-04-10 00:00:00","ACTIVE","9218000" "01IE-228","INNES AVE","EARL ST","ARELIOUS WALKER DR","StrtImprov","Arcus","Construct new 10' sidewalk with 5" curb and 2' pavement conform. Provide sidewalk conform as directed by inspector. No encroachment for a level landing.","2006-07-27 00:00:00","ACTIVE","7253000" "01IE-460","27TH AVE","IRVING ST","JUDAH ST","StrtImprov","Jason Chan, Architect","Sidewalk, new concrete curb (from joint to joint) saw-cut a minimum of 2’ of AC pavement and replace with 2 in. ACWS over 8 in. concrete base fronting the subject property.","2004-08-31 00:00:00","ACTIVE","1552000" "02IE-550","17TH AVE","LINCOLN WAY","IRVING ST","StrtImprov","Julia Liu","","2002-12-27 00:00:00","ACTIVE","757000" "02MSE-420","04TH AVE","BALBOA ST","CABRILLO ST","MinorEnc","","","2002-08-15 00:00:00","ACTIVE","244000" "03IE-175","17TH ST","CASTRO ST \ MARKET ST","END","StrtImprov","Bogatay Architects","Remove and reconstruct damaged sidewalk, curb with 2' pavement conform as necessary as directed by the inspector. 4.2% maximum cross slope","2004-08-27 00:00:00","ACTIVE","811000" "03IE-193","ELIZABETH ST","HOFFMAN AVE","GRAND VIEW AVE","StrtImprov","Rajat Randev","","2004-09-01 00:00:00","ACTIVE","5151000" "03IE-202","03RD ST","18TH ST","19TH ST","StrtImprov","Bay City View, LLC","No Vault permit is allowed under this permit. Remove and replace (e) sidewalk per City standards, approved plan and guideline from City Inspector. Provide 2 - ft. conform. Also, relocate (e) catch basin at corner, if req'd.","2003-09-22 00:00:00","ACTIVE","188201" "03IE-321","MISSION ST","18TH ST","19TH ST","StrtImprov","T. C. Chen, Architect","Reconstruct concrete curb and sidewalk with minimum 2' saw-cut / AC paving conform per City Standards as directed by DPW inspector fronting the subject property.","2005-02-08 00:00:00","ACTIVE","9120000" "03IE-457","BLUXOME ST","04TH ST","05TH ST","StrtImprov","BRUCE BAUMANN & ASSOCIATES","Remove and replace curb and sidewalk per approved plan, City Standards and per guidelines from City Inspector. Provide 2' street conform and 3' adjacent property conform areas.","2004-06-03 00:00:00","ACTIVE","2993000" "03IE-474","BAKER ST","VALLEJO ST","GREEN ST","StrtImprov","Dovetail Design Build","1 New Warped Driveway and 1 New Planter encroach 5 ft into sidewalk. Replace portion of concrete stairway with paved surface (0% cross slope). 1 New Driveway Curb Cut in planting strip. Ref. 03MSE-254 & BPA 20000128559","2011-01-26 10:51:16","ACTIVE","2629000" "03IE-514","16TH AVE","TARAVAL ST","ULLOA ST","StrtImprov","VINCENT GALBRAITH","","2003-07-09 00:00:00","ACTIVE","693000" "03IE-633","GRAFTON AVE","PLYMOUTH AVE","GRANADA AVE","StrtImprov","May Tang","","2003-08-22 00:00:00","ACTIVE","6359000" "03IE-637","ELIZABETH ST","DIAMOND ST","DOUGLASS ST","StrtImprov","Lewis M. Merlo, Inc.","","2003-08-26 00:00:00","ACTIVE","5149000" "03IE-727","MISSION ST","FOOTE AVE","NAGLEE AVE","StrtImprov","Transamerican Engineers","","2004-01-13 00:00:00","ACTIVE","9188000" "03IE-745","26TH AVE","CALIFORNIA ST","CLEMENT ST","StrtImprov","Jason Chan, Architect","","2003-10-27 00:00:00","ACTIVE","1471000" "03IE-791","19TH ST","EUREKA ST","DOUGLASS ST","StrtImprov","Sanders Pitman Designs","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by BSM inspector.","2003-12-02 00:00:00","ACTIVE","988000" "03IE-835","15TH AVE","LINCOLN WAY","IRVING ST","StrtImprov","Joseph Vaccaro & Company","","2003-11-18 00:00:00","ACTIVE","613000" "03MSE-183","MISSION ST","18TH ST","19TH ST","MinorEnc","T. C. Chen, Architect","One spring loaded out-swinging door on San Carlos & one spring loaded out-swinging door on 18th St encroaching into the public right-of-way.","2005-02-14 00:00:00","ACTIVE","9120000" "03MSE-427","26TH AVE","CALIFORNIA ST","CLEMENT ST","MinorEnc","Jason Chan, Architect","","2003-10-27 00:00:00","ACTIVE","1471000" "04IE-023","12TH AVE","KIRKHAM ST","LAWTON ST","StrtImprov","Lewis M. Merlo, Inc.","","2004-01-15 00:00:00","ACTIVE","530000" "04IE-038","05TH AVE","LAKE ST","CALIFORNIA ST","StrtImprov","Scott Adams","","2004-02-10 00:00:00","ACTIVE","276000" "04IE-121","PACIFIC AVE","FILLMORE ST","STEINER ST","StrtImprov","Brent J. McDonald","","2005-02-10 00:00:00","ACTIVE","10155000" "04IE-142","SUTTER ST","LEAVENWORTH ST","HYDE ST","StrtImprov","BANA CONSTRUCTION, INC.","Reconstruct concrete curb and sidewalk with minimum 2' saw-cut/ AC paving conform per City Standards as directed by DPW inspector fronting the subject property.","2008-05-08 11:30:57","ACTIVE","12327000" "04IE-171","PAGE ST","FRANKLIN ST","GOUGH ST","StrtImprov","JAIDIN CONSULTING GROUP","","2006-04-10 00:00:00","ACTIVE","10169000" "04IE-268","24TH AVE","ORTEGA ST","PACHECO ST","StrtImprov","Delta Design & Engineering System","","2004-04-30 00:00:00","ACTIVE","1305000" "04IE-361","PACIFIC AVE","BRODERICK ST","BAKER ST","StrtImprov","LOUIS FELTHOUSE","Reconstruct concrete curb & sidewalk to conform to existing conditions. When replacing the curb, they will need to construct a 6" curb & bury it so that 2" will align w/ the neighbor's curb height. All work to be directed by DPW inspector","2006-12-27 00:00:00","ACTIVE","10161000" "04IE-412","SACRAMENTO ST","BRODERICK ST","BAKER ST","StrtImprov","Jan Threlkeld, AIA","","2004-08-09 00:00:00","ACTIVE","11262000" "04IE-413","29TH ST","SAN JOSE AVE","DOLORES ST","StrtImprov","Tim Chan","","2004-09-01 00:00:00","ACTIVE","1630000" "04IE-443","VICTORIA ST","HOLLOWAY AVE","URBANO DR","StrtImprov","Ernesto Barron","","2006-03-01 00:00:00","ACTIVE","13288000" "04IE-598","18TH AVE","VICENTE ST","WAWONA ST","StrtImprov","Luis A. Robles","","2005-06-08 00:00:00","ACTIVE","848000" "04IE-602","SWEENY ST","BARNEVELD AVE","MERRILL ST","StrtImprov","CAROLYN LIU","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards.(no warping allowed in sidewalk).","2004-09-22 00:00:00","ACTIVE","12348000" "04IE-613","EDDY ST","SCOTT ST","DIVISADERO ST","StrtImprov","West Coast Premier Construction, Inc.","","2004-11-10 00:00:00","ACTIVE","5075000" "04IE-672","MISSION ST","SHAW ALY","ANTHONY ST","StrtImprov","JAIDIN CONSULTING GROUP","New curb/parking strip & sidewalk on Mission St to City Stds. Mill & fill 2" of AC on Mission St. curb to curb & PL to PL. New curb & sidewalk on Minna w/ 2' joint pavement conform. All work is directed by BSM inspector.","2008-05-20 14:21:51","ACTIVE","9090000" "04IE-673","STOCKTON ST","BROADWAY","VALLEJO ST","StrtImprov","AZ Design and Engineering, Inc.","Reconstruct concrete curb & sidewalk with min 2' saw-cut/ AC paving conform per City Standards as directed by DPW inspector fronting the subject property. Replace existing metal gate in kind for sub-sidewalk basement.","2006-03-06 00:00:00","ACTIVE","12210000" "04IE-683","DIVISADERO ST","HAYES ST","GROVE ST","StrtImprov","Erin Lilly Designs","","2004-11-03 00:00:00","ACTIVE","4803101" "04IE-683","HAYES ST","DIVISADERO ST","BRODERICK ST","StrtImprov","Erin Lilly Designs","","2004-11-03 00:00:00","ACTIVE","6825000" "04IE-698","BUSH ST","DIVISADERO ST","BRODERICK ST","StrtImprov","McELENEY CONSTRUCTION","","2004-11-19 00:00:00","ACTIVE","3457000" "04IE-701","PALOU AVE","DUNSHEE ST","QUINT ST \ SILVER AVE","StrtImprov","Zon Architects","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and reaplce with 2" ACWS on 8" concrete base as directed by the BSM inspector.","2006-01-18 00:00:00","ACTIVE","10226000" "04IE-709","25TH AVE","LAWTON ST","MORAGA ST","StrtImprov","Holger Menendez","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector. No curb return work.","2007-02-07 00:00:00","ACTIVE","1385000" "04IE-733","SWEENY ST","BARNEVELD AVE","MERRILL ST","StrtImprov","Van T. Ly & Associates","","2005-03-18 00:00:00","ACTIVE","12348000" "04IE-761","CLAYTON ST","PEMBERTON PL","CORBETT AVE","StrtImprov","Patrick Buscovich & Associates","Reconstruct concrete curb, sidewalk and install a new driveway with min 2' saw-cut/ AC paving conform per City Standards. All work directed by DPW inspector.","2011-06-22 10:55:51","ACTIVE","4141000" "04IE-771","FILLMORE ST","EDDY ST","ELLIS ST","StrtImprov","Fillmore Development Associates","","2005-09-19 00:00:00","ACTIVE","5544000" "04IE-788","SUTTER ST","BRODERICK ST","BAKER ST","StrtImprov","A. Gordon Atkinson","","2005-01-25 00:00:00","ACTIVE","12344000" "04MSE-391","SACRAMENTO ST","BRODERICK ST","BAKER ST","MinorEnc","Jan Threlkeld, AIA","","2004-08-09 00:00:00","ACTIVE","11262000" "04MSE-439","GUERRERO ST","15TH ST","16TH ST","MinorEnc","SIA Consulting Engineers","","2004-11-08 00:00:00","ACTIVE","6577101" "04MSE-502","LIBERTY ST","NOE ST","CASTRO ST","MinorEnc","Lewis M. Merlo, Inc.","","2004-12-06 00:00:00","ACTIVE","8328000" "04MSE-543","BUSH ST","DIVISADERO ST","BRODERICK ST","MinorEnc","McELENEY CONSTRUCTION","","2004-12-08 00:00:00","ACTIVE","3457000" "04MSE-581","FILLMORE ST","EDDY ST","ELLIS ST","MinorEnc","Fillmore Development Associates","","2005-09-22 00:00:00","ACTIVE","5544000" "05IE-0003","05TH AVE","LAKE ST","CALIFORNIA ST","StrtImprov","Fu Yim","","2006-06-15 00:00:00","ACTIVE","276000" "05IE-0023","FONT BLVD","ARBALLO DR \ TAPIA DR","LAKE MERCED BLVD","StrtImprov","Will Revilock","","2006-11-30 00:00:00","ACTIVE","5723201" "05IE-0123","27TH AVE","EL CAMINO DEL MAR","LAKE ST","StrtImprov","Jan Threlkeld, AIA","","2005-05-13 00:00:00","ACTIVE","1543000" "05IE-0170","MISSOURI ST","20TH ST","SIERRA ST","StrtImprov","Swatt Architects","","2007-02-06 00:00:00","ACTIVE","9212000" "05IE-0174","HAIGHT ST","LYON ST","BUENA VISTA AVE","StrtImprov","Citizens Housing","","2005-09-29 00:00:00","ACTIVE","6615000" "05IE-0176","GEARY ST","KEARNY ST","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","24645000" "05IE-0176","GEARY ST","MARKET ST","KEARNY ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","6106000" "05IE-0176","KEARNY ST","GEARY ST","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","24645000" "05IE-0176","KEARNY ST","GEARY ST","MAIDEN LN","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","7747000" "05IE-0176","KEARNY ST","MAIDEN LN","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","24648000" "05IE-0176","MAIDEN LN","KEARNY ST","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","24648000" "05IE-0176","MARKET ST","03RD ST \ KEARNY ST","GRANT AVE \ OFARRELL ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","8745201" "05IE-0176","MARKET ST","ANNIE ST","03RD ST \ KEARNY ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2006-07-19 00:00:00","ACTIVE","8744102" "05IE-0182","22ND AVE","IRVING ST","JUDAH ST","StrtImprov","Jason Chan, Architect","","2005-06-13 00:00:00","ACTIVE","1140000" "05IE-0236","COLERIDGE ST","FAIR AVE","ESMERALDA AVE","StrtImprov","Suarez-Kuehne Architecture","","2006-03-27 00:00:00","ACTIVE","4254000" "05IE-0239","VAN NESS AVE","FILBERT ST","GREENWICH ST","StrtImprov","BRUCE BAUMANN & ASSOCIATES","","2005-11-04 00:00:00","ACTIVE","13168101" "05IE-0264","21ST AVE","CLEMENT ST","GEARY BLVD","StrtImprov","SIA Consulting Engineers","To repair and reconstruct concrete sidewalk, curb with minimum 2' saw-cut/AC paving to conform per City Standards as directed by the DPW inspector fronting the subject property.","2005-06-06 00:00:00","ACTIVE","1074000" "05IE-0317","EL CAMINO DEL MAR","LAKE ST","32ND AVE","StrtImprov","VINCENT AMMIRATO","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2008-01-15 00:00:00","ACTIVE","5127000" "05IE-0323","17TH ST","END","DIAMOND ST","StrtImprov","WM, PATTENGILL","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector.","2005-07-15 00:00:00","ACTIVE","812000" "05IE-0341","BRODERICK ST","HAIGHT ST","PAGE ST","StrtImprov","JIMENEZ CONSTRUCTION","","2005-06-09 00:00:00","ACTIVE","3188000" "05IE-0386","17TH ST","NOE ST","HARTFORD ST","StrtImprov","SF Garage Co.","Reconstruct concrete curb and sidewalk with min 2' saw-cut/ AC paving conform per City Standards as directed by DPW inspector fronting the subject property.","2005-07-28 00:00:00","ACTIVE","809000" "05IE-0396","26TH ST","DIAMOND ST","DOUGLASS ST","StrtImprov","Mark Brand Architecture","Reconstruct sidewalk & curb with 2' pavement/SW per city standards. (No encroachment allowed in sidewalk).","2005-08-05 00:00:00","ACTIVE","1540000" "05IE-0406","FELTON ST","GOETTINGEN ST","SOMERSET ST","StrtImprov","Yim Fu-Him","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector.","2006-06-29 00:00:00","ACTIVE","5465000" "05IE-0433","GRANT AVE","BUSH ST","PINE ST","StrtImprov","Gary Gee Architectecture","Install new two (2) curb ramp as directed by city inspector, reconstruct sidewalk & curb with 2' pavement/SW conform on Grant Avenue per city standards.","2005-10-12 00:00:00","ACTIVE","6389000" "05IE-0491","BUSH ST","BAKER ST","LYON ST","StrtImprov","Top Etcher Architecture","Reconstruct sidewalk & curb with 2' pavement/SW conform & install new 10'x3' standard curb-cut per city standards.","2005-09-28 00:00:00","ACTIVE","3459000" "05IE-0506","STEINER ST","JACKSON ST","PACIFIC AVE","StrtImprov","Glenn Reynolds Design","","2006-11-06 00:00:00","ACTIVE","12145000" "05IE-0507","KANSAS ST","17TH ST","MARIPOSA ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2007-05-21 00:00:00","ACTIVE","7728000" "05IE-0507","RHODE ISLAND ST","17TH ST","MARIPOSA ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2007-05-21 00:00:00","ACTIVE","10996000" "05IE-0507","RHODE ISLAND ST","MARIPOSA ST","18TH ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2007-05-21 00:00:00","ACTIVE","10997000" "05IE-0560","LYON ST","GEARY BLVD","LEONA TER","StrtImprov","Mark Brand Architecture","","2005-12-09 00:00:00","ACTIVE","8563000" "05IE-0594","17TH ST","SOUTH VAN NESS AVE","CAPP ST","StrtImprov","KDArchitects","","2005-10-07 00:00:00","ACTIVE","795000" "05IE-0617","JACKSON ST","CHERRY ST","ARGUELLO BLVD","StrtImprov","Charlie Barnett & Associates","","2006-01-13 00:00:00","ACTIVE","7418000" "05IE-0687","CABRILLO ST","10TH AVE","11TH AVE","StrtImprov","Robert Sing","","2005-11-02 00:00:00","ACTIVE","3476000" "05IE-0692","WILLARD NORTH ST","TURK BLVD","GOLDEN GATE AVE","StrtImprov","Wilson Engineering","","2006-07-13 00:00:00","ACTIVE","13647000" "05IE-0712","DE HARO ST","ALAMEDA ST","15TH ST","StrtImprov","B & B Contractors Services","","2006-06-30 00:00:00","ACTIVE","4628000" "05IE-0755","16TH AVE","NORIEGA ST","ORTEGA ST","StrtImprov","Lewis M. Merlo, Inc.","Repair curb, curb cut, and sidewalk to City Standards. All work to be directed by BSM Inspector.","2005-11-30 00:00:00","ACTIVE","686000" "05IE-0759","FAIR OAKS ST","24TH ST","25TH ST","StrtImprov","Kelvin Chua","","2006-01-30 00:00:00","ACTIVE","5384000" "05IE-0822","ANZA ST","14TH AVE","15TH AVE","StrtImprov","Jim Scannell","","2005-12-29 00:00:00","ACTIVE","2332000" "05MSE-0174","FILLMORE ST","EDDY ST","ELLIS ST","MinorEnc","Fillmore Development Associates","","2005-03-15 00:00:00","ACTIVE","5544000" "05MSE-0258","BRANNAN ST","05TH ST","06TH ST \ I-280 NORTHBOUND \ I-280 SOUTHBOUND","MinorEnc","TARA ENGINEERING","","","ACTIVE","3081000" "05MSE-0370","17TH ST","END","DIAMOND ST","minorenc","WM, PATTENGILL","Installing and maintaining two (2) new planter boxes and a warped driveway encroaching 3'-0" into the public right-of-way per subject property.","2005-07-15 00:00:00","ACTIVE","812000" "05MSE-0489","GRANT AVE","BUSH ST","PINE ST","minorenc","Gary Gee Architectecture","Sub-sidewalk basement on Grant Avenue Street frontage.","2005-10-24 00:00:00","ACTIVE","6389000" "05MSE-0559","JACKSON ST","KEARNY ST","COOPER ALY","minorenc","Kwan & Associates","Existing sub-sidewalk basement","2005-12-19 00:00:00","ACTIVE","7369000" "05MSE-0570","WASHINGTON ST","TAYLOR ST","JONES ST","MinorEnc","Christopher Ford, Landscape Architect","","2006-09-14 00:00:00","ACTIVE","13425000" "05MSE-0618","JACKSON ST","CHERRY ST","ARGUELLO BLVD","MinorEnc","Charlie Barnett & Associates","Installation of a warped driveway and two (2) planter boxes encroaching 3'-0" into the sidewalk (public right-of-way), as per neighborhood pattern, fronting the subject property.","2006-01-13 00:00:00","ACTIVE","7418000" "05MSE-0706","MISSION ST","18TH ST","19TH ST","MinorEnc","T. C. Chen, Architect","Existing (E) transformer room doors encroaching 3'-0" into the sidewalk (public right-of-way) on the San Carlos Avenue frontage. Must have detectable audible alarm to alert pedstrains for opening.","2007-10-29 00:00:00","ACTIVE","9120000" "05V-0028","VAN NESS AVE","FILBERT ST","GREENWICH ST","Vault","BRUCE BAUMANN & ASSOCIATES","","2006-03-13 00:00:00","ACTIVE","13168101" "06IE-0004","TAYLOR ST","SUTTER ST","BUSH ST","StrtImprov","BANA CONSTRUCTION, INC.","Reconstruct concrete curb and sidewalk with minimum 2' saw-cut/AC paving conform per City Standards as directed by DPW inspector fronting the subject property. In conjuction with 06V-0025.","2007-10-24 00:00:00","ACTIVE","12437000" "06IE-0089","WISCONSIN ST","23RD ST","CORAL RD","StrtImprov","Jason Chan, Architect","Repair concrete curb & sidewalk w/ minimum 2' saw-cut/AC paving conform per City Standards as directed by DPW inspector fronting the subject property.","2006-07-07 00:00:00","ACTIVE","13698000" "06IE-0103","DORLAND ST","GUERRERO ST","DOLORES ST","StrtImprov","JS Concrete Construction","","2006-02-24 00:00:00","ACTIVE","4934000" "06IE-0112","FRANKLIN ST","VALLEJO ST","GREEN ST","StrtImprov","Roger Boyer","Remove and reconstruct new curb cut for a new driveway, sidewalk and curb per approved plan with 2' pavement conform and sidewalk conform as necessary as directed by the inspector.","2006-05-30 00:00:00","ACTIVE","5833000" "06IE-0116","FULTON ST","DIVISADERO ST","BRODERICK ST","StrtImprov","J. Mark Cronander","Remove and reconstruct new curb cut for a new driveway, sidewalk and curb per approved plan with 2' pavement conform and sidewalk conform as necessary as directed by the inspector.","2006-05-17 00:00:00","ACTIVE","5891000" "06IE-0133","CABRILLO ST","11TH AVE","12TH AVE","StrtImprov","BOBBIE SUE HOOD","","2006-05-11 00:00:00","ACTIVE","3477000" "06IE-0158","BUENA VISTA AVE","CENTRAL AVE","WALLER ST","StrtImprov","Jane Cee","","2009-03-27 10:48:59","ACTIVE","3370000" "06IE-0158","CENTRAL AVE","BUENA VISTA AVE","WALLER ST","StrtImprov","Jane Cee","","2009-03-27 10:48:59","ACTIVE","3859000" "06IE-0158","WALLER ST","BUENA VISTA AVE","CENTRAL AVE","StrtImprov","Jane Cee","","2009-03-27 10:48:59","ACTIVE","13371000" "06IE-0163","48TH AVE","LAWTON ST","MORAGA ST","StrtImprov","Julia Liu","","2006-04-20 00:00:00","ACTIVE","2070000" "06IE-0204","SURREY ST","VAN BUREN ST","SWISS AVE","StrtImprov","Andy Forrest, P.E.","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector. No Warping or Ramping on public right of way.","2006-07-06 00:00:00","ACTIVE","12303000" "06IE-0291","41ST AVE","ULLOA ST","VICENTE ST","StrtImprov","PETER GABANCHO","Reconstruct sidewalk & curb with 2' pavement/SW conform to existing condition as directed by city inspector.","2006-05-26 00:00:00","ACTIVE","1923000" "06IE-0318","MACONDRAY LN","JONES ST","LEAVENWORTH ST","StrtImprov","Patrick Buscovich & Associates","","2006-11-17 00:00:00","ACTIVE","8592000" "06IE-0330","27TH ST","DIAMOND ST","DOUGLASS ST","StrtImprov","Top Etcher Architecture","","2006-07-10 00:00:00","ACTIVE","1572000" "06IE-0370","PAGE ST","WEBSTER ST","FILLMORE ST","StrtImprov","Jarvis Architects","","2006-08-02 00:00:00","ACTIVE","10174000" "06IE-0381","SICKLES AVE","ACTON ST \ MISSION ST","HURON AVE","StrtImprov","Javier Solorzano","","2006-07-26 00:00:00","ACTIVE","11866000" "06IE-0399","EXECUTIVE PARK BLVD","SANDPIPER COVE WAY \ THOMAS MELLON DR","CRESCENT WAY","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","Please see attached draft DPW Order No., XXX,XXX CFC will not be issued until the Sidewalk Legislation is approved by the Board","2009-09-14 15:10:29","ACTIVE","5373201" "06IE-0402","TURK BLVD","WILLARD NORTH ST","ARGUELLO BLVD \ BALBOA ST","StrtImprov","Michael Harris, Architect","","2007-04-25 00:00:00","ACTIVE","12752000" "06IE-0434","SOUTH PARK","02ND ST","END","StrtImprov","Luke Ogrydziak, AIA","South Park Street frontage must reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base. Taber Place frontage repair street to center line. Both as directed by the BSM inspector.","2006-08-23 00:00:00","ACTIVE","12008000" "06IE-0450","FILLMORE ST","HERMANN ST","GERMANIA ST","StrtImprov","YAKUH ASKEW ARCHITECT","Reconstruct curb and sidewalk fronting subject property on Germania St. to City Standards as directed by the BSM inspector. No warping in the public right of way or negative cross slopes. New curb cut of 8'-6" x 3'.","2007-05-08 00:00:00","ACTIVE","5530000" "06IE-0452","GEARY ST","KEARNY ST","GRANT AVE","StrtImprov","Brand & Allen Architects, Inc.","Reconstruct concrete curb, sidewalk and parking strip with min 2' saw-cut / AC paving conform. Remove all tiles in the sidewalk on Maiden Ln. All work directed by DPW inspector. ","2009-02-02 08:21:06","ACTIVE","6107000" "06IE-0452","MAIDEN LN","KEARNY ST","GRANT AVE","StrtImprov","Brand & Allen Architects, Inc.","Reconstruct concrete curb, sidewalk and parking strip with min 2' saw-cut / AC paving conform. Remove all tiles in the sidewalk on Maiden Ln. All work directed by DPW inspector. ","2009-02-02 08:21:06","ACTIVE","8625000" "06IE-0466","20TH ST","GUERRERO ST","DOLORES ST","StrtImprov","SF Garage Co.","Reconstruct curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector. Inconjunction with 06MSE-0392.","2006-10-26 00:00:00","ACTIVE","1060000" "06IE-0520","22ND ST","VICKSBURG ST","SANCHEZ ST","StrtImprov","Henry Karnilowicz","Reconstruct new curb and sidewalk to City standards. Saw cut 2' ACWS on 8" concrete base as directed by BSM inspector. Warped sidewalk with two planter boxes (diverters) . In conjunction with 06MSE-0483.","2006-11-27 00:00:00","ACTIVE","1202000" "06IE-0531","21ST ST","CHATTANOOGA ST","CHURCH ST","StrtImprov","Cornelia Griffin, Architect","","2008-08-07 14:44:54","ACTIVE","1119000" "06IE-0576","PAGE ST","COLE ST","SHRADER ST","StrtImprov","YAKUH ASKEW ARCHITECT","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards.","2006-10-03 00:00:00","ACTIVE","10187000" "06IE-0590","HAIGHT ST","DIVISADERO ST","BRODERICK ST","StrtImprov","JOHN LUM ARCHITECTURE","","2006-11-30 00:00:00","ACTIVE","6612000" "06IE-0598","18TH AVE","ANZA ST","BALBOA ST","StrtImprov","P.F. Construction Company","","2006-11-17 00:00:00","ACTIVE","831000" "06IE-0601","CAROLINA ST","22ND ST","23RD ST","StrtImprov","J. FLORES CONSTRUCTION CO., INC.","","2006-10-12 00:00:00","ACTIVE","3714101" "06IE-0614","25TH ST","FLORIDA ST","ALABAMA ST","StrtImprov","Meridian Builders","","2007-08-02 00:00:00","ACTIVE","1427000" "06IE-0616","CALIFORNIA ST","BAKER ST","LYON ST","StrtImprov","SAN FRANCISCO GARAGE CO.","","2006-11-07 00:00:00","ACTIVE","3564000" "06IE-0679","ELLIS ST","HYDE ST","LARKIN ST","StrtImprov","GILBERT CHAN","","2007-02-21 00:00:00","ACTIVE","5177000" "06IE-0680","NORTH POINT ST","LARKIN ST","POLK ST","StrtImprov","Tsang Architecture","Break (E) curb towards property. Reconstruct sidewalk and curb. Install driveway with pavement conforms. As directed by City Inspector. Install new tree (permit from BUF).","2006-12-29 00:00:00","ACTIVE","9696000" "06IE-0685","WASHINGTON ST","MAPLE ST","CHERRY ST","StrtImprov","Patrick Buscovich & Associates","Reconstruct curb cut, sidewalk, curb per City Standards and as directed by Inspector","2007-06-04 00:00:00","ACTIVE","13451000" "06IE-0687","NORTH POINT ST","LARKIN ST","POLK ST","StrtImprov","BRUCE BAUMANN & ASSOCIATES","Reconstruct concrete curb, sidewalk & parking strip with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2008-04-07 00:00:00","ACTIVE","9696000" "06IE-0689","CARROLL AVE","ISSLEIB AVE \ NEWHALL ST","PHELPS ST","StrtImprov","YAKUH ASKEW ARCHITECT","","2007-02-23 00:00:00","ACTIVE","3740000" "06IE-0722","SHAWNEE AVE","DELANO AVE","NAHUA AVE","StrtImprov","Tekton Architecture","Reconstruct new curb/curb cut and sidewalk to City standards. Saw cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by BSM inspector.","2010-02-19 14:52:53","ACTIVE","11799000" "06MSE-0040","EDDY ST","BUCHANAN ST","WEBSTER ST","minorenc","BRUCE BAUMANN & ASSOCIATES","New (N) door swings for gas and electric meters encroaching 30-inches and a concrete step 3-feet into the public right-of-way (sidewalk) per neighborhood pattern fronting subject property.","2006-01-25 00:00:00","ACTIVE","5070000" "06MSE-0274","VALLEJO ST","WEBSTER ST","FILLMORE ST","MinorEnc","MOROSO CONSTRUCTION INC","New (N) warped driveway with two planter boxes encroaching 3' into the public right of way and an adjecent planter box encroaching 1'-6 1/2" into the sidewalk fronting the subject property. Non-City Standards cross slope.","2006-09-15 00:00:00","ACTIVE","13115000" "06MSE-0343","EDDY ST","SCOTT ST","DIVISADERO ST","minorenc","Top Etcher Architecture","Three (3) new doors swing encroaching 1'-0" into the public right-of-way fronting subject property.","2006-07-13 00:00:00","ACTIVE","5075000" "06MSE-0417","JONES ST","VALLEJO ST","GREEN ST","minorenc","","","2006-08-25 00:00:00","ACTIVE","7588000" "06MSE-0560","06TH AVE","END","LAKE ST","MinorEnc","Roman Rettner","Existing (E) planter boxes and warped driveway encroaching approximately 4'-4" into the public right-of-way. New (N) curb cut per City standards.","2006-12-21 00:00:00","ACTIVE","312000" "06MSE-0562","MACONDRAY LN","JONES ST","LEAVENWORTH ST","MinorEnc","Patrick Buscovich & Associates","","2006-11-17 00:00:00","ACTIVE","8592000" "06PB-0007","ARGUELLO BLVD","CLAY ST","LAKE ST","PipeBarr","Plant Construction Company","","2006-11-30 00:00:00","ACTIVE","2416000" "07DW-0002","POST ST","POWELL ST","MASON ST","OverwideDr","Donald S. MacLean, Inc.","legalize and document existing overwide driveway","2007-05-08 00:00:00","ACTIVE","10629000" "07E-0026","HUDSON AVE","MENDELL ST","NEWHALL ST","ExcStreet","A. Ruiz Construction Co. & Assoc., Inc.","","2007-05-10 00:00:00","ACTIVE","7078000" "07E-0045","WILDER ST","CARRIE ST","DIAMOND ST","ExcStreet","A. Ruiz Construction Co. & Assoc., Inc.","","2007-04-04 00:00:00","ACTIVE","13632000" "07E-0104","DORE ST","HOWARD ST","FOLSOM ST","ExcStreet","R & M Underground, Inc.","","2007-08-20 00:00:00","ACTIVE","4929000" "07E-0106","SPEAR ST","FOLSOM ST","HARRISON ST","ExcStreet","GRANITE EXCAVATION & DEMOLITION, INC.","","2007-09-21 00:00:00","ACTIVE","12047000" "07IE-0001","COLLINGWOOD ST","18TH ST","19TH ST","StrtImprov","Roman Rettner","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed bt the BSM inspector. No warping of the public righ-of-way.","2007-03-12 00:00:00","ACTIVE","4270000" "07IE-0039","CHURCH ST","28TH ST","VALLEY ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","Reconstruct new curb and sidewalk. Install and modidy two curb ramps at the corner lot. Saw cut 2' AC gutter and replace with 2" ACWS on 8" concrete base as directed by BSM inspector.","2007-10-10 00:00:00","ACTIVE","4035000" "07IE-0076","MISSION ST","MAIN ST","BEALE ST","StrtImprov","PAMELA HARRIS","","2007-04-03 00:00:00","ACTIVE","9085000" "07IE-0093","SILLIMAN ST","BOWDOIN ST","DARTMOUTH ST","StrtImprov","Cherine Ang","","2007-09-12 00:00:00","ACTIVE","11880000" "07IE-0118","CALIFORNIA ST","07TH AVE \ CORNWALL ST","08TH AVE","StrtImprov","MEI Design","","2007-02-21 00:00:00","ACTIVE","3583000" "07IE-0127","PINE ST","BAKER ST","LYON ST","StrtImprov","John Pignanelli","Reconstruct new sidewalk and curb with 2' pavement conform and repair damaged sidewalk/roadway as directed by the inspector. Construct a new 10'-0" curb cut.","2008-01-29 00:00:00","ACTIVE","10492000" "07IE-0132","SAN JOSE AVE","ELIZABETH ST","24TH ST","StrtImprov","Lewis M. Merlo, Inc.","","2007-02-27 00:00:00","ACTIVE","11429000" "07IE-0135","BEACH ST","HYDE ST","LARKIN ST","StrtImprov","M H CONSTRUCTION MANAGEMENT CO.","","2007-02-28 00:00:00","ACTIVE","2846000" "07IE-0137","PARNASSUS AVE","SHRADER ST","","StrtImprov","Gonzalez Concrete","","2007-02-28 00:00:00","ACTIVE","26299000" "07IE-0137","SHRADER ST","PARNASSUS AVE","","StrtImprov","Gonzalez Concrete","","2007-02-28 00:00:00","ACTIVE","26299000" "07IE-0157","15TH AVE","GEARY BLVD","ANZA ST","StrtImprov","Patrick Buscovich & Associates","Recontruct new sidewalk with level landing, curb and curb cut per City Standards as directed by Inspector","2007-05-01 00:00:00","ACTIVE","609000" "07IE-0183","MIRAMAR AVE","GRAFTON AVE","HOLLOWAY AVE","StrtImprov","DAVID PHUC HONG VOONG","","2007-07-20 00:00:00","ACTIVE","9071000" "07IE-0194","DIAMOND ST","22ND ST","ALVARADO ST","StrtImprov","HEATHER N RODDE","","2007-03-23 00:00:00","ACTIVE","4742000" "07IE-0197","OAK ST","PIERCE ST","SCOTT ST","StrtImprov","SIA Consulting Engineers","","2007-03-22 00:00:00","ACTIVE","9759000" "07IE-0216","SACRAMENTO ST","LYON ST","PRESIDIO AVE","StrtImprov","JORAM S. ALTMAN","","2007-08-24 00:00:00","ACTIVE","11264000" "07IE-0230","MOULTON ST","BUCHANAN ST","WEBSTER ST","StrtImprov","Kwan & Associates","Remove and replace curb and sidewalk including curb cut, per approved plan and per City standards. Provide 2' street; and 3' adjacent property; conform areas, when necessary.","2007-06-27 00:00:00","ACTIVE","9407000" "07IE-0231","SACRAMENTO ST","KIMBALL PL","HYDE ST","StrtImprov","SF Garage Co.","","2007-08-13 00:00:00","ACTIVE","11245000" "07IE-0235","SAN BRUNO AVE","19TH ST","20TH ST","StrtImprov","Douglas Fong, AIA","Reconstruct concrete curb and sidewalk with min 2’ saw-cut/ AC paving conform per City Standards. Remove existing curb cut on 20th St. All work directed by DPW inspector.","2010-01-25 08:27:10","ACTIVE","11357000" "07IE-0236","VALLEJO ST","NORMANDIE TER","DIVISADERO ST","StrtImprov","Aleck Willson Architects","","2007-07-30 00:00:00","ACTIVE","13120000" "07IE-0256","26TH ST","DOLORES ST","CHURCH ST","StrtImprov","Nelson Cheung","","2007-04-12 00:00:00","ACTIVE","1535000" "07IE-0271","WILMOT ST","WEBSTER ST","FILLMORE ST","StrtImprov","WILLIAM PASHELINSKY","Reconstruct concrete curb and sidewalk with min 2' saw-cut/ AC paving conform per City Standards. All work directed by DPW inspector.","2009-02-05 14:47:22","ACTIVE","13668000" "07IE-0305","POST ST","POWELL ST","MASON ST","StrtImprov","Donald S. MacLean, Inc.","STREET SPACE 40 LF ON MASON STREET FRONTAGE. SIDEWALK REPAIR FOR 1000 SF. IN CONJUNCTION WITH 07MSE-0102 AND 07DW-0002.","2007-05-08 00:00:00","ACTIVE","10629000" "07IE-0318","FITZGERALD AVE","HAWES ST","INGALLS ST","StrtImprov","HAWK LEE","","2007-09-15 00:00:00","ACTIVE","5599000" "07IE-0361","BRODERICK ST","FELL ST","HAYES ST","StrtImprov","MASON KIRBY, INC.","Reconstruct new curb and sidwalk to City Standards. Saw cut 2' ACWS on 8" concrete base as directed by BSM inspector.","2008-01-22 00:00:00","ACTIVE","3191000" "07IE-0380","VALENCIA ST","16TH ST","17TH ST","StrtImprov","John Sheeraw","","2007-06-07 00:00:00","ACTIVE","13060000" "07IE-0388","GOLDEN GATE AVE","HYDE ST","LARKIN ST","StrtImprov","CMA, Inc.","Reconstruct curb/parking strip to City Standards. Install four(4) curb ramps @ corners. Provide 2' pavement conform. All work is directed by the BSM inspector.","2009-04-06 15:07:18","ACTIVE","6263000" "07IE-0388","LARKIN ST","MCALLISTER ST","GOLDEN GATE AVE","StrtImprov","CMA, Inc.","Reconstruct curb/parking strip to City Standards. Install four(4) curb ramps @ corners. Provide 2' pavement conform. All work is directed by the BSM inspector.","2009-04-06 15:07:18","ACTIVE","8123000" "07IE-0393","FRANCISCO ST","POLK ST","VAN NESS AVE","StrtImprov","David Lopez","Reconstruct 96 lf of sidewalk and 56 lf of curb which includes two curb cuts of 20 ft to City Std as directed by Inspector. Street space 40 LF. Work is done on 3400 block of Polk Street.","2007-07-02 00:00:00","ACTIVE","5770000" "07IE-0393","POLK ST","FRANCISCO ST","BAY ST","StrtImprov","David Lopez","Reconstruct 96 lf of sidewalk and 56 lf of curb which includes two curb cuts of 20 ft to City Std as directed by Inspector. Street space 40 LF. Work is done on 3400 block of Polk Street.","2007-07-02 00:00:00","ACTIVE","10585000" "07IE-0412","VAN NESS AVE","ALICE B TOKLAS PL","GEARY BLVD \ GEARY ST","StrtImprov","Kwan & Associates","Replace approx. 90LF (on Myrtle) of concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. Curb cut replacement shall be one complete pour. All work directed by DPW inspector.","2007-10-03 00:00:00","ACTIVE","13152202" "07IE-0423","JONES ST","SUTTER ST","BUSH ST","StrtImprov","MOSHE DINAR","Reconstruct new curb/ parking strip and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector. In conjunction w/07MSE-0381.","2007-08-24 00:00:00","ACTIVE","7575000" "07IE-0440","BUCHANAN ST","CLAY ST","WASHINGTON ST","StrtImprov","THOMAS A. MEECE","","2007-07-27 00:00:00","ACTIVE","3342000" "07IE-0445","16TH AVE","LAKE ST","CALIFORNIA ST","StrtImprov","Butler Armsden Architects","To reconstruct curb and sidewalk to City standards. Saw cut 2' ACWS on 8" concrete base as directed by BSM inspector.","2008-01-15 00:00:00","ACTIVE","670000" "07IE-0477","CALIFORNIA ST","SCOTT ST","","StrtImprov","Ming Lee","","2007-09-26 00:00:00","ACTIVE","26641000" "07IE-0477","SCOTT ST","CALIFORNIA ST","","StrtImprov","Ming Lee","","2007-09-26 00:00:00","ACTIVE","26641000" "07IE-0480","ATHENS ST","PERSIA AVE","RUSSIA AVE","StrtImprov","Maria Vaccaro","Remove and replace driveway curb cut, only, per City standards. Provide 2' street conform area. (Ref: Issued per NOV #08018, by C. Dupperault; 07/16/07)","2007-07-18 00:00:00","ACTIVE","2537000" "07IE-0486","CHESTNUT ST","STEINER ST","PIERCE ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2007-11-27 00:00:00","ACTIVE","3979000" "07IE-0489","LENOX WAY","TARAVAL ST","VERDUN WAY","StrtImprov","KCA Engineers, Inc.","","2007-07-27 00:00:00","ACTIVE","8306000" "07IE-0512","GOLDEN GATE AVE","CENTRAL AVE","MASONIC AVE","StrtImprov","Gonzalez Concrete","","2007-08-02 00:00:00","ACTIVE","6280000" "07IE-0513","GOLDEN GATE AVE","CENTRAL AVE","MASONIC AVE","StrtImprov","Gonzalez Concrete","","2007-08-02 00:00:00","ACTIVE","6280000" "07IE-0522","UNION ST","CASTLE ST","KEARNY ST","StrtImprov","SF Garage Co.","New driveway curb cut. Repave asphalt up to 2 feet from new curb. Ref. 07MSE-0474","2007-12-03 00:00:00","ACTIVE","12838000" "07IE-0527","FILBERT ST","STEINER ST","PIERCE ST","StrtImprov","SAN FRANCISCO GARAGE CO.","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2008-01-29 00:00:00","ACTIVE","5523000" "07IE-0548","BRYANT ST","19TH ST","20TH ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2007-08-31 00:00:00","ACTIVE","3309000" "07IE-0571","08TH AVE","CABRILLO ST","FULTON ST","StrtImprov","Ronald Cheung","","2007-08-29 00:00:00","ACTIVE","393000" "07IE-0578","GRANT AVE","JACK KEROUAC ALY","BROADWAY","StrtImprov","Homy Sikaroudi","","2007-09-05 00:00:00","ACTIVE","6399000" "07IE-0584","LOMBARD ST","BUCHANAN ST","WEBSTER ST","StrtImprov","EF Gomez Cement Contractor","","2007-09-06 00:00:00","ACTIVE","8458101" "07IE-0584","LOMBARD ST","MONTCLAIR TER","HYDE ST","StrtImprov","EF Gomez Cement Contractor","","2007-09-06 00:00:00","ACTIVE","8449000" "07IE-0589","25TH ST","FLORIDA ST","ALABAMA ST","StrtImprov","E.F. Gomez Cement Contractor","","2007-09-10 00:00:00","ACTIVE","1427000" "07IE-0592","PIERCE ST","GREEN ST","UNION ST","StrtImprov","ASSOCIATED BUILDERS","","2007-09-11 00:00:00","ACTIVE","10441000" "07IE-0606","20TH ST","CONNECTICUT ST","ARKANSAS ST","StrtImprov","Bureau of Architecture","","2009-10-09 09:20:55","ACTIVE","1035000" "07IE-0610","26TH ST","BRYANT ST","FLORIDA ST","StrtImprov","Gonzalez Concrete","","2007-09-20 00:00:00","ACTIVE","1512000" "07IE-0632","26TH ST","CHURCH ST","SANCHEZ ST","StrtImprov","Levy Art & Architecture, Inc.","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards. (No warping allowed in sidewalk)","2008-01-07 00:00:00","ACTIVE","1536000" "07IE-0633","SCOTT ST","GREEN ST","UNION ST","StrtImprov","Joseph Vaccaro & Company","","2007-10-01 00:00:00","ACTIVE","11711000" "07IE-0634","FILBERT ST","MASON ST","TAYLOR ST","StrtImprov","GREGORY CHOY","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2010-09-17 09:18:55","ACTIVE","5507000" "07IE-0637","CLAY ST","POLK ST","VAN NESS AVE","StrtImprov","E.F. Gomez Cement Contractor","","2007-10-01 00:00:00","ACTIVE","4106000" "07IE-0650","PINE ST","BUCHANAN ST","WEBSTER ST","StrtImprov","SIA Consulting Engineers","Reconstruct concrete curb, sidewalk and parking strip with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2008-04-21 15:14:27","ACTIVE","10483000" "07IE-0660","CAMP ST","ALBION ST","GUERRERO ST","StrtImprov","Navarro Concrete Construction","Reconstruct damaged sidewalk and replace approximately 11 linear feet of curb as director by inspector per city standards and per NTR#35159.","2007-10-09 00:00:00","ACTIVE","3636000" "07IE-0678","11TH AVE","BALBOA ST","CABRILLO ST","StrtImprov","NMS Brosnan Construction","Repair curb, curb cut and sidewalk to City Standards per NTR # 35614. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2007-10-16 00:00:00","ACTIVE","498000" "07IE-0684","FULTON ST","46TH AVE","47TH AVE","StrtImprov","","","2007-10-17 00:00:00","ACTIVE","5953000" "07IE-0685","UNNAMED 018","36TH AVE","38TH AVE","StrtImprov","American Asphalt Repair & Resurfacing Co","","2007-10-18 00:00:00","ACTIVE","12902000" "07IE-0703","VAN NESS AVE","BUSH ST","AUSTIN ST","StrtImprov","Forum Design","Sidewalk repair as needed in conjunction with building remodel. Ref. BPA 200705111030","2008-06-20 12:24:56","ACTIVE","13156201" "07IE-0713","BAY ST","BAKER ST","LYON ST \ PALACE OF FINE ARTS","StrtImprov","Gonzalez Concrete","","2007-11-01 00:00:00","ACTIVE","2795000" "07IE-0721","20TH ST","HAMPSHIRE ST","YORK ST","StrtImprov","ASSOCIATED BUILDERS","","2007-11-06 00:00:00","ACTIVE","1045000" "07IE-0739","FILBERT ST","LAGUNA ST","BUCHANAN ST","StrtImprov","Maria Vaccaro","","2007-11-19 00:00:00","ACTIVE","5519000" "07IE-0744","ONONDAGA AVE","CAYUGA AVE","WANDA ST","StrtImprov","Gonzalez Concrete","","2007-11-20 00:00:00","ACTIVE","9955000" "07IE-0777","BAKER ST","FILBERT ST","MILEY ST","StrtImprov","Gonzalez Concrete","","2007-12-12 00:00:00","ACTIVE","2632000" "07IE-0787","JACKSON ST","COOPER ALY","WENTWORTH PL","StrtImprov","Golden Gate Concrete","","2007-12-17 00:00:00","ACTIVE","7370000" "07IE-0793","03RD ST","FOLSOM ST","SAINT FRANCIS PL","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2009-01-06 15:34:09","ACTIVE","170000" "07IE-0797","LAGUNA ST","VALLEJO ST","GREEN ST","StrtImprov","Gonzalez Concrete","","2007-12-21 00:00:00","ACTIVE","7976000" "07IE-0800","LYON ST","CLAY ST","WASHINGTON ST","StrtImprov","E.F. Gomez Cement Contractor","","2007-12-21 00:00:00","ACTIVE","8571000" "07IE-0804","HAMPSHIRE ST","25TH ST","26TH ST","StrtImprov","Gonzalez Concrete","","2007-12-26 00:00:00","ACTIVE","6658000" "07MSE-0074","HOWARD ST","FREMONT ST","01ST ST","minorenc","A.R. Sanchez-Corea & Associates, Inc.","New (N) fuel port under the sidewalk with the lid sitting flush with the topping slab located on the Howard Street frontage.","2007-02-14 00:00:00","ACTIVE","7032000" "07MSE-0091","FILLMORE ST","OFARRELL ST","GEARY BLVD","MinorEnc","Richard Tapp","New out-swinging PGE Gas Meter cabinet door encroaching 3'-0" into the public right-of-way","2007-02-15 00:00:00","ACTIVE","5546000" "07MSE-0096","GREEN ST","PIERCE ST","SCOTT ST","MinorEnc","Mark Thomas","Two (2) 30-inch high new railing extending 3 feet 9 inches into the public right way between warped driveway and one (1) step encroaching 5-inch into the public right of way.","2007-08-03 00:00:00","ACTIVE","6477000" "07MSE-0102","POST ST","POWELL ST","MASON ST","minorenc","John Sikora","Existing subsidewalk basement under the public right-of-way fronting subject property (Post Street). Mapping action.","2007-02-21 00:00:00","ACTIVE","10629000" "07MSE-0106","POST ST","POWELL ST","MASON ST","minorenc","Donald S. MacLean, Inc.","","2007-05-08 00:00:00","ACTIVE","10629000" "07MSE-0110","MASONIC AVE","HAIGHT ST","WALLER ST","minorenc","David Grassi","","2008-04-17 00:00:00","ACTIVE","8855000" "07MSE-0142","15TH AVE","GEARY BLVD","ANZA ST","minorenc","Patrick Buscovich & Associates","Leveling landing on Geary Blvd frontage 5ft by 4 ft, and new planter area and box 2 ft by 4 ft","2007-05-01 00:00:00","ACTIVE","609000" "07MSE-0155","ARGUELLO BLVD","GEARY BLVD","ANZA ST","MinorEnc","John W. Lau","Warped Driveway & access encroaches into sidewalk by 5'-6" along with one (1) 30" high planter box & two (2) 36" high pipe railing on both end.","","ACTIVE","2423000" "07MSE-0260","SOUTH VAN NESS AVE","16TH ST","17TH ST","minorenc","GOLDEN GATE TANK REMOVAL","-- Tank Abandonment -- One (1) oil tank under the sidewalk fronting subject property.","2007-05-04 00:00:00","ACTIVE","12023000" "07MSE-0333","ORIZABA AVE","DE LONG ST","END","MinorEnc","Sherman Yan","Concrete retaining wall and stairs encroaching 7’-6” into the 15’ sidewalk per approved plan and per neighborhood pattern","2009-02-09 10:54:25","ACTIVE","9978000" "07MSE-0446","VAN NESS AVE","WASHINGTON ST","JACKSON ST","MinorEnc","DROZDA & OTHER ARCHITECTS","Level landing and outward doorswing at main entrance of the establishment encroach into the sidewalk by 3'-0" max.","2007-09-10 00:00:00","ACTIVE","13161201" "07MSE-0474","UNION ST","CASTLE ST","KEARNY ST","minorenc","SF Garage Co.","New warped driveway with railings encroaching maximum 3'-9" into the public right-of-way. Ref. 07IE-0522","2007-12-03 00:00:00","ACTIVE","12838000" "07MSE-0479","IRVING ST","42ND AVE","43RD AVE","MinorEnc","","Existing fence continuing from behind property line, encroaches 3 feet into public right of way. Ref. NTR 34420","2009-07-14 14:19:42","ACTIVE","7320000" "07MSE-0526","GRANT AVE","JACK KEROUAC ALY","BROADWAY","minorenc","Homy Sikaroudi","Sub-sidewalk Basement on Broadway.","2007-09-05 00:00:00","ACTIVE","6399000" "07MSE-0552","GOUGH ST","FRANCISCO ST","BAY ST","minorenc","GOLDEN GATE TANK REMOVAL","Partial Underground Tank Abandonment (2 feet at the end of the underground storage tank closure in place). Ref. 07TE-0056","2007-09-18 00:00:00","ACTIVE","6352000" "07MSE-0623","VAN NESS AVE","BUSH ST","AUSTIN ST","MinorEnc","Forum Design","Three (E) Subsidewalk Basements @ 153 sq. ft.","2008-06-20 11:03:19","ACTIVE","13156201" "07MSE-0676","SUTTER ST","POLK ST","VAN NESS AVE","minorenc","BRUCE BAUMANN & ASSOCIATES","Shoring & Underpinning","2011-08-23 16:02:46","ACTIVE","12330000" "07PB-0016","ARGUELLO BLVD","CLAY ST","LAKE ST","PipeBarr","Plant Construction Company","","2007-08-13 00:00:00","ACTIVE","2416000" "07S-0065","CAPITOL AVE","MINERVA ST","MONTANA ST","SideSewer","A & B Construction","","2007-04-18 00:00:00","ACTIVE","3664000" "07S-0133","POLK ST","10TH ST \ FELL ST \ MARKET ST","HAYES ST","SideSewer","R & M Underground, Inc.","","2007-08-14 00:00:00","ACTIVE","10546000" "07S-0146","MAIN ST","MISSION ST","","SideSewer","TARA ENGINEERING","","2007-09-06 00:00:00","ACTIVE","24557000" "07S-0146","MISSION ST","MAIN ST","","SideSewer","TARA ENGINEERING","","2007-09-06 00:00:00","ACTIVE","24557000" "07S-0161","HYDE ST","VALLEJO ST","GREEN ST","SideSewer","TARA ENGINEERING","","2007-10-02 00:00:00","ACTIVE","7135000" "07S-0195","INDIANA ST","20TH ST","22ND ST","SideSewer","TARA ENGINEERING","","2007-12-06 00:00:00","ACTIVE","7195000" "07SW-0036","VAN NESS AVE","CLAY ST","WASHINGTON ST","SpecSide","DROZDA & OTHER ARCHITECTS","","2007-09-10 00:00:00","ACTIVE","13160201" "07SW-0048","PACIFIC AVE","FILLMORE ST","STEINER ST","SpecSide","","","2007-10-02 00:00:00","ACTIVE","10155000" "07SW-0057","RANDALL ST","WHITNEY ST","SANCHEZ ST","SpecSide","Levy Art & Architecture, Inc.","Non standard cross slopes not to exceed 4%","2008-05-15 14:50:52","ACTIVE","10913000" "07TOC-0597","MASON ST","EDDY ST","ELLIS ST","TempOccup","SWINERTON BUILDERS","","2007-05-30 00:00:00","ACTIVE","8800000" "08CN-0017","GOLDEN GATE AVE","STANYAN ST","WILLARD NORTH ST","conformity","David Esparza","","2008-09-12 13:03:22","ACTIVE","6288000" "08E-0069","LARKIN ST","TURK ST","EDDY ST","ExcStreet","The Vietnamese Elderly Mutual Assistance Association","Occupying 60 LF of Street Space @ Larkin and Eddy Streets per subject property.","2008-06-18 13:20:04","ACTIVE","8125000" "08IE-0019","BUSH ST","PIERCE ST","","StrtImprov","SF Garage Co.","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector. 1 New Driveway Curb Cut.","2008-09-03 11:12:11","ACTIVE","26632000" "08IE-0019","BUSH ST","SCOTT ST","","StrtImprov","SF Garage Co.","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector. 1 New Driveway Curb Cut.","2008-09-03 11:12:11","ACTIVE","26627000" "08IE-0019","PIERCE ST","BUSH ST","","StrtImprov","SF Garage Co.","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector. 1 New Driveway Curb Cut.","2008-09-03 11:12:11","ACTIVE","26632000" "08IE-0019","SCOTT ST","BUSH ST","","StrtImprov","SF Garage Co.","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector. 1 New Driveway Curb Cut.","2008-09-03 11:12:11","ACTIVE","26627000" "08IE-0020","BLYTHDALE AVE","SANTOS ST","BROOKDALE AVE","StrtImprov","Empire Engineering & Construction Co.","","2008-01-14 00:00:00","ACTIVE","2996000" "08IE-0027","CENTRAL AVE","HAIGHT ST","PAGE ST","StrtImprov","EMMANUEL PUN","New curb cut for new garage. Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2008-06-11 09:04:31","ACTIVE","3861000" "08IE-0028","LYON ST","JACKSON ST","PACIFIC AVE","StrtImprov","","Replace damaged sidewalk per NTR # 36678. Voluntary curb work. Contact BUF for landscaping permit. All work directed by DPW inspector. STREET SPACE INCLUDED.","2008-01-16 00:00:00","ACTIVE","8573000" "08IE-0039","PLEASANT ST","TAYLOR ST","JONES ST","StrtImprov","ARMA GROUP INC.","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2008-09-15 14:23:16","ACTIVE","10509000" "08IE-0041","SPRINGFIELD DR","SLOAT BLVD","EMERALD LN","StrtImprov","Jun's Associates","","2008-01-22 00:00:00","ACTIVE","12053000" "08IE-0059","GOUGH ST","LOMBARD ST","CHESTNUT ST","StrtImprov","On-SITE Maintenance","","2008-02-01 00:00:00","ACTIVE","6350000" "08IE-0069","JUANITA WAY","TERESITA BLVD","FOWLER AVE","StrtImprov","Kwan & Associates","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2008-07-21 14:45:08","ACTIVE","7631000" "08IE-0077","BENNINGTON ST","BOCANA ST \ EUGENIA AVE","CORTLAND AVE","StrtImprov","Gonzalez Concrete","","2008-02-13 00:00:00","ACTIVE","2920000" "08IE-0089","JACKSON ST","BRODERICK ST","BAKER ST","StrtImprov","","Replace damaged sidewalk and curb caused by roots from privately maintained tree per NTR # 34850. Street Space Included.","2008-02-19 00:00:00","ACTIVE","7409000" "08IE-0140","BRODERICK ST","FRANCISCO ST","BAY ST","StrtImprov","JAIDIN CONSULTING GROUP","","2008-03-10 00:00:00","ACTIVE","3220000" "08IE-0167","SUTTER ST","BAKER ST","LYON ST","StrtImprov","Kate Sullivan","","2008-03-21 00:00:00","ACTIVE","12345000" "08IE-0173","PRECITA AVE","HARRISON ST","ALABAMA ST","StrtImprov","Abed Jildeh","","2008-03-25 00:00:00","ACTIVE","10744000" "08IE-0200","19TH AVE","ANZA ST","BALBOA ST","StrtImprov","Western Design Co.","Reconstruct concrete curb and sidewalk with minimum 2' saw-cut / AC paving conform per city standards. All work directed by DPW inspector.","2008-08-06 16:03:06","ACTIVE","906000" "08IE-0232 ","BROADWAY","BUCHANAN ST","WEBSTER ST","StrtImprov","KCA Engineers, Inc.","Reconstuct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2008-12-09 08:53:48","ACTIVE","3176000" "08IE-0232 ","VALLEJO ST","BUCHANAN ST","WEBSTER ST","StrtImprov","KCA Engineers, Inc.","Reconstuct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2008-12-09 08:53:48","ACTIVE","13114000" "08IE-0268","GOETTINGEN ST","OLMSTEAD ST","MANSELL ST","StrtImprov","Joyce Cheng","","2009-07-15 10:06:52","ACTIVE","6240000" "08IE-0269","GOETTINGEN ST","OLMSTEAD ST","MANSELL ST","StrtImprov","Joyce Cheng","","2009-07-15 10:04:22","ACTIVE","6240000" "08IE-0295","CHAVES AVE","EVELYN WAY","AGUA WAY","StrtImprov","ROBIN SHAW","Reconstruct sidewalk & curb with 2' pavement/SW conform as directed by city inspector.","2008-05-06 11:33:34","ACTIVE","3913000" "08IE-0307","10TH AVE","LAWTON ST","MORAGA ST","StrtImprov","Ravindran Subramanian","Reconstruct concrete curb and sidewalk with minimum 2' saw-cut / AC paving conform per city standards. All work directed by DPW inspector.","2008-08-11 14:37:01","ACTIVE","474000" "08IE-0309","ANDOVER ST","EUGENIA AVE","CORTLAND AVE","StrtImprov","2V Design","Reconstruct concrete curb and sidewalk with minimum 2' saw-cut / AC paving conform per city standards. All work directed by DPW inspector.","2008-10-23 14:34:38","ACTIVE","2277000" "08IE-0313","FILBERT ST","LAGUNA ST","BUCHANAN ST","StrtImprov","Glen Wan","NTR 38345 - Repair Curb and Sidewalk damaged by tree roots.","2008-05-12 10:25:30","ACTIVE","5519000" "08IE-0315","FRANKLIN ST","CALIFORNIA ST","SACRAMENTO ST","StrtImprov","CAREY & CO., INC.","Reconstruct concrete curb, sidewalk and parking strip with minimum 2’ saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2008-07-25 14:52:18","ACTIVE","5826000" "08IE-0327","FILBERT ST","OCTAVIA ST","LAGUNA ST","StrtImprov","E.F. Gomez Cement Contractor","Voluntary Curb & Sidewalk improvement.","2008-05-20 10:32:15","ACTIVE","5518000" "08IE-0337","GREENWICH ST","PIERCE ST","SCOTT ST","StrtImprov","SUSANNE GREENWICH","Reconstruct & repair damaged sidewalk & driveway cut to meet city standards per NTR#38369.","2008-05-22 11:15:58","ACTIVE","6521000" "08IE-0367","ANDERSON ST","POWHATTAN AVE","EUGENIA AVE","StrtImprov","Darren McMurtrie","Reconstruct curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base. All work is directed by the BSM inspector.","2009-01-06 15:06:42","ACTIVE","2268000" "08IE-0382","DWIGHT ST","GOETTINGEN ST","HOLYOKE ST","StrtImprov","Mark Schulkamp","Replace & repair sidewalk & curb. All work directed by DPW inspector per NTR # 38228. See DPW Order # 169,946","2008-06-09 12:52:53","ACTIVE","5022000" "08IE-0392","CLEMENTINA ST","05TH ST","06TH ST","StrtImprov","BROWN & CO.","Reconstruct damaged sidewalk & curb as directed by city inspector. reconstruct diveway cut to meet city standards.","2008-06-13 11:05:02","ACTIVE","4200000" "08IE-0403","SACRAMENTO ST","WAVERLY PL","PAGODA PL","StrtImprov","Wayne Hu","Reconstruct sidewalk & curb/parking strip with additional paving per approved plan.","2010-02-04 10:18:39","ACTIVE","11230000" "08IE-0433","MASON ST","WASHINGTON ST","JACKSON ST","StrtImprov","SF Garage Co.","Construct new 15' sidewalk with 3'-6" encroachment (See Permit No. 08MSE-0314), new concrete curb with 10'-0" driveway and saw-cut minimum 2' AC for paving conform fronting the subject property.","2009-01-26 12:43:29","ACTIVE","8818000" "08IE-0439","JUDAH ST","41ST AVE","42ND AVE","StrtImprov","Quen Mak","Relocate 1 driveway curb cut. Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2009-06-16 11:57:05","ACTIVE","7678000" "08IE-0443","UNION ST","GOUGH ST","OCTAVIA ST","StrtImprov","Huntsman Architectural Group","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2008-12-17 11:33:19","ACTIVE","12866000" "08IE-0461","PAGE ST","CLAYTON ST","COLE ST","StrtImprov","D & E Construction","Break curb towards property and create keyway into existing parking strip per NTR # 37324. Repair sidewalk as necessary. All work is directed by the BSM inspector. Street space # 1160265.","2008-07-16 15:06:30","ACTIVE","10186000" "08IE-0463","POST ST","BAKER ST","LYON ST","StrtImprov","SF Garage Co.","Construct New Driveway Curb Cut, curb with 2' pavement conform and sidewalk with 2' Warped Driveway and diverters (08MSE-0342).","2008-10-29 13:57:44","ACTIVE","10655000" "08IE-0470","SAN BRUNO AVE","BEEMAN LN","SOMERSET ST","StrtImprov","Raymond Shia, P.E.","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2009-12-01 10:20:45","ACTIVE","11395000" "08IE-0477","05TH ST","PERRY ST","BRYANT ST \ I-80 E ON RAMP","StrtImprov","SIA Consulting Engineers","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards. (NO warping allowed in sidewalk)","2008-11-06 14:11:51","ACTIVE","303000" "08IE-0484","48TH AVE","SANTIAGO ST","GREAT HWY \ TARAVAL ST","StrtImprov","Gonzalez Concrete","Reconstruct new curb/gutter and sidewalk to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25LF.","2008-07-24 13:19:23","ACTIVE","2077000" "08IE-0505","HOFFMAN AVE","ALVARADO ST","23RD ST","StrtImprov","Santos & Urrutia","To construct (1) new 10'-0" wide standard curb cut.","2008-08-29 15:08:56","ACTIVE","6938000" "08IE-0517","BEALE ST","HOWARD ST","FOLSOM ST","StrtImprov","Carter Burgess","","2009-04-30 09:48:38","ACTIVE","2865000" "08IE-0517","FOLSOM ST","MAIN ST","BEALE ST","StrtImprov","Carter Burgess","","2009-04-30 09:48:38","ACTIVE","5652000" "08IE-0517","HOWARD ST","MAIN ST","BEALE ST","StrtImprov","Carter Burgess","","2009-04-30 09:48:38","ACTIVE","7030000" "08IE-0517","MAIN ST","HOWARD ST","FOLSOM ST","StrtImprov","Carter Burgess","","2009-04-30 09:48:38","ACTIVE","8629000" "08IE-0523","FILLMORE ST","MOULTON ST","LOMBARD ST","StrtImprov","E.F. Gomez Cement Contractor","NTR sidewalk and curb replacement","2008-08-13 14:59:43","ACTIVE","5566000" "08IE-0541","PACIFIC AVE","DIVISADERO ST","RAYCLIFF TER","StrtImprov","Gonzalez Concrete","Voluntary Upgrade. Remove & replace 40LFof concrete curb, gutter & sidewalk w/ min 2' saw-cut / AC paving conform. All work directed by DPW inspector. Street space included. ","2008-08-20 09:40:47","ACTIVE","10159000" "08IE-0553","VICTORIA ST","GARFIELD ST","HOLLOWAY AVE","StrtImprov","E.F. Gomez Cement Contractor","Repair curb, curb cut and sidewalk to City Standards as necessary. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2008-08-26 09:56:21","ACTIVE","13287000" "08IE-0574 ","WASHINGTON ST","BAKER ST","LYON ST","StrtImprov","Golden Gate Concrete","Replace damaged sidewalk and curb near/around tree which has root problems. All work is directed by DPW inspector. NTR 38895. Street space is included.","2008-08-28 15:50:05","ACTIVE","13444000" "08IE-0590","JUNIPERO SERRA BLVD","MERCEDES WAY","ESTERO AVE","StrtImprov","James & Kathleen Bradley","","2008-09-09 14:37:50","ACTIVE","12972000" "08IE-0591","CLAYTON ST","OAK ST","PAGE ST","StrtImprov","Quen Mak","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards.","2009-08-05 10:25:47","ACTIVE","4130000" "08IE-0594","CESAR CHAVEZ ST","SOUTH VAN NESS AVE","CAPP ST \ MISSION ST","StrtImprov","Leonardo M. Beliso","Reconstruct sidewalk and curb per NTR # 38936 ","2008-09-11 11:10:26","ACTIVE","2488201" "08IE-0600","LANSDALE AVE","DALEWOOD WAY \ LUDLOW ALY","BENGAL ALY","StrtImprov","Steve Gray Design ","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. ","2009-08-20 11:57:58","ACTIVE","8104000" "08IE-0603","26TH ST","DOLORES ST","CHURCH ST","StrtImprov","Fougeron Architecture","Reconstruct sidewalk & curb with 2' pavement/SW conform as directed by city inspector.","2008-12-19 12:25:59","ACTIVE","1535000" "08IE-0614","FILBERT ST","GOUGH ST","OCTAVIA ST","StrtImprov","Gabriel Y. Ng & Associates","","2009-03-02 14:05:24","ACTIVE","5517000" "08IE-0618","03RD AVE","ANZA ST","BALBOA ST","StrtImprov","Perry Chiu Kwan Mah","","2008-09-24 13:23:20","ACTIVE","156000" "08IE-0620","DIVISADERO ST","GARDEN ST","POST ST","StrtImprov","SKS INVESTMENTS","New City Standard sidewalk, ADA curb ramps, curb and gutter, curb with parking strip and curb cut fronting the subject location.","2009-04-21 13:35:06","ACTIVE","4812102" "08IE-0626","DORE ST","HOWARD ST","FOLSOM ST","StrtImprov","Michael Heavey Construction","Street Improvement per NTR 32989, Sidewalk bond will be required","2008-09-29 14:27:05","ACTIVE","4929000" "08IE-0632","08TH AVE","LAKE ST","CALIFORNIA ST","StrtImprov","Ann C. Abbas","Repair curb, curb cut and sidewalk to City Standards per NTR #39555. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2008-10-01 12:03:55","ACTIVE","387000" "08IE-0659","HEATHER AVE","MAYFAIR DR","EUCLID AVE","StrtImprov","Lewis M. Merlo, Inc.","Repair curb and sidewalk to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2008-10-15 09:37:14","ACTIVE","6868000" "08IE-0667","INDIANA ST","20TH ST","22ND ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","Remove and reconstruct sidewalk and curb per approved plan. Phase I is for temporary CFC. Street light per SFPUC requirements. Curb paint, crosswalks etc per SFMTA. Final paving and curb ramps under 06IE-0620","2008-10-15 09:54:47","ACTIVE","7195000" "08IE-0667","MINNESOTA ST","20TH ST","22ND ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","Remove and reconstruct sidewalk and curb per approved plan. Phase I is for temporary CFC. Street light per SFPUC requirements. Curb paint, crosswalks etc per SFMTA. Final paving and curb ramps under 06IE-0620","2008-10-15 09:54:47","ACTIVE","9056000" "08IE-0711","EL CAMINO DEL MAR","30TH AVE","LAKE ST","StrtImprov","Gary Bell & Associates","NTR# 34098 & Remove(E)30-feet curb cut and install (N) curb to City Standard as directed per Inspector. ","2008-11-03 16:13:30","ACTIVE","5126000" "08IE-0715","HAMPSHIRE ST","18TH ST","19TH ST","StrtImprov","ALAN MARTINEZ, ARCHITECT","Remove warped driveway and reconstruct sidewalk per City standards. Remove and reconstruct sidewalk, curb, and driveway due to damage from construction per DPW inspector. In conjunction with 09SW-0010. ","2009-03-05 15:43:43","ACTIVE","6651000" "08IE-0729","SHAFTER AVE","KEITH ST","LANE ST","StrtImprov","Ghassan Harb","Replace & Reconstruct sidewalk, curb cut per NTR # 39550 to City Standards as directed by Inspector.","2008-11-12 15:25:01","ACTIVE","11786000" "08IE-0730","CAPRA WAY","PIERCE ST","AVILA ST","StrtImprov","RAYMOND VILLASENOR BUILDING CONTRACTOR","Repair curb and sidewalk per NTR# 40234. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 40' ON PIERCE STREET","2008-11-12 12:19:43","ACTIVE","3685000" "08IE-0731","TARAVAL ST","22ND AVE","23RD AVE","StrtImprov","Thomas Hacker Architects Inc.","Reconstruct & repair damaged sidewalk/curb observed and indentified by city inspector on Taraval/Twenty second avenue/Santiago/Twenty fourth Avenue frontages. Reconstruct portion of curb on Taraval Street to meet city standards.","2010-07-20 10:54:18","ACTIVE","12398000" "08IE-0747","GREEN ST","MASON ST","TAYLOR ST","StrtImprov","Joe Chung Ouyang","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. ","2009-01-21 09:16:52","ACTIVE","6458000" "08IE-0754","CLIPPER ST","DIAMOND ST","DOUGLASS ST","StrtImprov","Greg Klosowski","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2009-05-08 16:23:27","ACTIVE","4216000" "08IE-0772","MISSION ST","ERIE ST","14TH ST","StrtImprov","SF Garage Co.","Reconstruct concrete curb, sidewalk, and gutter. Street is under Moratorium do not damage AC paving. All work directed by DPW inspector.","2009-04-06 14:18:19","ACTIVE","9113000" "08IE-0776","FELTON ST","GIRARD ST","BRUSSELS ST","StrtImprov","Guidry Concrete","Reconstruct cracked sidewalk & portion of curb per NTR#40529 AS DIRECTED by city inspector.","2008-12-10 08:46:53","ACTIVE","5463000" "08IE-0781","06TH AVE","END","LAKE ST","StrtImprov","Kearney & O'Banion, Inc.","Repair curb and sidewalk per NTR #36942 to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2008-12-16 14:16:51","ACTIVE","312000" "08IE-0798","27TH AVE","BALBOA ST","CABRILLO ST","StrtImprov","Fanny Krieger","Repair curb, curb cut and sidewalk per NTR #39433 to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2008-12-29 12:14:38","ACTIVE","1549000" "08MSE-0108 ","STEINER ST","CALIFORNIA ST","PERINE PL","minorenc","ENVELOPE","Level landing.","2008-05-29 10:04:48","ACTIVE","12140000" "08MSE-0206","BUSH ST","TAYLOR ST","JONES ST","MinorEnc","M-J SF Investment LLC","Existing sub-sidewalk basement on Bush Street (10' x 11') Landscaping on Taylor Street with stairs extending into sidewalk approx. 3'","2008-05-08 16:12:08","ACTIVE","3439000" "08MSE-0206","TAYLOR ST","SUTTER ST","BUSH ST","MinorEnc","M-J SF Investment LLC","Existing sub-sidewalk basement on Bush Street (10' x 11') Landscaping on Taylor Street with stairs extending into sidewalk approx. 3'","2008-05-08 16:12:08","ACTIVE","12437000" "08MSE-0258","ANDERSON ST","POWHATTAN AVE","EUGENIA AVE","MinorEnc","Darren McMurtrie","Installing a warped driveway with two (2) planter boxes encroaching 1'-9" into the public right-of-way (sidewalk) for garage access per subject property.","2009-01-06 15:05:21","ACTIVE","2268000" "08MSE-0295","COLUMBUS AVE","PACIFIC AVE","JACK KEROUAC ALY \ SAROYAN PL","MinorEnc","K.Y. Chiu, Engineer","Regrade 10'x14.5' sidewalk to provide level surface at the bottom of new ramp which will be inside property line. Ref. DBI/Access Appeals Commission Meeting Minutes dated Oct. 6, 1998.","2011-01-07 09:12:28","ACTIVE","4290000" "08MSE-0349","SAN BRUNO AVE","BEEMAN LN","SOMERSET ST","MinorEnc","Raymond Shia, P.E.","Existing retaining wall and elevated soil encroaching alon gthe San Bruno Ave frontage per approved plans.","2009-12-02 09:33:13","ACTIVE","11395000" "08MSE-0365","TURK ST","TAYLOR ST","JONES ST","MinorEnc","YA STUDIO","subsidewalk basement","2008-09-10 09:32:14","ACTIVE","12717000" "08MSE-0560","CHERRY ST","WASHINGTON ST","CLAY ST","MinorEnc","HIGH GROUND CONSTRUCTION INC","Existing (e) step and low picket fence.","2008-11-24 12:48:33","ACTIVE","3936000" "08N-329","03RD ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24583000" "08N-329","03RD ST","KEARNY ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","30738000" "08N-329","04TH ST","CLEMENTINA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24589000" "08N-329","04TH ST","CLEMENTINA ST","FOLSOM ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","255000" "08N-329","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24892000" "08N-329","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","STEVENSON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","249000" "08N-329","04TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23938000" "08N-329","04TH ST","HOWARD ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24627000" "08N-329","04TH ST","HOWARD ST","CLEMENTINA ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","254000" "08N-329","04TH ST","JESSIE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24635000" "08N-329","04TH ST","JESSIE ST","MISSION ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","251000" "08N-329","04TH ST","MINNA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24631000" "08N-329","04TH ST","MINNA ST","HOWARD ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","253000" "08N-329","04TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24632000" "08N-329","04TH ST","MISSION ST","MINNA ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","252000" "08N-329","04TH ST","STEVENSON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24636000" "08N-329","04TH ST","STEVENSON ST","JESSIE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","250000" "08N-329","05TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23937000" "08N-329","06TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23941000" "08N-329","07TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24262000" "08N-329","08TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24272000" "08N-329","09TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24246000" "08N-329","10TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24233000" "08N-329","11TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24238000" "08N-329","12TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24347000" "08N-329","13TH ST","BERNICE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33030000" "08N-329","13TH ST","BERNICE ST","ISIS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","549202" "08N-329","13TH ST","DUBOCE AVE \ HWY 101 NORTHBOUND RAMP \ MISSION ST \ OTIS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33027000" "08N-329","13TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24349000" "08N-329","13TH ST","FOLSOM ST","SOUTH VAN NESS AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","550101" "08N-329","13TH ST","FOLSOM ST","SOUTH VAN NESS AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","550201" "08N-329","13TH ST","HARRISON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24228000" "08N-329","13TH ST","HARRISON ST","BERNICE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","549201" "08N-329","13TH ST","HWY 101 S ON RAMP","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","52256000" "08N-329","13TH ST","HWY 101 S ON RAMP","DUBOCE AVE \ HWY 101 NORTHBOUND RAMP \ MISSION ST \ OTIS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","551102" "08N-329","13TH ST","ISIS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33028000" "08N-329","13TH ST","ISIS ST","FOLSOM ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","549203" "08N-329","13TH ST","SOUTH VAN NESS AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24241000" "08N-329","13TH ST","SOUTH VAN NESS AVE","HWY 101 S ON RAMP","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","551101" "08N-329","ASHBURTON PL","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","54155000" "08N-329","BERNICE ST","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33030000" "08N-329","BUSH ST","CHATHAM PL","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24969000" "08N-329","BUSH ST","CHATHAM PL","STOCKTON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","3432000" "08N-329","BUSH ST","CLAUDE LN","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24735000" "08N-329","BUSH ST","CLAUDE LN","MARK LN","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","3429000" "08N-329","BUSH ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24741000" "08N-329","BUSH ST","GRANT AVE","CHATHAM PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","3431000" "08N-329","BUSH ST","KEARNY ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24724000" "08N-329","BUSH ST","KEARNY ST","SAINT GEORGE ALY","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","3427000" "08N-329","BUSH ST","MARK LN","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24736000" "08N-329","BUSH ST","MARK LN","GRANT AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","3430000" "08N-329","BUSH ST","SAINT GEORGE ALY","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24728000" "08N-329","BUSH ST","SAINT GEORGE ALY","CLAUDE LN","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","3428000" "08N-329","BUSH ST","STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24911000" "08N-329","CAMPTON PL","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24661000" "08N-329","CHATHAM PL","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24969000" "08N-329","CLAUDE LN","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24735000" "08N-329","CLEMENTINA ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24589000" "08N-329","COLUMBIA SQUARE ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23926000" "08N-329","DORE ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24234000" "08N-329","DUBOCE AVE","13TH ST \ HWY 101 NORTHBOUND RAMP \ MISSION ST \ OTIS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33027000" "08N-329","ELLIS ST","04TH ST \ MARKET ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24892000" "08N-329","FALMOUTH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23936000" "08N-329","FOLSOM ST","03RD ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24583000" "08N-329","FOLSOM ST","03RD ST","MABINI ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5662000" "08N-329","FOLSOM ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23938000" "08N-329","FOLSOM ST","04TH ST","05TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5664000" "08N-329","FOLSOM ST","05TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23937000" "08N-329","FOLSOM ST","05TH ST","FALMOUTH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5665000" "08N-329","FOLSOM ST","06TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23941000" "08N-329","FOLSOM ST","06TH ST","HARRIET ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5667000" "08N-329","FOLSOM ST","07TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24262000" "08N-329","FOLSOM ST","07TH ST","LANGTON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5673000" "08N-329","FOLSOM ST","08TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24272000" "08N-329","FOLSOM ST","08TH ST","09TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5678000" "08N-329","FOLSOM ST","09TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24246000" "08N-329","FOLSOM ST","09TH ST","DORE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5679000" "08N-329","FOLSOM ST","10TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24233000" "08N-329","FOLSOM ST","10TH ST","JUNIPER ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5681000" "08N-329","FOLSOM ST","11TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24238000" "08N-329","FOLSOM ST","11TH ST","NORFOLK ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5683000" "08N-329","FOLSOM ST","12TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24347000" "08N-329","FOLSOM ST","12TH ST","13TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5685000" "08N-329","FOLSOM ST","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24349000" "08N-329","FOLSOM ST","COLUMBIA SQUARE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23926000" "08N-329","FOLSOM ST","COLUMBIA SQUARE ST","RUSS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5669000" "08N-329","FOLSOM ST","DORE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24234000" "08N-329","FOLSOM ST","DORE ST","10TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5680000" "08N-329","FOLSOM ST","FALMOUTH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23936000" "08N-329","FOLSOM ST","FALMOUTH ST","06TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5666000" "08N-329","FOLSOM ST","HALLAM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24275000" "08N-329","FOLSOM ST","HALLAM ST","RAUSCH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5675000" "08N-329","FOLSOM ST","HARRIET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23924000" "08N-329","FOLSOM ST","HARRIET ST","COLUMBIA SQUARE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5668000" "08N-329","FOLSOM ST","JUNIPER ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24244000" "08N-329","FOLSOM ST","JUNIPER ST","11TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5682000" "08N-329","FOLSOM ST","LANGTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24274000" "08N-329","FOLSOM ST","LANGTON ST","HALLAM ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5674000" "08N-329","FOLSOM ST","MABINI ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24586000" "08N-329","FOLSOM ST","MABINI ST","04TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5663000" "08N-329","FOLSOM ST","MOSS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24263000" "08N-329","FOLSOM ST","MOSS ST","07TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5672000" "08N-329","FOLSOM ST","NORFOLK ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24239000" "08N-329","FOLSOM ST","NORFOLK ST","12TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5684000" "08N-329","FOLSOM ST","RAUSCH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24276000" "08N-329","FOLSOM ST","RAUSCH ST","RODGERS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5676000" "08N-329","FOLSOM ST","RODGERS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24269000" "08N-329","FOLSOM ST","RODGERS ST","08TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5677000" "08N-329","FOLSOM ST","RUSS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24279000" "08N-329","FOLSOM ST","RUSS ST","SHERMAN ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5670000" "08N-329","FOLSOM ST","SHERMAN ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24264000" "08N-329","FOLSOM ST","SHERMAN ST","MOSS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","5671000" "08N-329","GEARY ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24655000" "08N-329","GRANT AVE","ASHBURTON PL","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","54155000" "08N-329","GRANT AVE","ASHBURTON PL","CAMPTON PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6384002" "08N-329","GRANT AVE","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24741000" "08N-329","GRANT AVE","CAMPTON PL","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24661000" "08N-329","GRANT AVE","CAMPTON PL","TILLMAN PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6385000" "08N-329","GRANT AVE","GEARY ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24655000" "08N-329","GRANT AVE","GEARY ST","MAIDEN LN","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6382000" "08N-329","GRANT AVE","HARLAN PL","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24738000" "08N-329","GRANT AVE","HARLAN PL","BUSH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6388000" "08N-329","GRANT AVE","MAIDEN LN","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24649000" "08N-329","GRANT AVE","MAIDEN LN","POST ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6383000" "08N-329","GRANT AVE","MARKET ST \ OFARRELL ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","30768000" "08N-329","GRANT AVE","MARKET ST \ OFARRELL ST","GEARY ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6381000" "08N-329","GRANT AVE","POST ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24660000" "08N-329","GRANT AVE","POST ST","ASHBURTON PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6384001" "08N-329","GRANT AVE","SUTTER ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24662000" "08N-329","GRANT AVE","SUTTER ST","HARLAN PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6387000" "08N-329","GRANT AVE","TILLMAN PL","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24663000" "08N-329","GRANT AVE","TILLMAN PL","SUTTER ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","6386000" "08N-329","HALLAM ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24275000" "08N-329","HARLAN PL","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24738000" "08N-329","HARRIET ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","23924000" "08N-329","HARRISON ST","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24228000" "08N-329","HOWARD ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24627000" "08N-329","HWY 101 NORTHBOUND RAMP","13TH ST \ DUBOCE AVE \ MISSION ST \ OTIS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33027000" "08N-329","HWY 101 S ON RAMP","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","52256000" "08N-329","ISIS ST","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33028000" "08N-329","JESSIE ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24635000" "08N-329","JUNIPER ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24244000" "08N-329","KEARNY ST","03RD ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","30738000" "08N-329","KEARNY ST","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24724000" "08N-329","LANGTON ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24274000" "08N-329","MABINI ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24586000" "08N-329","MAIDEN LN","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24649000" "08N-329","MARK LN","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24736000" "08N-329","MARKET ST","03RD ST \ KEARNY ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","30738000" "08N-329","MARKET ST","03RD ST \ KEARNY ST","GRANT AVE \ OFARRELL ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","8745201" "08N-329","MARKET ST","04TH ST \ ELLIS ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24892000" "08N-329","MARKET ST","GRANT AVE \ OFARRELL ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","30768000" "08N-329","MARKET ST","GRANT AVE \ OFARRELL ST","YERBA BUENA LN","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","8746102" "08N-329","MARKET ST","YERBA BUENA LN","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","54124000" "08N-329","MARKET ST","YERBA BUENA LN","04TH ST \ ELLIS ST \ STOCKTON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","8746103" "08N-329","MINNA ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24631000" "08N-329","MISSION ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24632000" "08N-329","MISSION ST","13TH ST \ DUBOCE AVE \ HWY 101 NORTHBOUND RAMP \ OTIS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33027000" "08N-329","MOSS ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24263000" "08N-329","NORFOLK ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24239000" "08N-329","OFARRELL ST","GRANT AVE \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","30768000" "08N-329","OTIS ST","13TH ST \ DUBOCE AVE \ HWY 101 NORTHBOUND RAMP \ MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","33027000" "08N-329","OTIS ST","GOUGH ST \ MCCOPPIN ST","13TH ST \ DUBOCE AVE \ HWY 101 NORTHBOUND RAMP \ MISSION ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","10048000" "08N-329","POST ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24660000" "08N-329","RAUSCH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24276000" "08N-329","RODGERS ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24269000" "08N-329","RUSS ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24279000" "08N-329","SAINT GEORGE ALY","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24728000" "08N-329","SHERMAN ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24264000" "08N-329","SOUTH VAN NESS AVE","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24241000" "08N-329","STEVENSON ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24636000" "08N-329","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24892000" "08N-329","STOCKTON ST","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24911000" "08N-329","SUTTER ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24662000" "08N-329","TILLMAN PL","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","24663000" "08N-329","YERBA BUENA LN","MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:03:10","ACTIVE","54124000" "08N-330","03RD ST","KEARNY ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","30738000" "08N-330","04TH ST","CLEMENTINA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24589000" "08N-330","04TH ST","CLEMENTINA ST","FOLSOM ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","255000" "08N-330","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24892000" "08N-330","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","STEVENSON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","249000" "08N-330","04TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","23938000" "08N-330","04TH ST","HOWARD ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24627000" "08N-330","04TH ST","HOWARD ST","CLEMENTINA ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","254000" "08N-330","04TH ST","JESSIE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24635000" "08N-330","04TH ST","JESSIE ST","MISSION ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","251000" "08N-330","04TH ST","MINNA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24631000" "08N-330","04TH ST","MINNA ST","HOWARD ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","253000" "08N-330","04TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24632000" "08N-330","04TH ST","MISSION ST","MINNA ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","252000" "08N-330","04TH ST","STEVENSON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24636000" "08N-330","04TH ST","STEVENSON ST","JESSIE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","250000" "08N-330","BUSH ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24741000" "08N-330","CLEMENTINA ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24589000" "08N-330","ELLIS ST","04TH ST \ MARKET ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24892000" "08N-330","FOLSOM ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","23938000" "08N-330","GEARY ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24655000" "08N-330","GRANT AVE","ASHBURTON PL","CAMPTON PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6384002" "08N-330","GRANT AVE","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24741000" "08N-330","GRANT AVE","CAMPTON PL","TILLMAN PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6385000" "08N-330","GRANT AVE","GEARY ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24655000" "08N-330","GRANT AVE","GEARY ST","MAIDEN LN","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6382000" "08N-330","GRANT AVE","HARLAN PL","BUSH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6388000" "08N-330","GRANT AVE","MAIDEN LN","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24649000" "08N-330","GRANT AVE","MAIDEN LN","POST ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6383000" "08N-330","GRANT AVE","MARKET ST \ OFARRELL ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","30768000" "08N-330","GRANT AVE","MARKET ST \ OFARRELL ST","GEARY ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6381000" "08N-330","GRANT AVE","POST ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24660000" "08N-330","GRANT AVE","POST ST","ASHBURTON PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6384001" "08N-330","GRANT AVE","SUTTER ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24662000" "08N-330","GRANT AVE","SUTTER ST","HARLAN PL","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6387000" "08N-330","GRANT AVE","TILLMAN PL","SUTTER ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","6386000" "08N-330","HOWARD ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24627000" "08N-330","JESSIE ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24635000" "08N-330","KEARNY ST","03RD ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","30738000" "08N-330","MAIDEN LN","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24649000" "08N-330","MARKET ST","03RD ST \ KEARNY ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","30738000" "08N-330","MARKET ST","03RD ST \ KEARNY ST","GRANT AVE \ OFARRELL ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","8745201" "08N-330","MARKET ST","04TH ST \ ELLIS ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24892000" "08N-330","MARKET ST","GRANT AVE \ OFARRELL ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","30768000" "08N-330","MARKET ST","GRANT AVE \ OFARRELL ST","YERBA BUENA LN","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","8746102" "08N-330","MARKET ST","YERBA BUENA LN","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","54124000" "08N-330","MARKET ST","YERBA BUENA LN","04TH ST \ ELLIS ST \ STOCKTON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","8746103" "08N-330","MINNA ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24631000" "08N-330","MISSION ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24632000" "08N-330","OFARRELL ST","GRANT AVE \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","30768000" "08N-330","POST ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24660000" "08N-330","STEVENSON ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24636000" "08N-330","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24892000" "08N-330","SUTTER ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","24662000" "08N-330","YERBA BUENA LN","MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-06 10:51:13","ACTIVE","54124000" "08N-334","14TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24372000" "08N-334","15TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24171000" "08N-334","16TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24170000" "08N-334","17TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24165000" "08N-334","18TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24149000" "08N-334","19TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24145000" "08N-334","20TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24144000" "08N-334","21ST ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24113000" "08N-334","22ND ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24111000" "08N-334","23RD ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24094000" "08N-334","24TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24088000" "08N-334","25TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24073000" "08N-334","26TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21306000" "08N-334","29TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21332000" "08N-334","CAPP ST","CESAR CHAVEZ ST \ MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21304000" "08N-334","CATHERINE CT","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","54175000" "08N-334","CESAR CHAVEZ ST","CAPP ST \ MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21304000" "08N-334","CLARION ALY","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24164000" "08N-334","FAIR AVE","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21337000" "08N-334","MISSION ST","14TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24372000" "08N-334","MISSION ST","14TH ST","15TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9114000" "08N-334","MISSION ST","15TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24171000" "08N-334","MISSION ST","15TH ST","16TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9115000" "08N-334","MISSION ST","16TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24170000" "08N-334","MISSION ST","16TH ST","17TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9116000" "08N-334","MISSION ST","17TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24165000" "08N-334","MISSION ST","17TH ST","CLARION ALY","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9117000" "08N-334","MISSION ST","18TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24149000" "08N-334","MISSION ST","18TH ST","19TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9120000" "08N-334","MISSION ST","19TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24145000" "08N-334","MISSION ST","19TH ST","20TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9121000" "08N-334","MISSION ST","20TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24144000" "08N-334","MISSION ST","20TH ST","CATHERINE CT","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9122001" "08N-334","MISSION ST","21ST ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24113000" "08N-334","MISSION ST","21ST ST","22ND ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9123000" "08N-334","MISSION ST","22ND ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24111000" "08N-334","MISSION ST","22ND ST","23RD ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9124000" "08N-334","MISSION ST","23RD ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24094000" "08N-334","MISSION ST","23RD ST","24TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9125000" "08N-334","MISSION ST","24TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24088000" "08N-334","MISSION ST","24TH ST","25TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9126000" "08N-334","MISSION ST","25TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24073000" "08N-334","MISSION ST","25TH ST","26TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9127000" "08N-334","MISSION ST","26TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21306000" "08N-334","MISSION ST","26TH ST","CAPP ST \ CESAR CHAVEZ ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9128000" "08N-334","MISSION ST","29TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21332000" "08N-334","MISSION ST","29TH ST","VIRGINIA AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9134000" "08N-334","MISSION ST","CAPP ST \ CESAR CHAVEZ ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21304000" "08N-334","MISSION ST","CAPP ST \ CESAR CHAVEZ ST","PRECITA AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9129000" "08N-334","MISSION ST","CATHERINE CT","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","54175000" "08N-334","MISSION ST","CATHERINE CT","21ST ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9122002" "08N-334","MISSION ST","CLARION ALY","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24164000" "08N-334","MISSION ST","CLARION ALY","SYCAMORE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9118000" "08N-334","MISSION ST","FAIR AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21337000" "08N-334","MISSION ST","FAIR AVE","VALENCIA ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9132000" "08N-334","MISSION ST","POWERS AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21339000" "08N-334","MISSION ST","POWERS AVE","FAIR AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9131000" "08N-334","MISSION ST","PRECITA AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21340000" "08N-334","MISSION ST","PRECITA AVE","POWERS AVE","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9130000" "08N-334","MISSION ST","SYCAMORE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24163000" "08N-334","MISSION ST","SYCAMORE ST","18TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9119000" "08N-334","MISSION ST","VALENCIA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21338000" "08N-334","MISSION ST","VALENCIA ST","29TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","9133000" "08N-334","MISSION ST","VIRGINIA AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21331000" "08N-334","POWERS AVE","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21339000" "08N-334","PRECITA AVE","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21340000" "08N-334","SYCAMORE ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","24163000" "08N-334","VALENCIA ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21338000" "08N-334","VIRGINIA AVE","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-10-07 13:37:38","ACTIVE","21331000" "08N-341","06TH ST","GOLDEN GATE AVE \ MARKET ST \ TAYLOR ST","","NightNoise","Pacific Gas & Electric","","2008-10-14 14:13:42","ACTIVE","24922000" "08N-341","GOLDEN GATE AVE","06TH ST \ MARKET ST \ TAYLOR ST","","NightNoise","Pacific Gas & Electric","","2008-10-14 14:13:42","ACTIVE","24922000" "08N-341","MARKET ST","06TH ST \ GOLDEN GATE AVE \ TAYLOR ST","","NightNoise","Pacific Gas & Electric","","2008-10-14 14:13:42","ACTIVE","24922000" "08N-341","MARKET ST","06TH ST \ GOLDEN GATE AVE \ TAYLOR ST","07TH ST \ CHARLES J BRENHAM PL","NightNoise","Pacific Gas & Electric","","2008-10-14 14:13:42","ACTIVE","8750101" "08N-341","TAYLOR ST","06TH ST \ GOLDEN GATE AVE \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2008-10-14 14:13:42","ACTIVE","24922000" "08N-359 ","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24892000" "08N-359 ","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","STEVENSON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","249000" "08N-359 ","04TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23938000" "08N-359 ","04TH ST","JESSIE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24635000" "08N-359 ","04TH ST","JESSIE ST","MISSION ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","251000" "08N-359 ","04TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24632000" "08N-359 ","04TH ST","STEVENSON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24636000" "08N-359 ","04TH ST","STEVENSON ST","JESSIE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","250000" "08N-359 ","05TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23937000" "08N-359 ","06TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23941000" "08N-359 ","07TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24262000" "08N-359 ","08TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24272000" "08N-359 ","09TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24246000" "08N-359 ","COLUMBIA SQUARE ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23926000" "08N-359 ","ELLIS ST","04TH ST \ MARKET ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24892000" "08N-359 ","FALMOUTH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23936000" "08N-359 ","FOLSOM ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23938000" "08N-359 ","FOLSOM ST","04TH ST","05TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5664000" "08N-359 ","FOLSOM ST","05TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23937000" "08N-359 ","FOLSOM ST","05TH ST","FALMOUTH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5665000" "08N-359 ","FOLSOM ST","06TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23941000" "08N-359 ","FOLSOM ST","06TH ST","HARRIET ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5667000" "08N-359 ","FOLSOM ST","07TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24262000" "08N-359 ","FOLSOM ST","07TH ST","LANGTON ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5673000" "08N-359 ","FOLSOM ST","08TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24272000" "08N-359 ","FOLSOM ST","08TH ST","09TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5678000" "08N-359 ","FOLSOM ST","09TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24246000" "08N-359 ","FOLSOM ST","COLUMBIA SQUARE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23926000" "08N-359 ","FOLSOM ST","COLUMBIA SQUARE ST","RUSS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5669000" "08N-359 ","FOLSOM ST","FALMOUTH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23936000" "08N-359 ","FOLSOM ST","FALMOUTH ST","06TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5666000" "08N-359 ","FOLSOM ST","HALLAM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24275000" "08N-359 ","FOLSOM ST","HALLAM ST","RAUSCH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5675000" "08N-359 ","FOLSOM ST","HARRIET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23924000" "08N-359 ","FOLSOM ST","HARRIET ST","COLUMBIA SQUARE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5668000" "08N-359 ","FOLSOM ST","LANGTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24274000" "08N-359 ","FOLSOM ST","LANGTON ST","HALLAM ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5674000" "08N-359 ","FOLSOM ST","MOSS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24263000" "08N-359 ","FOLSOM ST","MOSS ST","07TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5672000" "08N-359 ","FOLSOM ST","RAUSCH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24276000" "08N-359 ","FOLSOM ST","RAUSCH ST","RODGERS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5676000" "08N-359 ","FOLSOM ST","RODGERS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24269000" "08N-359 ","FOLSOM ST","RODGERS ST","08TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5677000" "08N-359 ","FOLSOM ST","RUSS ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24279000" "08N-359 ","FOLSOM ST","RUSS ST","SHERMAN ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5670000" "08N-359 ","FOLSOM ST","SHERMAN ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24264000" "08N-359 ","FOLSOM ST","SHERMAN ST","MOSS ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","5671000" "08N-359 ","HALLAM ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24275000" "08N-359 ","HARRIET ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","23924000" "08N-359 ","JESSIE ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24635000" "08N-359 ","LANGTON ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24274000" "08N-359 ","MARKET ST","04TH ST \ ELLIS ST \ STOCKTON ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24892000" "08N-359 ","MISSION ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24632000" "08N-359 ","MOSS ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24263000" "08N-359 ","RAUSCH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24276000" "08N-359 ","RODGERS ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24269000" "08N-359 ","RUSS ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24279000" "08N-359 ","SHERMAN ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24264000" "08N-359 ","STEVENSON ST","04TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24636000" "08N-359 ","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-04 09:09:40","ACTIVE","24892000" "08N-362","GUERRERO ST","LAGUNA ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30757000" "08N-362","HWY 101 NORTHBOUND","HWY 101 SOUTHBOUND \ MARKET ST \ OCTAVIA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30756000" "08N-362","HWY 101 SOUTHBOUND","HWY 101 NORTHBOUND \ MARKET ST \ OCTAVIA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30756000" "08N-362","LAGUNA ST","GUERRERO ST \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30757000" "08N-362","MARKET ST","GUERRERO ST \ LAGUNA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30757000" "08N-362","MARKET ST","HWY 101 NORTHBOUND \ HWY 101 SOUTHBOUND \ OCTAVIA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30756000" "08N-362","MARKET ST","HWY 101 NORTHBOUND \ HWY 101 SOUTHBOUND \ OCTAVIA ST","OCTAVIA ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","8760202" "08N-362","MARKET ST","OCTAVIA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","35006000" "08N-362","MCCOPPIN ST","HWY 101 NORTHBOUND \ HWY 101 SOUTHBOUND \ MARKET ST \ OCTAVIA ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30756000" "08N-362","OCTAVIA ST","HWY 101 NORTHBOUND \ HWY 101 SOUTHBOUND \ MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","30756000" "08N-362","OCTAVIA ST","MARKET ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-10 09:43:06","ACTIVE","35006000" "08N-368","09TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24246000" "08N-368","10TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24233000" "08N-368","11TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24238000" "08N-368","12TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24347000" "08N-368","13TH ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24349000" "08N-368","DORE ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24234000" "08N-368","FOLSOM ST","09TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24246000" "08N-368","FOLSOM ST","09TH ST","DORE ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5679000" "08N-368","FOLSOM ST","10TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24233000" "08N-368","FOLSOM ST","10TH ST","JUNIPER ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5681000" "08N-368","FOLSOM ST","11TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24238000" "08N-368","FOLSOM ST","11TH ST","NORFOLK ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5683000" "08N-368","FOLSOM ST","12TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24347000" "08N-368","FOLSOM ST","12TH ST","13TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5685000" "08N-368","FOLSOM ST","13TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24349000" "08N-368","FOLSOM ST","DORE ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24234000" "08N-368","FOLSOM ST","DORE ST","10TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5680000" "08N-368","FOLSOM ST","JUNIPER ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24244000" "08N-368","FOLSOM ST","JUNIPER ST","11TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5682000" "08N-368","FOLSOM ST","NORFOLK ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24239000" "08N-368","FOLSOM ST","NORFOLK ST","12TH ST","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","5684000" "08N-368","JUNIPER ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24244000" "08N-368","NORFOLK ST","FOLSOM ST","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-18 09:35:03","ACTIVE","24239000" "08N-370","09TH AVE","GEARY BLVD","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-12 08:44:22","ACTIVE","27289000" "08N-370","GEARY BLVD","09TH AVE","","NightNoise","SBC - Pacific Bell Engineering","","2008-11-12 08:44:22","ACTIVE","27289000" "08S-0118","LARKIN ST","FERN ST","BUSH ST","SideSewer","Uniacke Construction","Install new 8" side sewer connection to City main.","2008-07-25 13:51:53","ACTIVE","8137000" "08S-0131","15TH AVE","WAWONA ST","WEST PORTAL AVE","SideSewer","TARA ENGINEERING","Install a new 6" side sewer to an existing 12" main with 4 hours of inspection. Street Space #1159431. ","2008-08-13 09:15:56","ACTIVE","631000" "08S-0132","15TH AVE","WAWONA ST","WEST PORTAL AVE","SideSewer","TARA ENGINEERING","Install a new 6" side sewer lateral connecting to the existing 8" sewer main.","2008-08-13 09:16:36","ACTIVE","631000" "08S-0133","15TH AVE","WAWONA ST","WEST PORTAL AVE","SideSewer","TARA ENGINEERING","Install a new 6" side sewer to an existing 12" main with 4 hours of inspection. Street Space #1159432.","2008-08-13 09:22:08","ACTIVE","631000" "08S-0151","MOULTRIE ST","CRESCENT AVE","END","SideSewer","ALPINE CONSTRUCTION","To construct a new sewer lateral to the existing sewer main.","2008-09-10 12:09:59","ACTIVE","9419000" "08SW-0181","22ND ST","VICKSBURG ST","SANCHEZ ST","SpecSide","Best Design & Construction Company","Existing non-standard cross slopes at 4.8% max","2009-12-15 08:47:40","ACTIVE","1202000" "08SW-0193","POLK ST","TURK ST","EDDY ST","SpecSide","PREMUIM ROOFING WATERPROOFING","Elastodeck 5000","2008-12-04 14:28:16","ACTIVE","10554000" "09BW-0008","MISSION ST","ONONDAGA AVE","FRANCE AVE","Boring","GOLDEN GATE TANK REMOVAL","Soil sampling, restore concrete street base and AC","2009-01-13 13:41:40","ACTIVE","9172101" "09BW-0067","01ST ST","HOWARD ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24532000" "09BW-0067","01ST ST","MINNA ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24542000" "09BW-0067","01ST ST","NATOMA ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24534000" "09BW-0067","02ND ST","MINNA ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24594000" "09BW-0067","02ND ST","NATOMA ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24543000" "09BW-0067","BEALE ST","HOWARD ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24506000" "09BW-0067","BEALE ST","MISSION ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24554000" "09BW-0067","BEALE ST","MISSION ST","HOWARD ST","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","2864000" "09BW-0067","FREMONT ST","HOWARD ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24527000" "09BW-0067","FREMONT ST","NATOMA ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24533000" "09BW-0067","HOWARD ST","01ST ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24532000" "09BW-0067","HOWARD ST","BEALE ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24506000" "09BW-0067","HOWARD ST","BEALE ST","FREMONT ST","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","7031000" "09BW-0067","HOWARD ST","FREMONT ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24527000" "09BW-0067","HOWARD ST","FREMONT ST","01ST ST","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","7032000" "09BW-0067","HOWARD ST","MAIN ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24504000" "09BW-0067","MAIN ST","HOWARD ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24504000" "09BW-0067","MAIN ST","MISSION ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24557000" "09BW-0067","MAIN ST","MISSION ST","HOWARD ST","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","8628000" "09BW-0067","MINNA ST","01ST ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24542000" "09BW-0067","MINNA ST","02ND ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24594000" "09BW-0067","MINNA ST","SHAW ALY","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24600000" "09BW-0067","MISSION ST","BEALE ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24554000" "09BW-0067","MISSION ST","MAIN ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24557000" "09BW-0067","MISSION ST","MAIN ST","BEALE ST","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","9085000" "09BW-0067","NATOMA ST","01ST ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24534000" "09BW-0067","NATOMA ST","01ST ST","02ND ST","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","9507000" "09BW-0067","NATOMA ST","02ND ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24543000" "09BW-0067","NATOMA ST","FREMONT ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24533000" "09BW-0067","SHAW ALY","MINNA ST","","Boring","Exaro Technologies Corporation","(65) Pot holings to identify (E) utilities @ 2nd/Minna, 2nd/Natoma, 1st/Minna, 1st/Natoma, 1st/Howard, Fremont/Howard, Beale/Mission, Beale/Howard, Main/Mission, Main/Howard, misc..","2009-10-13 10:25:11","ACTIVE","24600000" "09BW-0071","GUERRERO ST","16TH ST","CAMP ST","Boring","CONESTOGA ROVERS & ASSOCIATES","Boring monitoring for three location alon east side of Guerrero Street 100 LF Street Space","2010-01-21 15:58:37","ACTIVE","6578101" "09CN-0034","41ST AVE","SANTIAGO ST","TARAVAL ST","conformity","Martin Gaffney","","2009-05-19 10:18:24","ACTIVE","1921000" "09CN-0083","23RD ST","EUREKA ST","DOUGLASS ST","conformity","Michael Connell Architect","","2009-09-29 11:47:27","ACTIVE","1285000" "09CN-0084","PRENTISS ST","POWHATTAN AVE","EUGENIA AVE","conformity","Marc Lindsell Architecture","","2009-09-29 14:04:59","ACTIVE","10754000" "09CN-0108","CLAY ST","PIERCE ST","SCOTT ST","conformity","James Stavoy Architect","","2009-12-02 12:51:45","ACTIVE","4114000" "09CN-0119","NAYLOR ST","CHICAGO WAY","BALTIMORE WAY","conformity","MAHALAT ENGINEERING CORP","","2009-12-23 16:26:13","ACTIVE","9526000" "09E-0012","BAY SHORE BLVD","SUNNYDALE AVE","END","ExcStreet","Exaro Technologies Corporation","7 Potholes for locating utilities. 2 hrs of inspection. (ref. 08E-0135)","2009-03-03 09:15:57","ACTIVE","2827101" "09E-0012","SUNNYDALE AVE","END","BAY SHORE BLVD","ExcStreet","Exaro Technologies Corporation","7 Potholes for locating utilities. 2 hrs of inspection. (ref. 08E-0135)","2009-03-03 09:15:57","ACTIVE","12254000" "09E-0013","PACIFIC AVE","LARKIN ST","POLK ST","ExcStreet","Gorman Pipeline Inc","Installing new PG&E electrical service.","2009-01-23 13:48:30","ACTIVE","10146000" "09E-0089","VARENNES ST","GREEN ST","UNION ST","ExcStreet","K.J. Woods Construction","New Gas","2009-06-10 10:37:52","ACTIVE","13178000" "09E-0155","18TH ST","VALENCIA ST","LAPIDGE ST","ExcStreet","Gorman Pipeline Inc","Install a new transformer vault on Valencia St frontage, tranching for new electrical service fronting Valencia St and 18th St. Already have street space until 2/4/2010 Receipt# 1191247 , Application # M175105.","2009-10-01 14:19:46","ACTIVE","881000" "09E-0155","VALENCIA ST","18TH ST","19TH ST","ExcStreet","Gorman Pipeline Inc","Install a new transformer vault on Valencia St frontage, tranching for new electrical service fronting Valencia St and 18th St. Already have street space until 2/4/2010 Receipt# 1191247 , Application # M175105.","2009-10-01 14:19:46","ACTIVE","13064000" "09E-0203","FILBERT ST","GOUGH ST","OCTAVIA ST","ExcStreet","GALLAGHER CONSTRUCTION, INC.","Trench for a New PG&E Gas line.","2009-12-23 11:14:26","ACTIVE","5517000" "09EXC-0945","MADERA ST","WISCONSIN ST","","Excavation","San Francisco Water Department","wisconsin and madera ","2009-02-17 15:29:24","ACTIVE","23704000" "09EXC-0945","WISCONSIN ST","MADERA ST","","Excavation","San Francisco Water Department","wisconsin and madera ","2009-02-17 15:29:24","ACTIVE","23704000" "09EXC-1062","GILMAN AVE","GRIFFITH ST","","Excavation","San Francisco Water Department","gilman and griffith","2009-02-20 08:40:05","ACTIVE","20096000" "09EXC-1062","GRIFFITH ST","GILMAN AVE","","Excavation","San Francisco Water Department","gilman and griffith","2009-02-20 08:40:05","ACTIVE","20096000" "09EXC-1962","GEARY ST","LEAVENWORTH ST","HYDE ST","Excavation","Pacific Gas & Electric","765 Geary St","2009-03-31 15:02:48","ACTIVE","6115000" "09EXC-2932","VALLEJO ST","FRANKLIN ST","GOUGH ST","Excavation","Shaw Pipeline Inc.","North University Moound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Jack & bore work in the intersections of Vallejo St./ Franklin St. and Vallejo St./ Van Ness Ave.) (SFWD Contract No. WD-2543)","2009-05-12 08:39:47","ACTIVE","13110000" "09EXC-2932","VALLEJO ST","POLK ST","VAN NESS AVE","Excavation","Shaw Pipeline Inc.","North University Moound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Jack & bore work in the intersections of Vallejo St./ Franklin St. and Vallejo St./ Van Ness Ave.) (SFWD Contract No. WD-2543)","2009-05-12 08:39:47","ACTIVE","13108000" "09EXC-2932","VALLEJO ST","VAN NESS AVE","FRANKLIN ST","Excavation","Shaw Pipeline Inc.","North University Moound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Jack & bore work in the intersections of Vallejo St./ Franklin St. and Vallejo St./ Van Ness Ave.) (SFWD Contract No. WD-2543)","2009-05-12 08:39:47","ACTIVE","13109000" "09EXC-3223","BROADWAY","BUCHANAN ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26658000" "09EXC-3223","BROADWAY","BUCHANAN ST","WEBSTER ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","3176000" "09EXC-3223","BROADWAY","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26578000" "09EXC-3223","BROADWAY","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","3175000" "09EXC-3223","BROADWAY","OCTAVIA ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26571000" "09EXC-3223","BROADWAY","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","3174000" "09EXC-3223","BROADWAY","WEBSTER ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26655000" "09EXC-3223","BUCHANAN ST","BROADWAY","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26658000" "09EXC-3223","FRANKLIN ST","VALLEJO ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26553000" "09EXC-3223","GOUGH ST","VALLEJO ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26572000" "09EXC-3223","LAGUNA ST","BROADWAY","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26578000" "09EXC-3223","OCTAVIA ST","BROADWAY","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26571000" "09EXC-3223","OCTAVIA ST","BROADWAY","VALLEJO ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","9897000" "09EXC-3223","OCTAVIA ST","VALLEJO ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26575000" "09EXC-3223","PACIFIC AVE","WEBSTER ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26656000" "09EXC-3223","VALLEJO ST","FRANKLIN ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26553000" "09EXC-3223","VALLEJO ST","FRANKLIN ST","GOUGH ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","13110000" "09EXC-3223","VALLEJO ST","GOUGH ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26572000" "09EXC-3223","VALLEJO ST","GOUGH ST","OCTAVIA ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","13111000" "09EXC-3223","VALLEJO ST","OCTAVIA ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26575000" "09EXC-3223","VALLEJO ST","VAN NESS AVE","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26552000" "09EXC-3223","VALLEJO ST","VAN NESS AVE","FRANKLIN ST","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","13109000" "09EXC-3223","VAN NESS AVE","VALLEJO ST","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26552000" "09EXC-3223","WEBSTER ST","BROADWAY","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26655000" "09EXC-3223","WEBSTER ST","PACIFIC AVE","","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","26656000" "09EXC-3223","WEBSTER ST","PACIFIC AVE","BROADWAY","Excavation","Shaw Pipeline Inc.","North University Mound System Upgrade - Water Main Installation, Sewer Replacement and Pavement Renovation (Central Segment) (SFWD Contract No. WD-2543) ","2009-05-27 14:12:29","ACTIVE","13551000" "09EXC-5077","PACIFIC AVE","FRANKLIN ST","GOUGH ST","Excavation","Pacific Gas & Electric","1812 PACIFIC AVE","2009-09-17 14:41:36","ACTIVE","10149000" "09EXC-5385","POLK ST","WILLOW ST","","Excavation","Pacific Gas & Electric","Polk & Willow Intersection work.","2009-09-08 11:14:22","ACTIVE","25177000" "09EXC-5385","WILLOW ST","POLK ST","","Excavation","Pacific Gas & Electric","Polk & Willow Intersection work.","2009-09-08 11:14:22","ACTIVE","25177000" "09IE-0006","CENTRAL AVE","GROVE ST","FULTON ST","StrtImprov","Michael Heavey Construction","Repair dammaged sidewalk and curb, trim overgrown tree branches per NTR No: 40946. Approximately 18 LF of curb repairs required. All work directed by DPW inspector.","2009-01-06 11:52:09","ACTIVE","3865000" "09IE-0010","JULIUS ST","LOMBARD ST","END","StrtImprov","Lewis M. Merlo, Inc.","Repair collapsing / seperating sidewalk curb and gutter on Julius St. Must provide proof of Bollard Permit prior to final sign-off. ","2009-01-08 12:40:56","ACTIVE","7700000" "09IE-0027","WAYLAND ST","BRUSSELS ST","GOETTINGEN ST","StrtImprov","Mike Moore","Reconstruct 315 sq.ft of 3-1/2" concrete sidewalk and 12 LF of curb fronting the subject location per NTR No. 40571. ","2009-01-20 11:51:30","ACTIVE","13506000" "09IE-0038","OAK ST","GOUGH ST","OCTAVIA ST","StrtImprov","Colombeau Construction","Recostruct concrete sidewalk, curb & parking strip with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW Inspector. ","2009-04-01 11:26:33","ACTIVE","9752000" "09IE-0050","COLE ST","OAK ST","PAGE ST","StrtImprov","Mary Notsch and Frank Moreman","Remove and relocate (E) driveway cut per approved plan for a new garage. Reconstruct sidewalk per City Standards ","2009-03-16 08:30:40","ACTIVE","4237000" "09IE-0053","PINE ST","LAGUNA ST","BUCHANAN ST","StrtImprov","David Cumby","Reconstruct concrete curb, sidewalk and parking strip with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. ","2009-05-01 13:13:27","ACTIVE","10482000" "09IE-0066","CENTRAL AVE","HAYES ST","GROVE ST","StrtImprov","Shatara Architecture","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work direct by DPW inspector. Install detectable surface to curb ramps. ","2009-05-01 12:24:44","ACTIVE","3864000" "09IE-0069","DAY ST","SANCHEZ ST","NOE ST","StrtImprov","Kieran Boughan Architect","Reconstruct sidewalk & curb with 2'/pavement/SW conform to match existing as directed by city inspector.","2009-10-19 14:33:58","ACTIVE","4621000" "09IE-0105","09TH ST","MISSION ST","MINNA ST","StrtImprov","BRUCE BAUMANN & ASSOCIATES","Reconstruct concrete curb, sidewalk and concrete parking strip per city standards with 2' AC conform. Construct one (1) new curb cut and one (1) new disability curb ramp as per plans.","2011-05-26 10:17:01","ACTIVE","448000" "09IE-0116","WHITNEY ST","30TH ST","RANDALL ST","StrtImprov","Calzadilla/Talania Associates","Remove and reconstruct new curb cut for a new garage per approved plan, remove and reconstruct-damaged sidewalk per City Standards and per guidelines from DPW/BSM Inspector.","2009-09-18 09:36:52","ACTIVE","13608000" "09IE-0126","CORONA ST","URBANO DR","END","StrtImprov","F. FERRANDO & CO.","Replace damaged sidewalk and driveway per NTR #40608. Street space included. Preserve survey monument. ","2009-03-11 13:26:25","ACTIVE","4412000" "09IE-0127","CORONA ST","URBANO DR","END","StrtImprov","F. FERRANDO & CO.","Replace damaged sidewalk and driveway per NTR #41605. Street space included. Preserve survey monument.","2009-03-11 13:33:24","ACTIVE","4412000" "09IE-0130","CALIFORNIA ST","OCTAVIA ST","LAGUNA ST","StrtImprov","Bush Construction","Voluntary upgrade. Reconstruct concrete curb, sidewalk, parking strip and driveway with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space included. ","2009-03-12 14:43:44","ACTIVE","3553000" "09IE-0138","32ND AVE","EL CAMINO DEL MAR","CALIFORNIA ST","StrtImprov","Lewis M. Merlo, Inc.","Repair curb, curb cut and sidewalk as necessary to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2009-03-18 08:57:51","ACTIVE","1699000" "09IE-0151","TENNESSEE ST","20TH ST","22ND ST","StrtImprov","Gabriel Y. Ng & Associates","Reconstruct new curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base as directed by the BSM inspector.","2010-10-04 11:42:58","ACTIVE","12485000" "09IE-0202","25TH AVE","KIRKHAM ST","LAWTON ST","StrtImprov","E.F. Gomez Cement Contractor","Volunteer work, remove and reconstruct damaged sidewalk per City Standard and as directed by inspector. Permit includes one car space (20')","2009-04-22 15:59:23","ACTIVE","1384000" "09IE-0224","23RD AVE","JUDAH ST","KIRKHAM ST","StrtImprov","Best Design & Construction Company","Reconstruct concrete sidewalk & curb with min. 2' saw-cut / AC paving conform per City and County of San Francisco Standards. All work directed by DPW Inspector.","2009-04-29 10:47:00","ACTIVE","1220000" "09IE-0246","CLARENCE PL","END","TOWNSEND ST","StrtImprov","BRUCE BAUMANN & ASSOCIATES","","2011-10-21 09:27:02","ACTIVE","4066000" "09IE-0246","TOWNSEND ST","STANFORD ST","CLARENCE PL","StrtImprov","BRUCE BAUMANN & ASSOCIATES","","2011-10-21 09:27:02","ACTIVE","12657000" "09IE-0250","CENTRAL AVE","FELL ST","HAYES ST","StrtImprov","S & H Concrete Construction","Repair curb and sidewalk per NTR# 41724. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 25 LF.","2009-05-06 13:19:28","ACTIVE","3863000" "09IE-0251","CENTRAL AVE","FELL ST","HAYES ST","StrtImprov","S & H Concrete Construction","Repair curb and sidewalk per NTR# 41728. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 20 LF.","2009-05-06 13:30:38","ACTIVE","3863000" "09IE-0252","CENTRAL AVE","FELL ST","HAYES ST","StrtImprov","S & H Concrete Construction","Repair curb and sidewalk per NTR# 41727. Provide 2-foot pavement conform. All work is directed by the BSM inspector. Street space 20 LF.","2009-05-06 13:42:19","ACTIVE","3863000" "09IE-0261","SACRAMENTO ST","MAPLE ST","CHERRY ST","StrtImprov","Gary Bell & Associates","","2009-06-18 14:21:04","ACTIVE","11270000" "09IE-0268","SURREY ST","CASTRO ST","UNNAMED 025","StrtImprov","SMG DESIGN","Reconstruct new curb/parking strip and sidewalk to City Standards. Install two (2) curb ramps at the corner. Saw-cut 2’ of AC gutter and replace with 2” ACWS on 8” concrete base as directed by the BSM inspector.","2010-01-29 14:20:55","ACTIVE","12297000" "09IE-0287","16TH ST","JULIAN AVE","RONDEL PL","StrtImprov","Sunset Concrete","Repair parking strip and sidewalk at the curb return as necessary per City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector.","2009-05-22 16:37:20","ACTIVE","729000" "09IE-0351","23RD ST","ARKANSAS ST","WISCONSIN ST","StrtImprov","Lewis M. Merlo, Inc.","Replace damaged sidewalk and curb on both frontages; possible tree root problems; Contact SF Water Dept to replace utility vault if damaged; replant tree in tree basin on 23rd St.","2009-06-22 10:23:14","ACTIVE","1242000" "09IE-0351","WISCONSIN ST","MADERA ST","23RD ST","StrtImprov","Lewis M. Merlo, Inc.","Replace damaged sidewalk and curb on both frontages; possible tree root problems; Contact SF Water Dept to replace utility vault if damaged; replant tree in tree basin on 23rd St.","2009-06-22 10:23:14","ACTIVE","13697000" "09IE-0381","CLAY ST","JONES ST","LEAVENWORTH ST","StrtImprov","Levy Art & Architecture, Inc.","","2010-02-26 11:35:35","ACTIVE","4102000" "09IE-0405","CHATTANOOGA ST","21ST ST","22ND ST","StrtImprov","Ken Martin","Reconstruct sidewalk and curb to city standards. [with 2' AC pavement conform] All work is directed by DPW inspector.","2010-09-14 11:08:10","ACTIVE","3909000" "09IE-0410","VALLEJO ST","GRANT AVE","COLUMBUS AVE","StrtImprov","Architectural Resources Group","Remove and replace curb & sidewalk per approved plan; per City standards; and per guidelines from City Inspector. Two (2) ft. street conform required.","2010-04-21 09:48:47","ACTIVE","13092000" "09IE-0412","BAY SHORE BLVD","CORTLAND AVE","WATERLOO ST","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","2801101" "09IE-0412","BAY SHORE BLVD","FLOWER ST","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","20815000" "09IE-0412","BAY SHORE BLVD","WATERLOO ST","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","21021000" "09IE-0412","FLOWER ST","BAY SHORE BLVD","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","20815000" "09IE-0412","FLOWER ST","LOOMIS ST","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","20791000" "09IE-0412","LOOMIS ST","FLOWER ST","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","20791000" "09IE-0412","LOOMIS ST","WATERLOO ST","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","20790000" "09IE-0412","WATERLOO ST","BAY SHORE BLVD","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","21021000" "09IE-0412","WATERLOO ST","LOOMIS ST","","StrtImprov","AMS Associates, Inc.","Reconstruct sidewalk & curb/parking strip/gutter with 2' pavement/SW conform per city standards on Bayshore Blvd/Waterloo/Loomis Street frontages.","2010-05-28 08:02:10","ACTIVE","20790000" "09IE-0429","OFARRELL ST","DIVISADERO ST","BRODERICK ST","StrtImprov","BANA CONSTRUCTION, INC.","","2010-05-06 11:28:28","ACTIVE","9742000" "09IE-0444","HAYES ST","COLE ST","SHRADER ST","StrtImprov","SF Garage Co.","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2010-01-26 13:46:48","ACTIVE","6833000" "09IE-0457","ALABAMA ST","17TH ST","MARIPOSA ST","StrtImprov","Patrick Buscovich & Associates","","2009-07-30 09:36:43","ACTIVE","2110000" "09IE-0476","35TH AVE","MORAGA ST","NORIEGA ST","StrtImprov","Hargen's Inc./ Jose Valdovinos","NTR 927259 - 280 sf of sidewalk & 37 lf of curb w/ 2 ft asphalt conform. ","2009-08-10 09:55:19","ACTIVE","1774000" "09IE-0476","NORIEGA ST","34TH AVE","35TH AVE","StrtImprov","Hargen's Inc./ Jose Valdovinos","NTR 927259 - 280 sf of sidewalk & 37 lf of curb w/ 2 ft asphalt conform. ","2009-08-10 09:55:19","ACTIVE","9668000" "09IE-0478","19TH ST","SOUTH VAN NESS AVE","CAPP ST","StrtImprov","Ryan Ming Yan Lam","marked squares and curb with white dots must be repaired/replaced per city standards. Remove grass & weeds from tree basin.","2009-08-11 08:48:49","ACTIVE","970000" "09IE-0501","18TH AVE","ORTEGA ST","PACHECO ST","StrtImprov","E.F. Gomez Cement Contractor","Reconstruct sidewalk, curb cut and curb to city standards per NTR # 927964 as directed by inspector","2009-08-19 16:14:43","ACTIVE","841000" "09IE-0502","JULES AVE","GRAFTON AVE","HOLLOWAY AVE","StrtImprov","E.F. Gomez Cement Contractor","Reconstruct sidewalk, curb cut and curb to city standards per NTR # 928122 as directed by inspector","2009-08-19 16:24:17","ACTIVE","7693000" "09IE-0505","MOUNT VERNON AVE","SAN MIGUEL ST","TARA ST","StrtImprov","D. Lopez Jr Concrete","NTR #927432. On San Miguel: Remove unpermitted fence and driveway ramp, abandoned driveway and reconstruct curb and sidewalk. Street space included. ","2009-08-20 15:06:03","ACTIVE","9432000" "09IE-0516","UPPER TER","MASONIC AVE","ASHBURY TER","StrtImprov","Lewis M. Merlo, Inc.","Repair curb and sidewalk per City Standards. Provide 2' pavement conform. All work is directed by the BSM inspector.","2009-08-24 11:02:12","ACTIVE","13015000" "09IE-0521","EXECUTIVE PARK BLVD","CRESCENT WAY","HARNEY WAY","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2009-09-08 10:44:33","ACTIVE","5374000" "09IE-0521","EXECUTIVE PARK BLVD","SANDPIPER COVE WAY \ THOMAS MELLON DR","CRESCENT WAY","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2009-09-08 10:44:33","ACTIVE","5373101" "09IE-0541","CLAYTON ST","CARL ST","PARNASSUS AVE","StrtImprov","Annuzzi's Concrete","NTR #927256. Replace damaged sidewalk including curb cut & trim overgrown branches. All work directed by DPW inspector. Street space included. ","2009-09-08 10:50:36","ACTIVE","4135000" "09IE-0542","08TH AVE","MORAGA ST","NORIEGA ST","StrtImprov","Janet Dickey","NTR #929145. Trim overgrown tree branches; replace damaged sidewalk including driveway, possible tree root problem. All work directed by DPW inspector. Street space included.","2009-09-09 08:27:56","ACTIVE","400000" "09IE-0545","STANYAN BLVD","STANYAN ST \ TURK BLVD","","StrtImprov","Toby Long Design","Reconstruct sidewalk & curb with 2 FT A/C conform per city standards. All work is directed by DPW inspector.","2010-07-08 16:14:22","ACTIVE","26486000" "09IE-0545","STANYAN ST","STANYAN BLVD \ TURK BLVD","","StrtImprov","Toby Long Design","Reconstruct sidewalk & curb with 2 FT A/C conform per city standards. All work is directed by DPW inspector.","2010-07-08 16:14:22","ACTIVE","26486000" "09IE-0545","TURK BLVD","STANYAN BLVD \ STANYAN ST","","StrtImprov","Toby Long Design","Reconstruct sidewalk & curb with 2 FT A/C conform per city standards. All work is directed by DPW inspector.","2010-07-08 16:14:22","ACTIVE","26486000" "09IE-0547","BAY ST","MASON ST","TAYLOR ST","StrtImprov","D. Lopez Jr Concrete","NTR #928344. Replace sidewalk squares marked with white dots. Curb repair. There are parts that are sunken, damaged & spalling. Possible tree root issues. All work directed by DPW inspector. Street space included. ","2009-09-11 16:33:23","ACTIVE","2776000" "09IE-0547","TAYLOR ST","BAY ST","NORTH POINT ST","StrtImprov","D. Lopez Jr Concrete","NTR #928344. Replace sidewalk squares marked with white dots. Curb repair. There are parts that are sunken, damaged & spalling. Possible tree root issues. All work directed by DPW inspector. Street space included. ","2009-09-11 16:33:23","ACTIVE","12463000" "09IE-0556","EXCELSIOR AVE","MISSION ST","LONDON ST","StrtImprov","Hargen's Inc./ Jose Valdovinos","NTR 927603 - repair 70 sq ft sidewalk & 9 linear feet of curb. ","2009-09-15 17:12:22","ACTIVE","5359000" "09IE-0564","GREENWICH ST","OCTAVIA ST","LAGUNA ST","StrtImprov","SF Garage Co.","","2010-03-05 10:53:18","ACTIVE","6515000" "09IE-0576","35TH AVE","NORIEGA ST","ORTEGA ST","StrtImprov","Joseph Vaccaro & Company","NTR# 929253 - replace damaged sidewalk and curb on noriega st frontage","2009-09-24 11:31:57","ACTIVE","1775000" "09IE-0586","BATTERY ST","JACKSON ST","PACIFIC AVE","StrtImprov","Lewis M. Merlo, Inc.","Remove and replace topping slab and curb; per approved plan; per City Standard; and per guidelines from City inspector.","2009-11-25 11:17:59","ACTIVE","2761000" "09IE-0591","FILLMORE ST","GREEN ST","UNION ST","StrtImprov","Earle Weiss ","Relocate 1 Driveway Curb Cut. Reconstruct Sidewalk, new warping in front of bldg flanked by 2 new Planter Boxes. Ref. 10MSE-0262 & BPA 200807287807","2010-09-13 17:07:49","ACTIVE","5561000" "09IE-0615","WALLER ST","BELVEDERE ST","COLE ST","StrtImprov","Lewis M. Merlo, Inc.","ntr 136735 replace damaged sidewalk and curb at driveway/ street space also included","2009-10-13 11:40:55","ACTIVE","13378000" "09IE-0622","CENTRAL AVE","GROVE ST","FULTON ST","StrtImprov","Topetcher Architecture","Construct 1 New Warped Driveway, 1 Standard Driveway Curb Cut, 1 Planter, 2 Guardrails & 6" curbs. Top of Guardrails will be 2.5 ft from sidewalk surface. Ref. 09MSE-0466 & BPA 200901099929","2010-11-17 11:39:20","ACTIVE","3865000" "09IE-0629","PRECITA AVE","FLORIDA ST","BRYANT ST","StrtImprov","William Walters","Remove and replace curb & sidewalk, including curb cut, per approved plan; per City standards; and per guidelines from City inspector. Also, provide 2-ft. street conform.","2010-03-09 09:27:58","ACTIVE","10750000" "09IE-0636","TINGLEY ST","MISSION ST","ALEMANY BLVD","StrtImprov","D. Lopez Jr Concrete Construction","NTR #929186. Replace damaged sidewalk including driveway/ curb cut; trim overgrown tree branches. Street Space included.","2009-10-26 14:25:28","ACTIVE","12613000" "09IE-0637","TINGLEY ST","MISSION ST","ALEMANY BLVD","StrtImprov","D. Lopez Jr Concrete Construction","NTR #929187. Replace damaged sidewalk including curb. Street Space included.","2009-10-26 14:29:17","ACTIVE","12613000" "09IE-0640","VICENTE ST","15TH AVE","16TH AVE","StrtImprov","ANDREW LEE","Reconstruct damaged sidewalk & portion of curb per NTR#42110 as directed by city inspector.","2009-10-26 13:57:44","ACTIVE","13241000" "09IE-0668","MOSCOW ST","FRANCE AVE","ITALY AVE","StrtImprov","ASSOCIATED BUILDERS","NTR 932282 - Repair 150 sq ft of Sidewalk and 9 LF of Curb.","2009-11-12 15:45:28","ACTIVE","9403000" "09IE-0669","PALOU AVE","ARELIOUS WALKER DR","END","StrtImprov","Wilson Engineering & Transportation Consultants, Inc.","Reconstruct curb and sidewalk to City Standards. Install (2) 12-foot curb cuts at garage entrances.","2010-08-13 09:19:17","ACTIVE","10214000" "09IE-0669","PALOU AVE","END","GRIFFITH ST","StrtImprov","Wilson Engineering & Transportation Consultants, Inc.","Reconstruct curb and sidewalk to City Standards. Install (2) 12-foot curb cuts at garage entrances.","2010-08-13 09:19:17","ACTIVE","10215000" "09IE-0689","GRAFTON AVE","PLYMOUTH AVE","GRANADA AVE","StrtImprov","KENNETH CHAN","Reconstruct sidewalk & curb with 2'pavement/SW conform per city standards.","2009-12-07 13:10:23","ACTIVE","6359000" "09IE-0690","20TH AVE","CLEMENT ST","GEARY BLVD","StrtImprov","KIERAN P. ROHAN","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards.","2009-12-11 13:35:45","ACTIVE","1000000" "09IE-0706","OAK ST","FRANKLIN ST","GOUGH ST","StrtImprov","Lewis M. Merlo, Inc.","Break curb towards property and create a keyway due to moratorium street. Reconstruct sidewalk for a tree pit. Provide 2-foot pavment conform. All work is directed by the BSM inspector.","2009-12-09 08:46:57","ACTIVE","9751000" "09IE-0720","PACIFIC AVE","SCOTT ST","DIVISADERO ST","StrtImprov","Dumican Mosey Architects","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards.","2010-03-03 13:54:10","ACTIVE","10158000" "09IE-0722","ARBOR ST","SWISS AVE","DIAMOND HEIGHTS BLVD","StrtImprov","AZ Design and Engineering, Inc.","Reconstruct concrete curb and sidewalk per city standards. All work is directed by DPW inspector. Conform on adjacent sidewalk. (See conditions)","2010-07-30 15:00:14","ACTIVE","2394000" "09IE-0730","UPPER TER","CLIFFORD TER","MONUMENT WAY","StrtImprov","Schwartz and Architecture","Reconstruct sidewalk & curb with 2' pavement conform per approved plan on Clifford Terrace frontage.","2010-03-17 13:49:30","ACTIVE","13017000" "09MSE-0010","POWELL ST","FISHER ALY","BROADWAY \ ROBERT C LEVY TUNL","MinorEnc","CES Controlled Environmental Services","Spill Bucket","2009-01-12 13:33:22","ACTIVE","10692000" "09MSE-0043","DUBOCE AVE","BELCHER ST","SANCHEZ ST","MinorEnc","Kennerly Architecture","Four planters.","2009-03-27 09:22:41","ACTIVE","4987000" "09MSE-0069","CLAY ST","PRESIDIO AVE","WALNUT ST","MinorEnc","Ian Glidden","Existing step.","2009-02-24 14:48:44","ACTIVE","4120000" "09MSE-0124","BAY ST","HYDE ST","LARKIN ST","MinorEnc","JAIDIN CONSULTING GROUP","Existing (e) concrete step encroaching 2'-0" into sidewalk.","","ACTIVE","2781000" "09MSE-0159","LANSDALE AVE","DALEWOOD WAY \ LUDLOW ALY","BENGAL ALY","MinorEnc","Steve Gray Design ","The neighbor's existing (e) retaining wall is built over the property line. ","2009-09-09 15:38:31","ACTIVE","8104000" "09MSE-0160","GOLDEN GATE AVE","POLK ST","VAN NESS AVE","MinorEnc","Webcor Builders","Shoring. Tie-Backs in Golden Gate Ave., Polk St., and Redwood Alley","2009-06-30 10:35:26","ACTIVE","6265000" "09MSE-0160","POLK ST","REDWOOD ST","GOLDEN GATE AVE","MinorEnc","Webcor Builders","Shoring. Tie-Backs in Golden Gate Ave., Polk St., and Redwood Alley","2009-06-30 10:35:26","ACTIVE","10551000" "09MSE-0160","REDWOOD ST","POLK ST","VAN NESS AVE","MinorEnc","Webcor Builders","Shoring. Tie-Backs in Golden Gate Ave., Polk St., and Redwood Alley","2009-06-30 10:35:26","ACTIVE","10955000" "09MSE-0180","DUNCAN ST","CHURCH ST","SANCHEZ ST","MinorEnc","Gus Konstin","Historical Society ok'd stair landing.","2009-05-01 11:28:16","ACTIVE","5001000" "09MSE-0359","LEAVENWORTH ST","SACRAMENTO ST","CLAY ST","MinorEnc","Hood Thomas Architects","NEW stair encroaclhing 3-3" into public sidewalk right of way. New stair encroaching 3'-3" into public sidewalk right of way. ","2010-11-15 11:27:15","ACTIVE","8251000" "09MSE-0419","MISSION ST","LASKIE ST","09TH ST","MinorEnc","SV Builders","Removing (E) hatch doors and replace with structural slab over an existing sub-sidewalk.","2009-09-09 16:19:20","ACTIVE","9104000" "09MSE-0430","COLE ST","FREDERICK ST","CARL ST","MinorEnc","EDIT","A new warped driveway and two new diverter railings encroaching a maximum of three (3) feet and one (1) inch into the public right of way.","2010-03-26 09:08:16","ACTIVE","4242000" "09MSE-0532","DETROIT ST","STAPLES AVE","FLOOD AVE","MinorEnc","Leidecker Fredrick Erling","install and maintain a wrought iron fence which to encroach 14 feet into the public sidewalk right-of-way , and to install and maintain a brick planter box at the Staples Street frontage of the subject property.","2010-06-21 09:33:01","ACTIVE","4724000" "09MSE-0537","DIAMOND ST","26TH ST","CESAR CHAVEZ ST","MinorEnc","PROFESSIONAL CONCRETE SERVICE","Reduce (E) ramp encroachment to 4' max. and provide a planter box as diverter. (Ref: NTR#93189)","2009-12-02 10:32:42","ACTIVE","4750000" "09MSE-0555","PACIFIC AVE","SCOTT ST","DIVISADERO ST","MinorEnc","Dumican Mosey Architects","Existing (e) steps encroaching 1'-3" into the public right-of-way.","2010-03-03 13:26:07","ACTIVE","10158000" "09N-0021","09TH ST","LARKIN ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2009-03-09 15:10:45","ACTIVE","30745000" "09N-0021","LARKIN ST","09TH ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2009-03-09 15:10:45","ACTIVE","30745000" "09N-0021","MARKET ST","09TH ST \ LARKIN ST","","NightNoise","Pacific Gas & Electric","","2009-03-09 15:10:45","ACTIVE","30745000" "09N-0023","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Webcor Builders","","2009-03-11 13:36:09","ACTIVE","2864000" "09N-0023","FREMONT ST","MISSION ST","TRANSBAY HUMP","NightNoise","Webcor Builders","","2009-03-11 13:36:09","ACTIVE","5861001" "09N-0023","MISSION ST","BEALE ST","FREMONT ST","NightNoise","Webcor Builders","","2009-03-11 13:36:09","ACTIVE","9086000" "09N-0025","MONTGOMERY ST","CALIFORNIA ST","SACRAMENTO ST","NightNoise","SBC - Pacific Bell Engineering","","2009-03-10 15:26:44","ACTIVE","9301000" "09N-0045","MARKET ST","03RD ST \ KEARNY ST","GRANT AVE \ OFARRELL ST","NightNoise","Pacific Gas & Electric","","2009-04-10 15:38:58","ACTIVE","8745101" "09N-0077","MARKET ST","POWELL ST","05TH ST \ CYRIL MAGNIN ST","NightNoise","SBC - Pacific Bell Engineering","","2009-05-11 08:29:16","ACTIVE","8747103" "09N-0078","MARKET ST","MCALLISTER ST","JONES ST","NightNoise","SBC - Pacific Bell Engineering","","2009-05-11 08:31:59","ACTIVE","8750202" "09N-0091","05TH ST","MINNA ST","NATOMA ST","NightNoise","Manuel Brothers, Inc.","","2009-05-22 10:05:26","ACTIVE","294000" "09N-0124","KEARNY ST","SUTTER ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-07-17 08:12:50","ACTIVE","24720000" "09N-0124","SUTTER ST","KEARNY ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-07-17 08:12:50","ACTIVE","24720000" "09N-0141","SANSOME ST","COMMERCIAL ST","CLAY ST","NightNoise","SBC - Pacific Bell Engineering","","2009-07-27 15:10:10","ACTIVE","11548000" "09N-0142","GRANT AVE","SUTTER ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-07-27 15:12:34","ACTIVE","24662000" "09N-0142","GRANT AVE","TILLMAN PL","SUTTER ST","NightNoise","SBC - Pacific Bell Engineering","","2009-07-27 15:12:34","ACTIVE","6386000" "09N-0142","SUTTER ST","CLAUDE LN","GRANT AVE","NightNoise","SBC - Pacific Bell Engineering","","2009-07-27 15:12:34","ACTIVE","12320000" "09N-0142","SUTTER ST","GRANT AVE","","NightNoise","SBC - Pacific Bell Engineering","","2009-07-27 15:12:34","ACTIVE","24662000" "09N-0146","KEARNY ST","MAIDEN LN","POST ST","NightNoise","SBC - Pacific Bell Engineering","","2009-08-04 10:22:53","ACTIVE","7748000" "09N-0146","KEARNY ST","POST ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-08-04 10:22:53","ACTIVE","24644000" "09N-0146","POST ST","KEARNY ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-08-04 10:22:53","ACTIVE","24644000" "09N-0150","03RD ST","FOLSOM ST","SAINT FRANCIS PL","NightNoise","Time Warner Telecom of California","","2009-08-04 11:05:11","ACTIVE","170000" "09N-0150","FOLSOM ST","03RD ST","MABINI ST","NightNoise","Time Warner Telecom of California","","2009-08-04 11:05:11","ACTIVE","5662000" "09N-0151","OFARRELL ST","POLK ST","","NightNoise","Pacific Gas & Electric","","2009-08-04 14:16:22","ACTIVE","25179000" "09N-0151","POLK ST","OFARRELL ST","","NightNoise","Pacific Gas & Electric","","2009-08-04 14:16:22","ACTIVE","25179000" "09N-0151","POLK ST","OLIVE ST","OFARRELL ST","NightNoise","Pacific Gas & Electric","","2009-08-04 14:16:22","ACTIVE","10558000" "09N-0152","GRANT AVE","JACKSON ST","PACIFIC AVE","NightNoise","Pacific Gas & Electric","","2009-08-11 10:17:04","ACTIVE","6397000" "09N-0152","SUTTER ST","CLAUDE LN","GRANT AVE","NightNoise","Pacific Gas & Electric","","2009-08-11 10:17:04","ACTIVE","12320000" "09N-0152","SUTTER ST","MASON ST","TAYLOR ST","NightNoise","Pacific Gas & Electric","","2009-08-11 10:17:04","ACTIVE","12324000" "09N-0178","09TH ST","LARKIN ST \ MARKET ST","JESSIE ST","NightNoise","SBC - Pacific Bell Engineering","","2009-09-29 11:33:43","ACTIVE","446000" "09N-0191","LARKIN ST","MCALLISTER ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-10-07 14:52:39","ACTIVE","24439000" "09N-0191","MCALLISTER ST","LARKIN ST","","NightNoise","SBC - Pacific Bell Engineering","","2009-10-07 14:52:39","ACTIVE","24439000" "09N-0216","03RD ST","16TH ST","MARIPOSA ST","NightNoise","Pacific Gas & Electric","","2009-11-03 10:41:18","ACTIVE","186201" "09N-0216","GEARY ST","GRANT AVE","STOCKTON ST","NightNoise","Pacific Gas & Electric","","2009-11-03 10:41:18","ACTIVE","6108000" "09N-0216","STEVENSON ST","06TH ST","07TH ST","NightNoise","Pacific Gas & Electric","","2009-11-03 10:41:18","ACTIVE","12171000" "09S-0001","STEINER ST","GERMANIA ST","WALLER ST","SideSewer","Gorman Pipeline Inc","Install a 6" side sewer connecting to a 15" main with 4 hours of inspection time.","2009-01-06 11:19:51","ACTIVE","12118000" "09S-0012 ","BRIDGEVIEW WAY","MISSION BAY BLVD \ VARA ST","","SideSewer","R & M Underground, Inc.","Install a 15" SD connecting to a new manhole on a 12" existing main with 4 hours of inspection time on Bridgeview Way.","2009-01-13 09:20:57","ACTIVE","34185000" "09S-0012 ","MISSION BAY BLVD","BRIDGEVIEW WAY \ VARA ST","","SideSewer","R & M Underground, Inc.","Install a 15" SD connecting to a new manhole on a 12" existing main with 4 hours of inspection time on Bridgeview Way.","2009-01-13 09:20:57","ACTIVE","34185000" "09S-0012 ","VARA ST","BRIDGEVIEW WAY \ MISSION BAY BLVD","","SideSewer","R & M Underground, Inc.","Install a 15" SD connecting to a new manhole on a 12" existing main with 4 hours of inspection time on Bridgeview Way.","2009-01-13 09:20:57","ACTIVE","34185000" "09S-0034","LIPPARD AVE","CHENERY ST","BOSWORTH ST","SideSewer","M.C. Dixon","Repair existing side sewer connecting to an existing sewer main.","2009-02-10 09:34:25","ACTIVE","8401000" "09S-0035","LIPPARD AVE","CHENERY ST","BOSWORTH ST","SideSewer","M.C. Dixon","To repair existing side sewer connecting to an existing sewer main.","2009-02-10 09:41:02","ACTIVE","8401000" "09S-0100","OFARRELL ST","DIVISADERO ST","BRODERICK ST","SideSewer","R & M Underground, Inc.","To install 6" side sewer to the city main.","2009-06-12 08:22:27","ACTIVE","9742000" "09S-0138","LOCKSLEY AVE","LAWTON ST \ WARREN DR","MORAGA ST","SideSewer","Benjamin Franklin Plumbing","Repair an existing 6" side sewer to a 15" main with 4 hours of inspection . All work directed by DPW inspector. Street space included. ","2009-09-09 10:48:42","ACTIVE","8420000" "09S-0143","LAKE ST","17TH AVE","18TH AVE","SideSewer","M.C. Dixon","Repair an existing 6" side sewer to a 5'-0" circular brick main with 4 hours of inspection. Street space #1193625. ","2009-09-15 11:41:19","ACTIVE","8026000" "09S-0144","LAKE ST","17TH AVE","18TH AVE","SideSewer","M.C. Dixon","Repair an existing 6" side sewer to a 5'-0" circular brick main with 4 hours of inspection. Street space included.","2009-09-15 11:49:16","ACTIVE","8026000" "09S-0145","LAKE ST","17TH AVE","18TH AVE","SideSewer","M.C. Dixon","Repair a 6" side sewer to an existing 5-0" circular brick main with 4 hours of inspection. Street space included.","2009-09-15 11:55:06","ACTIVE","8026000" "09S-0168","LOUISBURG ST","MOUNT VERNON AVE","MARGARET AVE \ RIDGE LN","SideSewer","Kingdom Pipelines, Inc.","Side sewer for 351 Louisburg st","2009-10-23 14:14:30","ACTIVE","8502000" "09SW-0055","MORAGA ST","10TH AVE","11TH AVE","SpecSide","Rchitecture","Existing high cross slopes maximum 4.4%.","2009-07-24 08:14:40","ACTIVE","9336000" "09SW-0058","ELLSWORTH ST","BERNAL HEIGHTS BLVD","POWHATTAN AVE","SpecSide","Peter Liang","Existing non-standard cross-slopes 2.4%","2009-08-25 12:20:09","ACTIVE","5194000" "09SW-0106","19TH ST","MINNESOTA ST","INDIANA ST","SpecSide","TECTA associates","Non-standard cross-slopes fronting 814 Irving St ranging from 2.5% to 4.05%.","2009-10-06 10:46:27","ACTIVE","939000" "09SW-0117","DETROIT ST","STAPLES AVE","FLOOD AVE","SpecSide","Leidecker Fredrick Erling","(N) stamped concrete & general landscaping","2010-06-21 09:32:26","ACTIVE","4724000" "09TA-0002","BATTERY ST","BROADWAY","VALLEJO ST","TankAband","CES Controlled Environmental Services","One 4,000 gallon tank in vault.","2009-02-13 12:13:31","ACTIVE","2763000" "09TOC-0060","VALENCIA ST","14TH ST","15TH ST","TempOccup","HATTON'S CRANE & RIGGING","","2009-01-14 08:12:04","ACTIVE","13057000" "09TOC-0060","VALENCIA ST","14TH ST","ROSA PARKS LN","TempOccup","HATTON'S CRANE & RIGGING","","2009-01-14 08:12:04","ACTIVE","13057001" "09WR-0044","MANSELL ST","UNIVERSITY ST","","Wireless","Newpath Networks, LLC.","","2009-07-21 10:16:24","ACTIVE","20871000" "09WR-0044","UNIVERSITY ST","MANSELL ST","","Wireless","Newpath Networks, LLC.","","2009-07-21 10:16:24","ACTIVE","20871000" "09WR-0045 ","BOWDOIN ST","WOOLSEY ST","","Wireless","Newpath Networks, LLC.","","2009-07-23 14:15:53","ACTIVE","20868000" "09WR-0045 ","WOOLSEY ST","BOWDOIN ST","","Wireless","Newpath Networks, LLC.","","2009-07-23 14:15:53","ACTIVE","20868000" "09WR-0046","AVALON AVE","LA GRANDE AVE","","Wireless","Newpath Networks, LLC.","","2009-07-21 10:21:05","ACTIVE","21615000" "09WR-0046","AVALON AVE","MOSCOW ST","LA GRANDE AVE","Wireless","Newpath Networks, LLC.","","2009-07-21 10:21:05","ACTIVE","2564000" "09WR-0046","LA GRANDE AVE","AVALON AVE","","Wireless","Newpath Networks, LLC.","","2009-07-21 10:21:05","ACTIVE","21615000" "09WR-0075","11TH AVE","LINCOLN WAY","IRVING ST","Wireless","Omnipoint Communications, Inc. (T-Mobile)","","2009-07-14 14:31:02","ACTIVE","500000" "09WR-0144","ALEMANY BLVD","ELLSWORTH ST \ I-280 S OFF RAMP \ I-280 S ON RAMP","","Wireless","Newpath Networks, LLC.","","2009-12-21 14:53:57","ACTIVE","20996000" "09WR-0144","ALEMANY BLVD","ELLSWORTH ST \ I-280 S OFF RAMP \ I-280 S ON RAMP","END","Wireless","Newpath Networks, LLC.","","2009-12-21 14:53:57","ACTIVE","2157203" "09WR-0144","ALEMANY BLVD","FOLSOM ST","ELLSWORTH ST \ I-280 S OFF RAMP \ I-280 S ON RAMP","Wireless","Newpath Networks, LLC.","","2009-12-21 14:53:57","ACTIVE","2157202" "09WR-0144","ELLSWORTH ST","ALEMANY BLVD \ I-280 S OFF RAMP \ I-280 S ON RAMP","","Wireless","Newpath Networks, LLC.","","2009-12-21 14:53:57","ACTIVE","20996000" "09WR-0144","I-280 S OFF RAMP","ALEMANY BLVD \ ELLSWORTH ST \ I-280 S ON RAMP","","Wireless","Newpath Networks, LLC.","","2009-12-21 14:53:57","ACTIVE","20996000" "09WR-0144","I-280 S ON RAMP","ALEMANY BLVD \ ELLSWORTH ST \ I-280 S OFF RAMP","","Wireless","Newpath Networks, LLC.","","2009-12-21 14:53:57","ACTIVE","20996000" "10BW-0040","HOLLIS ST","ELLIS ST","OFARRELL ST","Boring","GREGG DRILLING","One (1) 50' deep bore on Hollis St frontage. Repair public right of way to city standards. (20LF of street space)","2010-11-03 12:01:43","ACTIVE","6955000" "10CN-0050","JEFFERSON ST","SCOTT ST","DIVISADERO ST","conformity","Ken Zinns Architect","","2010-08-13 09:31:02","ACTIVE","7462000" "10E-0005","UNION ST","FILLMORE ST","STEINER ST","ExcStreet","CASTLE CONSTUCTORS","To excavate PG&E electric conduit extending 47' to the existing conduit box.","2010-01-08 12:41:08","ACTIVE","12872000" "10E-0021","22ND ST","SHOTWELL ST","SOUTH VAN NESS AVE","ExcStreet","ACE Drilling & Excavation","Install new 1" PLHP (DB) service.","2010-02-26 15:13:21","ACTIVE","1188000" "10E-0022","OLIVE ST","VAN NESS AVE","FRANKLIN ST","ExcStreet","ACE Drilling & Excavation","One (N) 6 inch main line (extend ~ 141 ft west and connect to (E) 6 inch main in Franklin St), then one (N) 2 inch domestic service line and one (N) 6 inch fire service line will be connected to the new main from property.","2010-03-30 13:12:22","ACTIVE","9920000" "10E-0064","VALENCIA ST","18TH ST","19TH ST","ExcStreet","VALENCIA SF PROPERTIES, LLC","To excavate for water piping installation. JLD ELECTRIC IS DOING THE EXCAVATION WORK.","2010-05-18 11:50:08","ACTIVE","13064000" "10E-0079","HARRISON ST","CESAR CHAVEZ ST","PRECITA AVE","ExcStreet","ACE Drilling & Excavation","To install gas piping as permitted by PG&E to the street main.","2010-06-15 11:40:19","ACTIVE","6760000" "10E-0098","FOLSOM ST","18TH ST","19TH ST","ExcStreet","M Squared Construction, Inc.","Install electrical connection for PG&E from (N) utility box on sidewalk towards the property.","2010-08-03 11:28:56","ACTIVE","5693000" "10E-0149","ALANA WAY","EXECUTIVE PARK BLVD","HARNEY WAY \ THOMAS MELLON CIR","ExcStreet","Super Excavators, Inc.","Temporary water service. 150sq ft on Alana Way & 30 sq ft on Executive Park Blvd","2010-11-17 08:39:52","ACTIVE","2142000" "10E-0149","EXECUTIVE PARK BLVD","ALANA WAY","BLANKEN AVE","ExcStreet","Super Excavators, Inc.","Temporary water service. 150sq ft on Alana Way & 30 sq ft on Executive Park Blvd","2010-11-17 08:39:52","ACTIVE","5371000" "10E-0151","ALVARADO ST","HOFFMAN AVE","DIXIE ALY \ GRAND VIEW AVE","ExcStreet","TARA ENGINEERING","Phase #1: Potholing to install new PG&E gasline on sidewalk and street. Phase #2: Replace 15'x 15' concrete panel from curb to the centerline.","2010-11-22 13:34:02","ACTIVE","2231000" "10EXC-0004","FRANKLIN ST","GROVE ST","","Excavation","Pacific Gas & Electric","Franklin St.(Ivy to Fulton Sts.)","2010-01-07 13:49:56","ACTIVE","24461000" "10EXC-0004","GROVE ST","FRANKLIN ST","","Excavation","Pacific Gas & Electric","Franklin St.(Ivy to Fulton Sts.)","2010-01-07 13:49:56","ACTIVE","24461000" "10EXC-0048","CALIFORNIA ST","KEARNY ST","","Excavation","Pacific Gas & Electric","Intersection of Kearny & California","2010-01-12 15:15:52","ACTIVE","24748000" "10EXC-0048","KEARNY ST","CALIFORNIA ST","","Excavation","Pacific Gas & Electric","Intersection of Kearny & California","2010-01-12 15:15:52","ACTIVE","24748000" "10EXC-0641","BELDEN ST","BUSH ST","","Excavation","SBC - Pacific Bell Engineering","FTTCS 7616405 R101 4R","2010-03-11 11:29:22","ACTIVE","24722000" "10EXC-0641","BUSH ST","BELDEN ST","","Excavation","SBC - Pacific Bell Engineering","FTTCS 7616405 R101 4R","2010-03-11 11:29:22","ACTIVE","24722000" "10EXC-1188","MISSION ST","MARY ST","06TH ST","Excavation","SBC - Pacific Bell Engineering","FTTCS 7599594 R103 4R","2010-03-04 09:40:11","ACTIVE","9099000" "10EXC-1326","MARKET ST","07TH ST \ CHARLES J BRENHAM PL","08TH ST \ GROVE ST \ HYDE ST","Excavation","SBC - Pacific Bell Engineering","FIBER TO CELL SITE -- Market St.","2010-03-18 12:15:08","ACTIVE","8751201" "10EXC-1482","BUSH ST","CLAUDE LN","MARK LN","Excavation","Cable Com of California Inc","429 BUSH ST","2010-03-24 10:07:41","ACTIVE","3429000" "10EXC-1543","ARGUELLO BLVD","CORNWALL ST","EUCLID AVE","Excavation","San Francisco Water Department","390 arguello waiting for confirmation number","2010-03-30 10:02:53","ACTIVE","2420000" "10EXC-1816","09TH ST","HARRISON ST","MCLEA CT","Excavation","SBC - Pacific Bell Engineering","JOB #7733610","2010-04-14 16:07:48","ACTIVE","457000" "10EXC-1816","09TH ST","MCLEA CT","","Excavation","SBC - Pacific Bell Engineering","JOB #7733610","2010-04-14 16:07:48","ACTIVE","24203000" "10EXC-1816","MCLEA CT","09TH ST","","Excavation","SBC - Pacific Bell Engineering","JOB #7733610","2010-04-14 16:07:48","ACTIVE","24203000" "10EXC-1898","18TH ST","RHODE ISLAND ST","","Excavation","San Francisco Water Department","intersection of rhode island and 18th street RENEW FOR PAVING ONLY PER JASON ROHWER, DPW","2010-04-09 15:00:00","ACTIVE","23759000" "10EXC-1898","RHODE ISLAND ST","18TH ST","","Excavation","San Francisco Water Department","intersection of rhode island and 18th street RENEW FOR PAVING ONLY PER JASON ROHWER, DPW","2010-04-09 15:00:00","ACTIVE","23759000" "10EXC-2276","FILLMORE ST","HAIGHT ST","","Excavation","San Francisco Water Department","HAIGHT AND FILLMORE (NE COR) REPAIR LEAK","2010-05-24 13:47:30","ACTIVE","25899000" "10EXC-2276","HAIGHT ST","FILLMORE ST","","Excavation","San Francisco Water Department","HAIGHT AND FILLMORE (NE COR) REPAIR LEAK","2010-05-24 13:47:30","ACTIVE","25899000" "10EXC-2306","17TH ST","ALBION ST","","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","25692000" "10EXC-2306","17TH ST","ALBION ST","DEARBORN ST","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","800000" "10EXC-2306","17TH ST","DEARBORN ST","","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","25687000" "10EXC-2306","ALBION ST","17TH ST","","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","25692000" "10EXC-2306","ALBION ST","CAMP ST","17TH ST","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","2146000" "10EXC-2306","DEARBORN ST","17TH ST","","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","25687000" "10EXC-2306","DEARBORN ST","17TH ST","BIRD ST","Excavation","ExteNet Systems, Inc.","Dearborn Street / 17th Street","2010-04-29 10:33:23","ACTIVE","4663000" "10EXC-2342","GREEN ST","SCOTT ST","","Excavation","Ranger Pipelines, Inc.","SCADA System Phase II Project (SFPUC Contract No. WD-2589) (Location: Scott St./ Green St.)","2010-04-30 16:51:49","ACTIVE","26870000" "10EXC-2342","SCOTT ST","GREEN ST","","Excavation","Ranger Pipelines, Inc.","SCADA System Phase II Project (SFPUC Contract No. WD-2589) (Location: Scott St./ Green St.)","2010-04-30 16:51:49","ACTIVE","26870000" "10EXC-2342","SCOTT ST","GREEN ST","UNION ST","Excavation","Ranger Pipelines, Inc.","SCADA System Phase II Project (SFPUC Contract No. WD-2589) (Location: Scott St./ Green St.)","2010-04-30 16:51:49","ACTIVE","11711000" "10EXC-2342","SCOTT ST","VALLEJO ST","GREEN ST","Excavation","Ranger Pipelines, Inc.","SCADA System Phase II Project (SFPUC Contract No. WD-2589) (Location: Scott St./ Green St.)","2010-04-30 16:51:49","ACTIVE","11710000" "10EXC-2372","18TH ST","CHURCH ST","SANCHEZ ST","Excavation","Pacific Gas & Electric","3850 18th St","2010-07-19 10:07:30","ACTIVE","888000" "10EXC-2497","FRANKLIN ST","GROVE ST","","Excavation","San Francisco Water Department","FRANKLIN AND GROVE INTERSECTION SUNKEN TRENCH AROUND GATEVALVE PAVING ONLY","2010-05-12 08:52:51","ACTIVE","24461000" "10EXC-2497","GROVE ST","FRANKLIN ST","","Excavation","San Francisco Water Department","FRANKLIN AND GROVE INTERSECTION SUNKEN TRENCH AROUND GATEVALVE PAVING ONLY","2010-05-12 08:52:51","ACTIVE","24461000" "10EXC-2544","ELM ST","FRANKLIN ST","","Excavation","SBC - Pacific Bell Engineering","7727170 - 881 Turk (with excavation in Franklin and Elm Sts.)","2010-05-14 12:03:14","ACTIVE","24477000" "10EXC-2544","ELM ST","FRANKLIN ST","GOUGH ST","Excavation","SBC - Pacific Bell Engineering","7727170 - 881 Turk (with excavation in Franklin and Elm Sts.)","2010-05-14 12:03:14","ACTIVE","5204000" "10EXC-2544","FRANKLIN ST","ELM ST","","Excavation","SBC - Pacific Bell Engineering","7727170 - 881 Turk (with excavation in Franklin and Elm Sts.)","2010-05-14 12:03:14","ACTIVE","24477000" "10EXC-2786","08TH AVE","LAWTON ST","MORAGA ST","Excavation","Power Engineeering Contractors, Inc.","1600 block - 8th Ave - Streetlighting Improvement","2010-06-02 16:10:29","ACTIVE","399000" "10EXC-2786","08TH AVE","MORAGA ST","","Excavation","Power Engineeering Contractors, Inc.","1600 block - 8th Ave - Streetlighting Improvement","2010-06-02 16:10:29","ACTIVE","27103000" "10EXC-2786","MORAGA ST","08TH AVE","","Excavation","Power Engineeering Contractors, Inc.","1600 block - 8th Ave - Streetlighting Improvement","2010-06-02 16:10:29","ACTIVE","27103000" "10EXC-2856","DOUGLASS ST","SEWARD ST","","Excavation","ExteNet Systems, Inc.","Noe Valley- NOE-72B (above address is a reference only","2010-06-18 16:17:37","ACTIVE","26136000" "10EXC-2856","DOUGLASS ST","SEWARD ST","20TH ST","Excavation","ExteNet Systems, Inc.","Noe Valley- NOE-72B (above address is a reference only","2010-06-18 16:17:37","ACTIVE","4947000" "10EXC-2856","SEWARD ST","DOUGLASS ST","","Excavation","ExteNet Systems, Inc.","Noe Valley- NOE-72B (above address is a reference only","2010-06-18 16:17:37","ACTIVE","26136000" "10EXC-2856","SEWARD ST","DOUGLASS ST","ACME ALY","Excavation","ExteNet Systems, Inc.","Noe Valley- NOE-72B (above address is a reference only","2010-06-18 16:17:37","ACTIVE","11777000" "10EXC-3129","03RD ST","TABER PL","SOUTH PARK","Excavation","SBC - Pacific Bell Engineering","7832386 3rd Street","2010-07-08 10:32:38","ACTIVE","176000" "10EXC-3137","07TH ST","HOWARD ST","FOLSOM ST","Excavation","SBC - Pacific Bell Engineering","TELEPHONE SERVICE FOR 227 7TH ST","","ACTIVE","371000" "10EXC-3143","CESAR CHAVEZ ST","MISSOURI ST","","Excavation","Cable Com of California Inc","1250 MISSOURI ST","2010-07-13 11:29:59","ACTIVE","23626000" "10EXC-3143","CESAR CHAVEZ ST","MISSOURI ST","CONNECTICUT ST","Excavation","Cable Com of California Inc","1250 MISSOURI ST","2010-07-13 11:29:59","ACTIVE","2475000" "10EXC-3143","MISSOURI ST","25TH ST","YELLOW CAB ACCESS ROAD","Excavation","Cable Com of California Inc","1250 MISSOURI ST","2010-07-13 11:29:59","ACTIVE","9217000" "10EXC-3143","MISSOURI ST","CESAR CHAVEZ ST","","Excavation","Cable Com of California Inc","1250 MISSOURI ST","2010-07-13 11:29:59","ACTIVE","23626000" "10EXC-3143","MISSOURI ST","YELLOW CAB ACCESS ROAD","CESAR CHAVEZ ST","Excavation","Cable Com of California Inc","1250 MISSOURI ST","2010-07-13 11:29:59","ACTIVE","9218000" "10EXC-3242","MISSION ST","16TH ST","17TH ST","Excavation","Cable Com of California Inc","2042 MISSION ST","2010-07-13 14:06:46","ACTIVE","9116000" "10EXC-3244","03RD ST","20TH ST","22ND ST","Excavation","SBC - Pacific Bell Engineering","FTTCS 7569063 R403 4M","2010-07-12 11:26:56","ACTIVE","190201" "10EXC-3244","03RD ST","22ND ST","","Excavation","SBC - Pacific Bell Engineering","FTTCS 7569063 R403 4M","2010-07-12 11:26:56","ACTIVE","23555000" "10EXC-3244","22ND ST","03RD ST","","Excavation","SBC - Pacific Bell Engineering","FTTCS 7569063 R403 4M","2010-07-12 11:26:56","ACTIVE","23555000" "10EXC-3244","22ND ST","03RD ST","TENNESSEE ST","Excavation","SBC - Pacific Bell Engineering","FTTCS 7569063 R403 4M","2010-07-12 11:26:56","ACTIVE","1159000" "10EXC-3245","BRYANT ST","02ND ST","JACK LONDON ALY","Excavation","Cable Com of California Inc","490 2ND ST","2010-07-13 14:58:24","ACTIVE","3280000" "10EXC-3267","KEARNY ST","SUTTER ST","","Excavation","Pacific Gas & Electric","2010 Network Transformer Replacement Project","2010-07-08 10:12:05","ACTIVE","24720000" "10EXC-3267","SUTTER ST","KEARNY ST","","Excavation","Pacific Gas & Electric","2010 Network Transformer Replacement Project","2010-07-08 10:12:05","ACTIVE","24720000" "10EXC-3330","09TH AVE","JUDAH ST","KIRKHAM ST","Excavation","Pacific Gas & Electric","1400 Block of 9TH AVENUE","2010-07-20 10:40:13","ACTIVE","433000" "10EXC-3810","25TH ST","BARTLETT ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24087000" "10EXC-3810","25TH ST","CAPP ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24068000" "10EXC-3810","25TH ST","CAPP ST","LILAC ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1439000" "10EXC-3810","25TH ST","LILAC ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24071000" "10EXC-3810","25TH ST","LILAC ST","MISSION ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1440000" "10EXC-3810","25TH ST","MISSION ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24073000" "10EXC-3810","26TH ST","BARTLETT ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21342000" "10EXC-3810","26TH ST","BARTLETT ST","ORANGE ALY","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1528000" "10EXC-3810","26TH ST","CAPP ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21305000" "10EXC-3810","26TH ST","CAPP ST","LILAC ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1524000" "10EXC-3810","26TH ST","CYPRESS ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24067000" "10EXC-3810","26TH ST","CYPRESS ST","CAPP ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1523000" "10EXC-3810","26TH ST","FOLSOM ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21178000" "10EXC-3810","26TH ST","LILAC ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24072000" "10EXC-3810","26TH ST","LILAC ST","MISSION ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1525000" "10EXC-3810","26TH ST","MISSION ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21306000" "10EXC-3810","26TH ST","MISSION ST","OSAGE ALY","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1526000" "10EXC-3810","26TH ST","ORANGE ALY","VALENCIA ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1529000" "10EXC-3810","26TH ST","OSAGE ALY","BARTLETT ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1527000" "10EXC-3810","26TH ST","SHOTWELL ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21293000" "10EXC-3810","26TH ST","SOUTH VAN NESS AVE","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21296000" "10EXC-3810","26TH ST","SOUTH VAN NESS AVE","CYPRESS ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","1522000" "10EXC-3810","26TH ST","VALENCIA ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21346000" "10EXC-3810","BARTLETT ST","25TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24087000" "10EXC-3810","BARTLETT ST","25TH ST","26TH ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2746000" "10EXC-3810","BARTLETT ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21342000" "10EXC-3810","BARTLETT ST","26TH ST","CESAR CHAVEZ ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2747000" "10EXC-3810","CAPP ST","25TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24068000" "10EXC-3810","CAPP ST","25TH ST","26TH ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","3682000" "10EXC-3810","CAPP ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21305000" "10EXC-3810","CAPP ST","26TH ST","CESAR CHAVEZ ST \ MISSION ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","3683000" "10EXC-3810","CAPP ST","CESAR CHAVEZ ST \ MISSION ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21304000" "10EXC-3810","CESAR CHAVEZ ST","BARTLETT ST","VALENCIA ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2489202" "10EXC-3810","CESAR CHAVEZ ST","CAPP ST \ MISSION ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21304000" "10EXC-3810","CESAR CHAVEZ ST","CAPP ST \ MISSION ST","VALENCIA ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2489101" "10EXC-3810","CESAR CHAVEZ ST","FOLSOM ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21177000" "10EXC-3810","CESAR CHAVEZ ST","SHOTWELL ST","SOUTH VAN NESS AVE","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2487201" "10EXC-3810","CESAR CHAVEZ ST","SOUTH VAN NESS AVE","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","33364000" "10EXC-3810","CESAR CHAVEZ ST","SOUTH VAN NESS AVE","CAPP ST \ MISSION ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2488101" "10EXC-3810","CESAR CHAVEZ ST","SOUTH VAN NESS AVE","CAPP ST \ MISSION ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","2488201" "10EXC-3810","CESAR CHAVEZ ST","VALENCIA ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21345000" "10EXC-3810","CYPRESS ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24067000" "10EXC-3810","FOLSOM ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21178000" "10EXC-3810","FOLSOM ST","CESAR CHAVEZ ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21177000" "10EXC-3810","LILAC ST","25TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24071000" "10EXC-3810","LILAC ST","25TH ST","26TH ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","8332000" "10EXC-3810","LILAC ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24072000" "10EXC-3810","MISSION ST","25TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","24073000" "10EXC-3810","MISSION ST","25TH ST","26TH ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","9127000" "10EXC-3810","MISSION ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21306000" "10EXC-3810","MISSION ST","26TH ST","CAPP ST \ CESAR CHAVEZ ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","9128000" "10EXC-3810","MISSION ST","CAPP ST \ CESAR CHAVEZ ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21304000" "10EXC-3810","SHOTWELL ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21293000" "10EXC-3810","SHOTWELL ST","26TH ST","CESAR CHAVEZ ST","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","11844000" "10EXC-3810","SOUTH VAN NESS AVE","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21296000" "10EXC-3810","SOUTH VAN NESS AVE","CESAR CHAVEZ ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","33364000" "10EXC-3810","VALENCIA ST","26TH ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21346000" "10EXC-3810","VALENCIA ST","CESAR CHAVEZ ST","","Excavation","Pacific Gas & Electric","Mission District 2 GPRP Project","2010-08-04 16:47:40","ACTIVE","21345000" "10EXC-3880","MONTGOMERY ST","POST ST","SUTTER ST","Excavation","Shimmick Construction Co., Inc.","Muni Traction Power Feeder Circuit Upgrade project (Contract No. 1215)","2010-08-24 15:21:33","ACTIVE","9297000" "10EXC-4047","SACRAMENTO ST","DRUMM ST","DAVIS ST","Excavation","SBC - Pacific Bell Engineering","7923349 sacramento st btwn davis and drumm","2010-08-26 16:03:28","ACTIVE","11220000" "10EXC-4801","BAY ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26754000" "10EXC-4801","BAY ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","2789000" "10EXC-4801","BAY ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","2788000" "10EXC-4801","BROADWAY","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26578000" "10EXC-4801","CHESTNUT ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26740000" "10EXC-4801","CHESTNUT ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","3974000" "10EXC-4801","CHESTNUT ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","3973000" "10EXC-4801","FRANCISCO ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26755000" "10EXC-4801","FRANCISCO ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","5774000" "10EXC-4801","GREEN ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26580000" "10EXC-4801","GREEN ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","6472000" "10EXC-4801","GREEN ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","6471000" "10EXC-4801","GREENWICH ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26731000" "10EXC-4801","GREENWICH ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","6516000" "10EXC-4801","GREENWICH ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","6515000" "10EXC-4801","JACKSON ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26565000" "10EXC-4801","JACKSON ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7401000" "10EXC-4801","LAGUNA ST","BAY ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26754000" "10EXC-4801","LAGUNA ST","BROADWAY","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26578000" "10EXC-4801","LAGUNA ST","BROADWAY","VALLEJO ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7975000" "10EXC-4801","LAGUNA ST","CALIFORNIA ST","SACRAMENTO ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7969000" "10EXC-4801","LAGUNA ST","CHESTNUT ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26740000" "10EXC-4801","LAGUNA ST","CHESTNUT ST","FRANCISCO ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7984000" "10EXC-4801","LAGUNA ST","CLAY ST","WASHINGTON ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7971000" "10EXC-4801","LAGUNA ST","FRANCISCO ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26755000" "10EXC-4801","LAGUNA ST","FRANCISCO ST","BAY ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7985000" "10EXC-4801","LAGUNA ST","GREEN ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26580000" "10EXC-4801","LAGUNA ST","GREEN ST","UNION ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7977000" "10EXC-4801","LAGUNA ST","GREENWICH ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26731000" "10EXC-4801","LAGUNA ST","GREENWICH ST","LOMBARD ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7981000" "10EXC-4801","LAGUNA ST","HARRIS PL","GREENWICH ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7980000" "10EXC-4801","LAGUNA ST","JACKSON ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26565000" "10EXC-4801","LAGUNA ST","LOMBARD ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26722000" "10EXC-4801","LAGUNA ST","LOMBARD ST","MAGNOLIA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7982000" "10EXC-4801","LAGUNA ST","MAGNOLIA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26739000" "10EXC-4801","LAGUNA ST","MAGNOLIA ST","CHESTNUT ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7983000" "10EXC-4801","LAGUNA ST","SACRAMENTO ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26556000" "10EXC-4801","LAGUNA ST","SACRAMENTO ST","CLAY ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7970000" "10EXC-4801","LAGUNA ST","UNION ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26583000" "10EXC-4801","LAGUNA ST","VALLEJO ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26574000" "10EXC-4801","LAGUNA ST","VALLEJO ST","GREEN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7976000" "10EXC-4801","LAGUNA ST","WASHINGTON ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26558000" "10EXC-4801","LAGUNA ST","WASHINGTON ST","JACKSON ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","7972000" "10EXC-4801","LOMBARD ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26722000" "10EXC-4801","LOMBARD ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","8457201" "10EXC-4801","LOMBARD ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","8456201" "10EXC-4801","MAGNOLIA ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26739000" "10EXC-4801","MAGNOLIA ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","8623000" "10EXC-4801","SACRAMENTO ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26556000" "10EXC-4801","UNION ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26583000" "10EXC-4801","VALLEJO ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26574000" "10EXC-4801","VALLEJO ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","13113000" "10EXC-4801","VALLEJO ST","OCTAVIA ST","LAGUNA ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","13112000" "10EXC-4801","WASHINGTON ST","LAGUNA ST","","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","26558000" "10EXC-4801","WASHINGTON ST","LAGUNA ST","BUCHANAN ST","Excavation","Shaw Pipeline Inc.","8-inch Ductile Iron Water Main Installation in Laguna Street (Contract No. WD-2561)","2010-09-27 08:47:51","ACTIVE","13437000" "10EXC-4850","08TH AVE","LINARES AVE","PACHECO ST","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","403000" "10EXC-4850","08TH AVE","MORAGA ST","NORIEGA ST","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","400000" "10EXC-4850","08TH AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","401000" "10EXC-4850","08TH AVE","ORTEGA ST","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27092000" "10EXC-4850","08TH AVE","ORTEGA ST","LINARES AVE","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","402000" "10EXC-4850","09TH AVE","PACHECO ST","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27089000" "10EXC-4850","11TH AVE","PACHECO ST","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27099000" "10EXC-4850","LINARES AVE","VENTURA AVE","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27044000" "10EXC-4850","ORTEGA ST","08TH AVE","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27092000" "10EXC-4850","PACHECO ST","09TH AVE","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27089000" "10EXC-4850","PACHECO ST","11TH AVE","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27099000" "10EXC-4850","VENTURA AVE","LINARES AVE","","Excavation","Pacific Gas & Electric","NORIEGA GPRP Project","2010-09-30 13:39:14","ACTIVE","27044000" "10EXC-4868","FRANKLIN ST","HAYES ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","24451000" "10EXC-4868","GOUGH ST","HAYES ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","25918000" "10EXC-4868","HAYES ST","FRANKLIN ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","24451000" "10EXC-4868","HAYES ST","FRANKLIN ST","GOUGH ST","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","6815000" "10EXC-4868","HAYES ST","GOUGH ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","25918000" "10EXC-4868","HAYES ST","GOUGH ST","OCTAVIA ST","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","6816000" "10EXC-4868","HAYES ST","OCTAVIA ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","25925000" "10EXC-4868","HAYES ST","OCTAVIA ST","LAGUNA ST","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","6817000" "10EXC-4868","HAYES ST","POLK ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","24436000" "10EXC-4868","HAYES ST","POLK ST","VAN NESS AVE","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","6813000" "10EXC-4868","HAYES ST","VAN NESS AVE","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","24450000" "10EXC-4868","HAYES ST","VAN NESS AVE","FRANKLIN ST","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","6814000" "10EXC-4868","LARKIN ST","09TH ST \ MARKET ST","HAYES ST","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","8119000" "10EXC-4868","OCTAVIA ST","HAYES ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","25925000" "10EXC-4868","POLK ST","10TH ST \ FELL ST \ MARKET ST","HAYES ST","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","10546000" "10EXC-4868","POLK ST","HAYES ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","24436000" "10EXC-4868","VAN NESS AVE","HAYES ST","","Excavation","Rosendin Electric, Inc.","21 Hayes Pole Replacement and Miscellaneous Overhead Construction (MTA Contract No. 1234)","2010-09-30 10:01:12","ACTIVE","24450000" "10EXC-4959","HYDE ST","POST ST","","Excavation","Pacific Gas & Electric","908 Post Street","2011-06-09 10:18:19","ACTIVE","25156000" "10EXC-4959","POST ST","HYDE ST","","Excavation","Pacific Gas & Electric","908 Post Street","2011-06-09 10:18:19","ACTIVE","25156000" "10EXC-4959","POST ST","HYDE ST","MEACHAM PL","Excavation","Pacific Gas & Electric","908 Post Street","2011-06-09 10:18:19","ACTIVE","10637000" "10EXC-5290","23RD AVE","CLEMENT ST","GEARY BLVD","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1213000" "10EXC-5290","26TH AVE","LAKE ST","CALIFORNIA ST","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1470000" "10EXC-5290","29TH AVE","CLEMENT ST","GEARY BLVD","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1609000" "10EXC-5290","31ST AVE","CLEMENT ST","GEARY BLVD","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1680000" "10EXC-5290","32ND AVE","GEARY BLVD","ANZA ST","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1703000" "10EXC-5290","37TH AVE","BALBOA ST","CABRILLO ST","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1823000" "10EXC-5290","38TH AVE","CABRILLO ST","FULTON ST","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1850000" "10EXC-5290","41ST AVE","BALBOA ST","CABRILLO ST","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","1907000" "10EXC-5290","ANZA ST","35TH AVE","36TH AVE","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","2351000" "10EXC-5290","CABRILLO ST","39TH AVE","40TH AVE","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","3506000" "10EXC-5290","CABRILLO ST","41ST AVE","42ND AVE","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","3508000" "10EXC-5290","EL CAMINO DEL MAR","27TH AVE","28TH AVE","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","5123000" "10EXC-5290","EL CAMINO DEL MAR","LINCOLN BLVD","25TH AVE","Excavation","NextG Network, Inc","","2010-10-27 11:35:53","ACTIVE","5120000" "10EXC-5576","OFARRELL ST","ADA CT","HYDE ST","Excavation","Pacific Gas & Electric","500 HYDE ST.","2010-11-19 12:50:01","ACTIVE","9732000" "10EXC-5616","WASHINGTON ST","HYDE ST","LARKIN ST","Excavation","SBC - Pacific Bell Engineering","Pothole in one area to clear blocked conduit","","ACTIVE","13430000" "10EXC-6284","KEARNY ST","NOTTINGHAM PL","BROADWAY","Excavation","Pacific Gas & Electric","Kearny St -2011 CABLE REPLACEMENT PROJECT. Z-1123","2011-03-18 09:41:20","ACTIVE","7764000" "10IE-0003","22ND ST","TENNESSEE ST","MINNESOTA ST","StrtImprov","Sagan Piechota Architecture","reconstruct concrete curb/ sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Restore abandoned curb cut to standard city curb.","2011-03-08 12:00:26","ACTIVE","1160000" "10IE-0007","LEAVENWORTH ST","CHESTNUT ST","FRANCISCO ST","StrtImprov","John Chiapellone","Reconstruct & repair sidewalk/curb to match existing & add 12 inches to (E) 12 ft wide (12'x3') driveway curb cut to meet city standard.","2010-05-07 08:12:49","ACTIVE","8270101" "10IE-0011","ANZA ST","25TH AVE","26TH AVE","StrtImprov","Tommy Lee Consulting","Reconstruct concrete curb and sidewalk with min 2' saw-cut/ AC paving conform per City Standards. All work directed by DPW inspector.","2011-02-22 09:58:20","ACTIVE","2343000" "10IE-0025","SAN BRUNO AVE","18TH ST","19TH ST","StrtImprov","Jerry Lombardi Construction, Inc.","","2010-01-26 13:43:56","ACTIVE","11356000" "10IE-0028","JACKSON ST","LYON ST","PRESIDIO AVE","StrtImprov","Butler Armsden Architects","Reconstruct sidewalk & curb/gutter with 2' pavement/SW conform PER city standards on Presidio Avenue/Jackson Street.","2011-09-21 14:50:17","ACTIVE","7411000" "10IE-0028","PRESIDIO AVE","JACKSON ST","WASHINGTON ST","StrtImprov","Butler Armsden Architects","Reconstruct sidewalk & curb/gutter with 2' pavement/SW conform PER city standards on Presidio Avenue/Jackson Street.","2011-09-21 14:50:17","ACTIVE","10762000" "10IE-0031","BELVEDERE ST","GRATTAN ST","ALMA ST","StrtImprov","CRICHLOW BROOKS E & PORTER BET","Reconstruct & repair damaged sidewalk & portion of curb per NTR#930806 as directed by city inspector.No warping allowed in sidewalk;if finding need warping in sidewalk, applicant need to apply for a MSE permit.","2010-01-29 10:48:07","ACTIVE","2911000" "10IE-0046","WEBSTER ST","BAY ST","NORTH POINT ST","StrtImprov","Annuzzi's Concrete","NTR 934428 - 99 sq ft sidewalk repair, 3 LF curb repair.","2010-02-08 10:04:34","ACTIVE","13562000" "10IE-0047","38TH AVE","JUDAH ST","KIRKHAM ST","StrtImprov","E.F. Gomez Cement Contractor","Repair curb, curb cut and sidewalk per City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector.","2010-02-09 11:46:16","ACTIVE","1853000" "10IE-0048","22ND AVE","CLEMENT ST","GEARY BLVD","StrtImprov","E.F. Gomez Cement Contractor","Repair 12 LF of curb and 117 SF sidewalk to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector.","2010-02-08 11:51:35","ACTIVE","1134000" "10IE-0051","MINERVA ST","CAPITOL AVE","ORIZABA AVE","StrtImprov","Dickson Consulting Group","","2011-09-30 11:46:18","ACTIVE","9037000" "10IE-0077","18TH ST","DIAMOND ST","EUREKA ST","StrtImprov","D. Lopez Jr Concrete Construction","NTR #935030. Replace damaged sidewalk on both 18th St & Diamond St. Reconstruct abandoned driveway on Diamond. All work directed by DPW inspector. Street space included.","2010-02-19 16:33:16","ACTIVE","894000" "10IE-0078","ALERT ALY","DOLORES ST","","StrtImprov","Pacific Surfacing, Inc.","NTR 934923 - Repave damaged Alert Alley (unaccepted street) at Dolores St. Also repave 50 sq ft of sidewalk.","2010-02-22 12:20:57","ACTIVE","25839000" "10IE-0078","DOLORES ST","ALERT ALY","","StrtImprov","Pacific Surfacing, Inc.","NTR 934923 - Repave damaged Alert Alley (unaccepted street) at Dolores St. Also repave 50 sq ft of sidewalk.","2010-02-22 12:20:57","ACTIVE","25839000" "10IE-0088","15TH AVE","TARAVAL ST","ULLOA ST","StrtImprov","S & H Concrete Construction","NTR 933447 - Repair 40 sq ft sidewalk and 6 LF curb as directed by inspector.","2010-03-01 09:11:25","ACTIVE","628000" "10IE-0089","15TH AVE","TARAVAL ST","ULLOA ST","StrtImprov","S & H Concrete Construction","NTR #933446. Replace damaged sidewalk and curb including driveway per City Standards. All work directed by DPW inspector. Street space included.","2010-03-01 09:09:51","ACTIVE","628000" "10IE-0098","HAZELWOOD AVE","GLOBE ALY \ LOS PALMOS DR","CASITAS AVE \ YERBA BUENA AVE","StrtImprov","Gonzalez Concrete","Per NTR: 937377 replace damaged sidewalk and driveway with curb cut. All work is to be done to city standards as directed by DPW inspector.","2010-03-05 10:12:51","ACTIVE","6845000" "10IE-0100","VALDEZ AVE","MANGELS AVE","BRENTWOOD AVE","StrtImprov","E.F. Gomez Cement Contractor","NTR #937803. Replace damaged sidewalk and driveway to City Standards. All work directed by DPW inspector. 40LF of Street Space included.","2010-03-05 14:22:40","ACTIVE","13050000" "10IE-0109","LISBON ST","ITALY AVE","AMAZON AVE","StrtImprov","F. FERRANDO & CO.","Reconstruct driveway and sidewalk per NTR # 934737","2010-03-10 13:54:08","ACTIVE","8412000" "10IE-0112","SILVER AVE","AMHERST ST","PRINCETON ST","StrtImprov","E.F. Gomez Cement Contractor","NTR 935009 - repair (25 LF) Curb & (200 sq ft) Sidewalk.","2010-03-10 15:01:01","ACTIVE","11908000" "10IE-0116","VALDEZ AVE","MANGELS AVE","BRENTWOOD AVE","StrtImprov","E.F. Gomez Cement Contractor","NTR #937805 To replace damaged sidewalk and driveway per city standards. Remove weeds from sidewalk. 40 LF of street space included.","2010-03-12 16:44:02","ACTIVE","13050000" "10IE-0120","BRENTWOOD AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","MAYWOOD DR","StrtImprov","Gonzalez Concrete","Voluntary upgrade. Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by BSM inspector. 40LF of Street Space is included.","2010-03-15 12:14:35","ACTIVE","3112000" "10IE-0122","20TH AVE","SANTIAGO ST","TARAVAL ST","StrtImprov","D. Lopez Jr Concrete Construction","NTR 937487 - repair 550 sq ft sidewalk & 10 LF curb.","2010-03-18 10:19:52","ACTIVE","1016000" "10IE-0123","20TH AVE","SANTIAGO ST","TARAVAL ST","StrtImprov","D. Lopez Jr Concrete Construction","NTR 937499 - repair 175 sq ft sidewalk & 11 LF curb.","2010-03-18 10:17:05","ACTIVE","1016000" "10IE-0124","ARLINGTON ST","SAINT MARYS AVE","ROANOKE ST","StrtImprov","Service Concrete Company","Remove and replace sidewalk pavement including driveway curb cut per City Std. (Warped access to garage to be removed.)","2010-03-16 15:21:27","ACTIVE","2453000" "10IE-0125","SUNNYDALE AVE","SANTOS ST","END","StrtImprov","CDX Builders, Inc.","Prop A - ADA Disability Access Improvement. [Phase 1]: 1 Curb Ramp in loading zone, 1 20-ft wide Driveway Curb Cut, & 3 New Level Landings. Ref. 10MSE-0153","2010-05-04 14:43:26","ACTIVE","12268000" "10IE-0127","VALDEZ AVE","MANGELS AVE","BRENTWOOD AVE","StrtImprov","E.F. Gomez Cement Contractor","reconstruct & repair sidewalk & curb per NTR#937807 as directed by city inspector.","2010-03-18 15:54:49","ACTIVE","13050000" "10IE-0129","SILVER AVE","MADRID ST","EDINBURG ST","StrtImprov","ASSOCIATED BUILDERS","Reconstruct sidewalk & Driveway and curb to city standards per NTR# 938208","2010-03-19 13:29:47","ACTIVE","11897000" "10IE-0131","BRENTWOOD AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","MAYWOOD DR","StrtImprov","Gonzalez Concrete","NTR #938041. Replace damaged sidewalk and driveway.","2010-03-22 13:06:58","ACTIVE","3112000" "10IE-0134","DIAMOND ST","18TH ST","19TH ST","StrtImprov","Guidry Concrete","Reconstruct & repair damaged sidewalk & portion of curb per NTR#932706 as directed by city inspector.","2010-03-23 13:39:15","ACTIVE","4738000" "10IE-0140","TURK ST","HYDE ST","DODGE ST","StrtImprov","Esquivel Grading & Paving, Inc.","Restore sidewalk and street in conjunction with excavations per permits 11E-0271 & 11E-0284.","2012-01-20 10:24:51","ACTIVE","12720000" "10IE-0157","PINE ST","LEAVENWORTH ST","HYDE ST","StrtImprov","KCA Engineers, Inc.","","2010-06-07 08:11:32","ACTIVE","10474000" "10IE-0158","ALAMEDA ST","POTRERO AVE","HAMPSHIRE ST","StrtImprov","Annuzzi's Concrete","NTR #937745. Replace damaged sidewalk on both Potrero Ave & Alameda St frontages; damaged driveway, and reconstruct overwide driveway to city standard on Alameda. 40 LF of street space included.","2010-03-31 09:45:34","ACTIVE","2137000" "10IE-0158","POTRERO AVE","10TH ST \ BRANNAN ST \ DIVISION ST","ALAMEDA ST","StrtImprov","Annuzzi's Concrete","NTR #937745. Replace damaged sidewalk on both Potrero Ave & Alameda St frontages; damaged driveway, and reconstruct overwide driveway to city standard on Alameda. 40 LF of street space included.","2010-03-31 09:45:34","ACTIVE","10658000" "10IE-0163","JONES ST","LOMBARD ST","CHESTNUT ST","StrtImprov","5.12 CONSTRUCTION, Inc","Construct new driveway cut and reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2010-08-04 14:07:07","ACTIVE","7595000" "10IE-0166","BRENTWOOD AVE","YERBA BUENA AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","StrtImprov","E.F. Gomez Cement Contractor","NTR #937486. Replace damaged sidewalk including the driveway. 40 LF of Street Space included.","2010-04-02 11:06:25","ACTIVE","3111000" "10IE-0167","INNES AVE","END","MENDELL ST","StrtImprov","E.F. Gomez Cement Contractor","Reconstruct sidewalk & curb with 2' pavement/SW conform per city standards. construct & install 10'x3'driveway cut to meet city standards.","2010-04-02 13:39:30","ACTIVE","7259101" "10IE-0178","SANCHEZ ST","30TH ST","RANDALL ST","StrtImprov","James Heron Architect","Reconstruct concrete curb and sidewalk with 2' AC conform per city standards. All work directed by DPW inspector. One (1) new (N) curb 10' x 3' curb cut to city standards.","2011-03-16 11:51:24","ACTIVE","11541000" "10IE-0187","27TH AVE","LAKE ST","CALIFORNIA ST","StrtImprov","KLW Construction, Inc.","Remove and replace sidewalk and curb per NTR#939270.","2010-04-13 11:50:28","ACTIVE","1544000" "10IE-0187","CALIFORNIA ST","27TH AVE","28TH AVE","StrtImprov","KLW Construction, Inc.","Remove and replace sidewalk and curb per NTR#939270.","2010-04-13 11:50:28","ACTIVE","3604000" "10IE-0188","17TH AVE","GEARY BLVD","ANZA ST","StrtImprov","Guidry Concrete","NTR #938788. Replace sidewalk flags and curb marked with white dots. Possible root service required for one (1) tree. Possible replacement of utility box necessary during sidewalk repairs. 25 LF of street space included.","2010-04-14 10:00:31","ACTIVE","753000" "10IE-0189","MONTEREY BLVD","RIDGEWOOD AVE","MONTECITO AVE","StrtImprov","E.F. Gomez Cement Contractor","Reconstruct damaged sidewalk/curb & restore 10'x3' driveway cut to meet city standards as directed by city inspector.","2010-04-15 08:25:35","ACTIVE","9280101" "10IE-0195","PACIFIC AVE","BUCHANAN ST","WEBSTER ST","StrtImprov","SF Garage Co.","Reconstruct the sidewalk and curb to city standards with a constant 2% cross slope, 5" curb, new 10' x 3' driveway curb cut & 2' A/C conform. All work directed by DPW inspector.","2011-07-07 09:27:48","ACTIVE","10153000" "10IE-0204","17TH AVE","LAWTON ST","MORAGA ST","StrtImprov","E.F. Gomez Cement Contractor","Reconstruct & repair damaged sidewalk & curb with 2' pavement/SW conform per city standards. Restore 10'x3' driveway cut to meet city standards.","2010-04-20 12:13:39","ACTIVE","761000" "10IE-0207","DELMAR ST","WALLER ST","FREDERICK ST","StrtImprov","Sal Deguarda Concrete","Reconstruct & repair sidewalk & curb per NTR#937135 as directed by city inspector.","2010-04-22 11:46:43","ACTIVE","4695000" "10IE-0208","15TH AVE","CLEMENT ST","TACOMA ST","StrtImprov","Sal Deguarda Concrete","Reconstruct & repair sidewalk & curb per NTR#939493 as directed by city inspector.","2010-04-22 12:06:34","ACTIVE","607000" "10IE-0209","COUNTRY CLUB DR","LAKESHORE DR","END","StrtImprov","E.F. Gomez Cement Contractor","Voluntary upgrade. Repair damaged curb and driveway. All work directed by DPW inspector. 25' street space included.","2010-04-23 11:52:23","ACTIVE","4465000" "10IE-0211","CRESTA VISTA DR","BAXTER ALY \ CASITAS AVE","GLOBE ALY","StrtImprov","AC Contracting","Reconstruct & repair sidewalk & curb as directed by city inspector. Reconstruct driveway cut to meet city standards.","2010-04-26 11:47:07","ACTIVE","4508000" "10IE-0218","LONDON ST","RUSSIA AVE","FRANCE AVE","StrtImprov","AREA DEVELOPMENT, INC.","Remove and replace curb and sidewalk per NTR#935768.","2010-04-27 12:18:29","ACTIVE","8474000" "10IE-0220","LOMBARD ST","TUSCANY ALY","POWELL ST","StrtImprov","E.F. Gomez Cement Contractor","Voluntary Repair Sidewalk and Driveway Curb Cut per City Standard (~ 100 sq ft)","2010-04-27 16:14:50","ACTIVE","8440000" "10IE-0221","GEARY BLVD","PARKER AVE","BEAUMONT AVE","StrtImprov","ASSOCIATED BUILDERS","NTR #938829. Replace damaged sidewalk marked in white. Repair driveway wing to City Standards. Trim overgrown vegetation away from sidewalk. 40 LF of street space included.","2010-04-28 10:01:02","ACTIVE","6052201" "10IE-0222","MELBA AVE","OCEAN AVE","EUCALYPTUS DR","StrtImprov","Lewis M. Merlo, Inc.","Reconstruct & repair sidewalk & portion of curb per ntr#941095 as directed by inspector.","2010-04-28 10:14:06","ACTIVE","8944000" "10IE-0224","44TH AVE","ANZA ST","BALBOA ST","StrtImprov","Annuzzi's Concrete","Replace sidewalk for NTR # 940356 per City standards as directed by inspector","2010-04-28 13:12:48","ACTIVE","1973000" "10IE-0242","35TH AVE","BALBOA ST","CABRILLO ST","StrtImprov","Sal Deguarda Concrete","Repair curb & sidewalk per NTR#940353.","2010-05-04 16:09:55","ACTIVE","1767000" "10IE-0246","BEVERLY ST","SHIELDS ST","GARFIELD ST","StrtImprov","Martin Scott","Repair (13 LF) curb, curb cut and (78 SF) sidewalk per NTR # 941098 to City Standards. Provide 2-foot pavement conform. All work is directed by the BSM inspector.","2010-05-06 11:54:26","ACTIVE","2968000" "10IE-0258","GRANVILLE WAY","PUBLIC PARK","CLAREMONT BLVD","StrtImprov","S & H Concrete Construction","NTR #940899. Replace damaged sidewalk and driveway curb. Trim overgrown vegetations. All work directed by DPW inspector. Street space included.","2010-05-13 09:51:49","ACTIVE","6422000" "10IE-0264","GAMBIER ST","SILLIMAN ST","FELTON ST","StrtImprov","Service Concrete Company","Per NTR 934304 replace curb and sidewalk as necessary.","2010-05-14 10:33:50","ACTIVE","5991000" "10IE-0295","MIGUEL ST","BEACON ST","FAIRMOUNT ST","StrtImprov","Michael Heavey Construction","NTR #940658. Replace non-standard sidewalk and curb. All work directed by DPW inspector. Street space included.","2010-06-07 11:31:25","ACTIVE","9021000" "10IE-0296","MIRALOMA DR","BENGAL ALY","RAVENWOOD DR \ YERBA BUENA AVE","StrtImprov","Frei Design","Construct a new 10'-0" curb cut and reconstruct sidewalk and curb/gutter with 2' pavement conform per approved plan, per city standards and as directed by city inspector. (This work is in conjunction with 10MSE-0193 & 11SW-0001.)","2011-09-27 15:50:34","ACTIVE","9069000" "10IE-0297","ULLOA ST","37TH AVE","38TH AVE","StrtImprov","D. Lopez Jr Concrete Construction","Voluntary Repair. Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space included.","2010-06-07 14:14:39","ACTIVE","12815000" "10IE-0298","ULLOA ST","37TH AVE","38TH AVE","StrtImprov","D. Lopez Jr Concrete Construction","Voluntary Repair. Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space included.","2010-06-07 14:16:05","ACTIVE","12815000" "10IE-0311","SURREY ST","OHLONE WAY","VAN BUREN ST","StrtImprov","Jason Matthew Krolicki","Reconstruct concrete curb and sidewalk with min 2' saw-cut AC / paving conform per City Standards. All work directed by DPW inspector.","2011-10-06 09:19:31","ACTIVE","12302000" "10IE-0311","VAN BUREN ST","SUSSEX ST","SURREY ST","StrtImprov","Jason Matthew Krolicki","Reconstruct concrete curb and sidewalk with min 2' saw-cut AC / paving conform per City Standards. All work directed by DPW inspector.","2011-10-06 09:19:31","ACTIVE","13137000" "10IE-0312","OFARRELL ST","ANZAVISTA AVE","ANZA ST \ MASONIC AVE","StrtImprov","MK Pipelines","Installing a City Standard manhole and a 10" side sewer lateral on O'Farrell Street (see 10S-0115) connecting to the sewer trap per approved plan.","2010-06-15 11:04:29","ACTIVE","9746000" "10IE-0317","ALPINE TER","WALLER ST","DUBOCE AVE","StrtImprov","BANA CONSTRUCTION, INC.","Reconstruct concrete curb, sidewalk and install new curb cut with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2011-06-30 14:24:03","ACTIVE","2219000" "10IE-0333","BRENTWOOD AVE","YERBA BUENA AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","StrtImprov","Sal Deguarda Concrete","Repair 220 sf + 20 sf added sidwalk and 16 LF of curb.","2010-06-25 17:13:43","ACTIVE","3111000" "10IE-0338","WESTWOOD DR","EASTWOOD DR \ MIRAMAR AVE","ELMWOOD WAY","StrtImprov","Luciano Concrete","Voluntary Repair. Reconstruct damaged curb cut and sidewalk with min 2' saw-cut/ AC paving conform per City Standards. All work directed by DPW inspector. Street space included.","2010-06-30 09:49:57","ACTIVE","13588000" "10IE-0339","NOE ST","LIBERTY ST","21ST ST","StrtImprov","Alvis Eugene Hendley","Per NTR 936942 reconstruct / repair sidewalk and curb fronting subject property. [25LF of street space]","2010-06-30 10:53:35","ACTIVE","9621000" "10IE-0342","PACIFIC AVE","JEROME ALY","KEARNY ST","StrtImprov","Terry and Terry Architects","Break granite curb towards property and create keyway in concrete base. Pour new curb and sidewalk to City Standards. All work directed by DPW inspector.","2010-10-08 13:26:31","ACTIVE","10123000" "10IE-0347","BUSH ST","DASHIELL HAMMETT ST","CHELSEA PL","StrtImprov","MDC Concrete, Inc.","Remove vent/hatch cover and repair topping slab per BPA 2010/07/06/5974. Sidewalk only and no curb work. All work on the Monroe frontage.","2010-07-06 12:17:43","ACTIVE","3435000" "10IE-0350","TOYON LN","SOUTH HILL BLVD","BALTIMORE WAY","StrtImprov","Sal Deguarda Concrete","NTR #943962. Replace damaged sidewalk and curb. Possible tree root problem. All work directed by DPW inspector. Street space included.","2010-07-07 10:48:23","ACTIVE","12668000" "10IE-0395","NAPLES ST","EXCELSIOR AVE","BRAZIL AVE","StrtImprov","Mae Threadgill","Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street Space included.","2011-01-07 09:44:28","ACTIVE","9490000" "10IE-0401","20TH ST","FOLSOM ST","SHOTWELL ST","StrtImprov","Kwan & Associates","Reconstruct sidewalk & curb with 2' pavement/SW conform to macth existing per city standards.","2011-05-26 11:40:46","ACTIVE","1052000" "10IE-0412","LEAVENWORTH ST","GOLDEN GATE AVE","TURK ST","StrtImprov","Lerner + Assoc. Architects","","2011-02-07 08:32:28","ACTIVE","8239000" "10IE-0415","JACKSON ST","HYDE ST","LARKIN ST","StrtImprov","Gonzalez Concrete","Voluntary Repair - 4 LF Curb.","2010-08-12 13:23:45","ACTIVE","7394000" "10IE-0418","FAIR OAKS ST","25TH ST","26TH ST","StrtImprov","5.12 CONSTRUCTION, Inc","Construct a new 12'-0" wide curb cut. Remove and replace sidewalk and curb/gutter with 2' pavement conform. All work shall be done per city standards and as directed by city inspector.","2011-03-11 11:30:16","ACTIVE","5385000" "10IE-0423","HAMPSHIRE ST","20TH ST","21ST ST","StrtImprov","E.F. Gomez Cement Contractor","Voluntary Street Improvement- To reconstruct 8 LF of curb and 9 SF of sidewalk. All work is to be done to city standards and Directed by DPW inspector.","2010-08-20 10:51:48","ACTIVE","6653000" "10IE-0427","NOE ST","VALLEY ST","29TH ST","StrtImprov","Sal Deguarda Concrete","NTR 944999 - repair curb and sidewalk marked by a white dot.","2010-08-20 17:12:12","ACTIVE","9637000" "10IE-0427","VALLEY ST","SANCHEZ ST","NOE ST","StrtImprov","Sal Deguarda Concrete","NTR 944999 - repair curb and sidewalk marked by a white dot.","2010-08-20 17:12:12","ACTIVE","13128000" "10IE-0429","MAYNARD ST","CASTLE MANOR AVE \ MISSION ST","CRAUT ST","StrtImprov","Sal Deguarda Concrete","NTR 945604 - repair 12 LF curb & 90 sq ft sidewalk.","2010-08-30 12:05:04","ACTIVE","8880000" "10IE-0432","FLOOD AVE","FOERSTER ST","GENNESSEE ST","StrtImprov","Guidry Concrete","Reconstruct damaged sidewalk & restore driveway cut as specified in NTR 945109 to meet city standards.","2010-08-27 14:57:52","ACTIVE","5609000" "10IE-0456","FULTON ST","14TH AVE","15TH AVE","StrtImprov","Sunset Concrete","Repair curb, curb cut and sidewalk per NTR # 942799 to City Standards. Provide 2-foot pavement conform.","2010-09-13 11:55:31","ACTIVE","5921000" "10IE-0460","EDINBURG ST","PERU AVE","AVALON AVE","StrtImprov","Joseph Vaccaro & Company","NTR #947014. Replace damaged sidewalk and driveway marked with white dots. Street space included.","2010-09-13 13:27:03","ACTIVE","5086000" "10IE-0464","HOWARD ST","05TH ST","MARY ST","StrtImprov","Asian Neighborhood Design","","2011-05-09 09:11:33","ACTIVE","7041000" "10IE-0467","NEWCOMB AVE","QUINT ST","RANKIN ST","StrtImprov","Gil Construction","","2011-07-11 13:37:07","ACTIVE","9556000" "10IE-0473","EDINBURG ST","RUSSIA AVE","FRANCE AVE","StrtImprov","D. Lopez Jr Concrete Construction","NTR #945357. Replace damaged sidewalk & curb, possible tree root problem; trim overgrown tree branches.","2010-09-15 16:24:07","ACTIVE","5091000" "10IE-0479","LELAND AVE","RUTLAND ST","CORA ST","StrtImprov","Bureau of Engineering","Replace the sidewalk and curb fronting this property on Leland Ave and Rutland St. All work is to be to city standards, directed by DPW-BSM inspector.","2011-01-10 15:33:58","ACTIVE","8296000" "10IE-0479","RUTLAND ST","LELAND AVE","VISITACION AVE","StrtImprov","Bureau of Engineering","Replace the sidewalk and curb fronting this property on Leland Ave and Rutland St. All work is to be to city standards, directed by DPW-BSM inspector.","2011-01-10 15:33:58","ACTIVE","11211000" "10IE-0481","04TH ST","FREELON ST","BRANNAN ST","StrtImprov","E.F. Gomez Cement Contractor","Per NTR 947676 reconstruct sidewalk and curb marked with white dots on both Brannan St and 4th St frontages.","2010-09-21 15:09:24","ACTIVE","264000" "10IE-0481","BRANNAN ST","04TH ST","05TH ST","StrtImprov","E.F. Gomez Cement Contractor","Per NTR 947676 reconstruct sidewalk and curb marked with white dots on both Brannan St and 4th St frontages.","2010-09-21 15:09:24","ACTIVE","3080000" "10IE-0486","JACKSON ST","GOUGH ST","OCTAVIA ST","StrtImprov","Doane + Doane Architects","Reconstruct concrete curb, sidewalk and curb cut with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2011-05-12 11:32:26","ACTIVE","7399000" "10IE-0495","PRECITA AVE","FOLSOM ST","HARRISON ST","StrtImprov","Cronin Construction","Repair curb, curb cut and sidewalk per NTR # 945266 to City Standards. Provide 2-foot pavement conform.","","ACTIVE","10743000" "10IE-0509","25TH ST","NOE ST","CASTRO ST","StrtImprov","American Asphalt Repair & Resurfacing Co","Construct one 28'-0" curb cut on 25th Street frontage of the property. All work shall be done per city standards. Break curb/gutter toward the property and create keyway in the roadeway base without disturbing the AC pavement.","","ACTIVE","1454000" "10IE-0510","GREENWICH ST","BRODERICK ST","BAKER ST","StrtImprov","L & W ENVIRONMENTAL SERVICES, Inc.","Repair curb and sidewalk as necessary to City Standards. Provide 2-foot pavement conform.","2010-10-05 12:43:49","ACTIVE","6524000" "10IE-0518","24TH ST","NOE ST","CASTRO ST","StrtImprov","TECTA associates","Reconstruct sidewalk, curb and parkign strip to city standards. All work directed by DPW inspector.","2010-11-02 15:24:34","ACTIVE","1362000" "10IE-0529","35TH AVE","MORAGA ST","NORIEGA ST","StrtImprov","S & H Concrete Construction","Reconstruct damaged sidewalk & driveway curb per city standard. (see NTR#929999)","2010-10-19 11:28:43","ACTIVE","1774000" "10IE-0531","SOMERSET ST","BURROWS ST","BACON ST","StrtImprov","Lewis M. Merlo, Inc.","Reconstruct city standard concrete sidewalk and curb per NTR#941004. 20' linear feet of street space included.","2010-10-20 09:25:24","ACTIVE","11969000" "10IE-0549","VALDEZ AVE","MANGELS AVE","BRENTWOOD AVE","StrtImprov","E.F. Gomez Cement Contractor","Reconstruct damaged sidewalk & portion of curb per NTR#943676 as directed by inspector.","2010-10-27 14:44:38","ACTIVE","13050000" "10IE-0574","BROADWAY","DIVISADERO ST","BRODERICK ST","StrtImprov","Butler Armsden Architects","Reconstruct curb and sidewalk to City Standards. Saw-cut 2' of AC gutter and replace with 2" ACWS on 8" concrete base.","2011-11-07 09:06:48","ACTIVE","3183000" "10IE-0578","GRANADA AVE","LAKEVIEW AVE","GRAFTON AVE","StrtImprov","Benjamin Pierce","Remove and replace sidewalk and curb/gutter with 2'pavement conform. Shift the existing curb cut northerly so that it would not encroach onto the adjacent property frontage. All work shall be done per city standards and as directed by city inspector.","2011-11-03 08:14:57","ACTIVE","6366000" "10IE-0581","PRAGUE ST","CURTIS ST","WINDING WAY","StrtImprov","E.F. Gomez Cement Contractor","Voluntary street improvement. Replace concrete curb and sidewalk per city standards. All work directed by DPW inspector.","2010-11-05 16:30:02","ACTIVE","10738000" "10IE-0590","UNDERWOOD AVE","JENNINGS ST","KEITH ST","StrtImprov","Santos & Urrutia","Reconstruct concrete curb, sidewalk and driveway with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector.","2011-04-04 11:50:45","ACTIVE","12828000" "10IE-0597","11TH AVE","KIRKHAM ST","LAWTON ST","StrtImprov","Maria Vaccaro","Reconstruct damaged sidewalk & driveway cut per NTR#950664 as directed by city inspector.","2010-11-15 13:58:42","ACTIVE","503000" "10IE-0599","38TH AVE","BALBOA ST","CABRILLO ST","StrtImprov","PROFESSIONAL CONCRETE SERVICE","Voluntary upgrade. Reconstruct concrete curb and sidewalk with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space #1225716.","2010-11-16 16:24:19","ACTIVE","1849000" "10IE-0605","AUSTIN ST","GOUGH ST","OCTAVIA ST","StrtImprov","B & B Contractors Services, LLC","Remove and replace sidewalk and curb/gutter with 2' pavement conform. Construct a new 10'-0" curb cut. All work shall be done per approved plan, per city standards and as directed by city inspector.","2011-08-22 09:56:14","ACTIVE","5794000" "10IE-0622","23RD ST","DIAMOND ST","EUREKA ST","StrtImprov","Apparatus Architecture","Remove and replace sidewalk and curb/gutter with 2' pavement conform. All work shall be done per city standards and as directed by City inspector.","2011-10-12 14:17:07","ACTIVE","1284000" "10IE-0630","JEFFERSON ST","WEBSTER ST","FILLMORE ST","StrtImprov","Michael Heavey Construction","Repair curb and sidewalk to City Standards per NTR # 949946. Provide 2-foot pavement conform.","2010-12-07 08:28:15","ACTIVE","7461000" "10IE-0637","ADDISON ST","DIGBY ST","FARNUM ST","StrtImprov","E.F. Gomez Cement Contractor","Repair curb (42 LF) and sidewalk (510 SF) to City Standards. Provide 2-foot pavement conform.","2010-12-07 16:09:28","ACTIVE","2094000" "10IE-0662","MADRID ST","AVALON AVE","EXCELSIOR AVE","StrtImprov","Sunset Concrete","Reconstruct & repair damaged sidewalk and driveway cut per NTR#950341.","2011-09-07 11:17:20","ACTIVE","8605000" "10MSE-0026","PRESIDIO AVE","JACKSON ST","WASHINGTON ST","MinorEnc","Butler Armsden Architects","","2011-09-27 08:57:59","ACTIVE","10762000" "10MSE-0060","DIAMOND ST","DUNCAN ST","28TH ST","MinorEnc","Navarro Concrete Construction","NTR #933961. Replace 24 flags of sidewalk. Install 2 new (n) railings and modify warped driveway to encroach 4'-6" into the public right-of-way. All work directed by DPW inspector.","2010-03-02 16:32:26","ACTIVE","4753000" "10MSE-0067","GROVE ST","CLAYTON ST","COLE ST","MinorEnc","L & W ENVIRONMENTAL SERVICES, Inc.","Abandoning existing (E) UST per subject property on the Grove Steet frontage.","2010-03-04 11:25:02","ACTIVE","6571000" "10MSE-0075","WASHINGTON ST","PRESIDIO AVE","WALNUT ST","MinorEnc","Butler Armsden Architects","2 existing steps measured 7' x 1.25' [construction date unknown]. Ref. BPA 201003087763","2010-03-12 13:48:58","ACTIVE","13446000" "10MSE-0093","TURK ST","HYDE ST","DODGE ST","MinorEnc","BASIS ARCHITECTURE","Elevator door over sub sidewalk basement.","2011-01-26 10:32:37","ACTIVE","12720000" "10MSE-0146","VALLEY ST","NOE ST","CASTRO ST","MinorEnc","Lewis M. Merlo, Inc.","Install a new 2'-7" hand rail with toeboard to mitigate excessive warping for an existing garage per subject property. Sidewalk shall be to Standards outside of the encroachment area.","2010-04-27 11:09:24","ACTIVE","13129000" "10MSE-0153","SUNNYDALE AVE","SANTOS ST","END","MinorEnc","CDX Builders, Inc.","3 New Level Landings [NO Annual Assessment for SFUSD]. Ref. 10IE-0125","2010-05-06 10:09:31","ACTIVE","12268000" "10MSE-0165","VALENCIA ST","16TH ST","17TH ST","MinorEnc","Samonsky + Pometta Architects, LLP","Existing sub-sidewalk basement","2010-05-14 10:53:08","ACTIVE","13060000" "10MSE-0251","STANYAN ST","PAGE ST","HAIGHT ST","MinorEnc","A.R. Sanchez-Corea & Associates, Inc.","One (1) existing outward swinging door along Haight Street encroaching 12-inches into the public right-of-way.","2010-07-27 10:01:04","ACTIVE","12090000" "10MSE-0258","20TH ST","FOLSOM ST","SHOTWELL ST","MinorEnc","Kwan & Associates","Existing concrete step encroaching 2'-8" into public sidewalk right of way.","2011-05-26 11:36:44","ACTIVE","1052000" "10MSE-0268","LEAVENWORTH ST","GOLDEN GATE AVE","TURK ST","MinorEnc","Lerner + Assoc. Architects","","2011-02-07 08:31:44","ACTIVE","8239000" "10N-0003","05TH ST","MISSION ST","MINNA ST","NightNoise","SBC - Pacific Bell Engineering","","2010-01-25 08:48:25","ACTIVE","293000" "10N-0013 ","GRANT AVE","MARKET ST \ OFARRELL ST","","NightNoise","Pacific Gas & Electric","","2010-02-12 09:40:27","ACTIVE","30768000" "10N-0013 ","MARKET ST","GRANT AVE \ OFARRELL ST","","NightNoise","Pacific Gas & Electric","","2010-02-12 09:40:27","ACTIVE","30768000" "10N-0013 ","MARKET ST","GRANT AVE \ OFARRELL ST","04TH ST \ ELLIS ST \ STOCKTON ST","NightNoise","Pacific Gas & Electric","","2010-02-12 09:40:27","ACTIVE","8746201" "10N-0013 ","OFARRELL ST","GRANT AVE \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2010-02-12 09:40:27","ACTIVE","30768000" "10N-0013 ","OFARRELL ST","GRANT AVE \ MARKET ST","SECURITY PACIFIC PL","NightNoise","Pacific Gas & Electric","","2010-02-12 09:40:27","ACTIVE","9720000" "10N-0013 ","OFARRELL ST","SECURITY PACIFIC PL","STOCKTON ST","NightNoise","Pacific Gas & Electric","","2010-02-12 09:40:27","ACTIVE","9721000" "10N-0020","MISSION ST","MARY ST","06TH ST","NightNoise","SBC - Pacific Bell Engineering","","2010-03-05 16:23:51","ACTIVE","9099000" "10N-0021","05TH ST","CLEMENTINA ST","","NightNoise","SBC - Pacific Bell Engineering","","2010-03-03 13:31:27","ACTIVE","23939000" "10N-0021","05TH ST","TEHAMA ST","","NightNoise","SBC - Pacific Bell Engineering","","2010-03-03 13:31:27","ACTIVE","23940000" "10N-0021","05TH ST","TEHAMA ST","CLEMENTINA ST","NightNoise","SBC - Pacific Bell Engineering","","2010-03-03 13:31:27","ACTIVE","297000" "10N-0021","CLEMENTINA ST","05TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2010-03-03 13:31:27","ACTIVE","23939000" "10N-0021","TEHAMA ST","05TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2010-03-03 13:31:27","ACTIVE","23940000" "10N-0024","BATTERY ST","CLAY ST","MERCHANT ST","NightNoise","Pacific Gas & Electric","","2010-03-04 11:37:40","ACTIVE","2758000" "10N-0037","OFARRELL ST","GRANT AVE \ MARKET ST","SECURITY PACIFIC PL","NightNoise","Pacific Gas & Electric","","2010-03-22 13:48:08","ACTIVE","9720000" "10N-0037","OFARRELL ST","SECURITY PACIFIC PL","STOCKTON ST","NightNoise","Pacific Gas & Electric","","2010-03-22 13:48:08","ACTIVE","9721000" "10N-0037","OFARRELL ST","STOCKTON ST","","NightNoise","Pacific Gas & Electric","","2010-03-22 13:48:08","ACTIVE","24902000" "10N-0037","STOCKTON ST","OFARRELL ST","","NightNoise","Pacific Gas & Electric","","2010-03-22 13:48:08","ACTIVE","24902000" "10N-0042","MISSION ST","04TH ST","05TH ST","NightNoise","Pacific Gas & Electric","","2010-04-02 11:29:28","ACTIVE","9096000" "10N-0054","09TH ST","HARRISON ST","MCLEA CT","NightNoise","SBC - Pacific Bell Engineering","","2010-04-19 15:13:54","ACTIVE","457000" "10N-0070","MONTGOMERY ST","SUTTER ST","","NightNoise","Pacific Gas & Electric","","2010-05-12 14:31:54","ACTIVE","24678000" "10N-0070","SUTTER ST","MONTGOMERY ST","","NightNoise","Pacific Gas & Electric","","2010-05-12 14:31:54","ACTIVE","24678000" "10N-0070","SUTTER ST","MONTGOMERY ST","TRINITY ST","NightNoise","Pacific Gas & Electric","","2010-05-12 14:31:54","ACTIVE","12317000" "10N-0071","07TH ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2010-05-06 11:30:22","ACTIVE","24315000" "10N-0071","09TH ST","JESSIE ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2010-05-06 11:30:22","ACTIVE","447000" "10N-0071","MISSION ST","07TH ST","","NightNoise","Pacific Gas & Electric","","2010-05-06 11:30:22","ACTIVE","24315000" "10N-0071","POST ST","ROBERT KIRK LN","GRANT AVE","NightNoise","Pacific Gas & Electric","","2010-05-06 11:30:22","ACTIVE","10626000" "10N-0071","STOCKTON ST","CAMPTON PL","STOCKTON TUNL \ SUTTER ST","NightNoise","Pacific Gas & Electric","","2010-05-06 11:30:22","ACTIVE","12199000" "10N-0092","03RD ST","20TH ST","22ND ST","NightNoise","SBC - Pacific Bell Engineering","","2010-06-02 09:56:25","ACTIVE","190201" "10N-0092","03RD ST","22ND ST","","NightNoise","SBC - Pacific Bell Engineering","","2010-06-02 09:56:25","ACTIVE","23555000" "10N-0092","22ND ST","03RD ST","","NightNoise","SBC - Pacific Bell Engineering","","2010-06-02 09:56:25","ACTIVE","23555000" "10N-0097","09TH ST","JESSIE ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2010-06-28 10:25:00","ACTIVE","447000" "10N-0097","09TH ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2010-06-28 10:25:00","ACTIVE","24313000" "10N-0097","MISSION ST","09TH ST","","NightNoise","Pacific Gas & Electric","","2010-06-28 10:25:00","ACTIVE","24313000" "10N-0097","SANSOME ST","SACRAMENTO ST","COMMERCIAL ST","NightNoise","Pacific Gas & Electric","","2010-06-28 10:25:00","ACTIVE","11547000" "10N-0097","STOCKTON ST","OFARRELL ST","GEARY ST","NightNoise","Pacific Gas & Electric","","2010-06-28 10:25:00","ACTIVE","12195000" "10N-0097","SUTTER ST","TRINITY ST","LICK PL","NightNoise","Pacific Gas & Electric","","2010-06-28 10:25:00","ACTIVE","12318001" "10N-0099","KEARNY ST","HARDIE PL","BUSH ST","NightNoise","Pacific Gas & Electric","","2010-07-07 14:25:29","ACTIVE","7752000" "10N-0099","KEARNY ST","SUTTER ST","HARDIE PL","NightNoise","Pacific Gas & Electric","","2010-07-07 14:25:29","ACTIVE","7751000" "10N-0103","KEARNY ST","SUTTER ST","","NightNoise","Pacific Gas & Electric","","2010-07-12 16:07:51","ACTIVE","24720000" "10N-0103","SUTTER ST","KEARNY ST","","NightNoise","Pacific Gas & Electric","","2010-07-12 16:07:51","ACTIVE","24720000" "10N-0125","OFARRELL ST","CYRIL MAGNIN ST","ELWOOD ST","NightNoise","Pacific Gas & Electric","","2010-08-02 09:57:34","ACTIVE","9724000" "10N-0133","JESSIE ST","NEW MONTGOMERY ST","","NightNoise","Pacific Gas & Electric","","2010-08-05 09:41:00","ACTIVE","24620000" "10N-0133","NEW MONTGOMERY ST","JESSIE ST","","NightNoise","Pacific Gas & Electric","","2010-08-05 09:41:00","ACTIVE","24620000" "10N-0133","NEW MONTGOMERY ST","JESSIE ST","AMBROSE BIERCE ST","NightNoise","Pacific Gas & Electric","","2010-08-05 09:41:00","ACTIVE","9542000" "10N-0141","OFARRELL ST","STOCKTON ST","POWELL ST","NightNoise","A & B Construction, Inc.","","2010-08-10 08:37:17","ACTIVE","9722000" "10N-0142","VIA FERLINGHETTI","END","UNION ST","NightNoise","Pacific Gas & Electric","","2010-08-12 14:12:16","ACTIVE","10774000" "10N-0167","KEARNY ST","HARDIE PL","BUSH ST","NightNoise","A. Ruiz Construction Co.","","2010-09-21 13:43:29","ACTIVE","7752000" "10N-0176","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Evans Brothers Inc.","","2010-09-29 08:20:49","ACTIVE","2864000" "10N-0193","GEARY BLVD","PALM AVE","ARGUELLO BLVD","NightNoise","SBC - Pacific Bell Engineering","","2010-10-21 15:26:20","ACTIVE","6056101" "10N-0201","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","OFARRELL ST","NightNoise","Pacific Gas & Electric","","2010-10-22 10:37:30","ACTIVE","12194000" "10N-0234","STOCKTON ST","OFARRELL ST","GEARY ST","NightNoise","Golden State Utility Company","","2010-11-23 15:11:20","ACTIVE","12195000" "10N-0236","WARREN DR","DEVONSHIRE WAY","OAKHURST LN","NightNoise","Pacific Gas & Electric","","2010-11-29 16:20:18","ACTIVE","13400000" "10N-0236","WARREN DR","OAKHURST LN","LAWTON ST \ LOCKSLEY AVE","NightNoise","Pacific Gas & Electric","","2010-11-29 16:20:18","ACTIVE","13401000" "10N-0247","OFARRELL ST","STOCKTON ST","POWELL ST","NightNoise","Pacific Gas & Electric","","2011-01-03 11:11:14","ACTIVE","9722000" "10N-0247","POWELL ST","ELLIS ST","OFARRELL ST","NightNoise","Pacific Gas & Electric","","2011-01-03 11:11:14","ACTIVE","10676000" "10N-0248","01ST ST","MINNA ST","","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","24542000" "10N-0248","01ST ST","MINNA ST","NATOMA ST","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","105000" "10N-0248","01ST ST","MISSION ST","TRANSBAY HUMP","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","104001" "10N-0248","01ST ST","NATOMA ST","","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","24534000" "10N-0248","01ST ST","NATOMA ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","106000" "10N-0248","01ST ST","TRANSBAY HUMP","","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","54001000" "10N-0248","01ST ST","TRANSBAY HUMP","MINNA ST","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","104002" "10N-0248","MINNA ST","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","24542000" "10N-0248","NATOMA ST","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","24534000" "10N-0248","NATOMA ST","01ST ST","02ND ST","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","9507000" "10N-0248","TRANSBAY HUMP","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-01-03 15:18:57","ACTIVE","54001000" "10S-0047","LOMBARD ST","JULIUS ST","GRANT AVE","SideSewer","RESCUE ROOTER","To connect 6" side sewer to the city main.","2010-03-16 13:59:37","ACTIVE","8437000" "10S-0056","OLIVE ST","VAN NESS AVE","FRANKLIN ST","SideSewer","ACE Drilling & Excavation","To install 6" side sewer connectiong to city main. (Ref: 10S-0013, expired)","2010-03-22 08:31:58","ACTIVE","9920000" "10S-0082","CASTRO ST","ALVARADO ST","23RD ST","SideSewer","Uniacke Construction","Repair an existing 6" side sewer to a main with 4 hours of inspection. Street space included.","2010-05-07 16:48:43","ACTIVE","3798000" "10S-0129","GEARY ST","STOCKTON ST","POWELL ST","SideSewer","A & B Construction, Inc.","","2010-08-09 16:29:56","ACTIVE","6109000" "10S-0129","OFARRELL ST","STOCKTON ST","POWELL ST","SideSewer","A & B Construction, Inc.","","2010-08-09 16:29:56","ACTIVE","9722000" "10S-0157","WASHINGTON ST","WALNUT ST","LAUREL ST","SideSewer","Uniacke Construction","Repair an existing 6" side sewer to a 12" main with 4 hours of inspection. Street space #1214375","2010-08-27 08:55:27","ACTIVE","13447000" "10S-0216","WALNUT ST","PACIFIC AVE","JACKSON ST","SideSewer","O'Grady Plumbing","Repair 6" side sewer connecting to a 12" main with 4 hours of inspection time.","2010-12-06 12:25:20","ACTIVE","13381000" "10S-0237","POTRERO AVE","24TH ST","25TH ST","SideSewer","TARA ENGINEERING","Repair an existing 6" sewer in the first lane of traffic to the curb.","2010-12-28 07:55:53","ACTIVE","10672000" "10SSP-00052","15TH ST","LANDERS ST","CHURCH ST","StreetSpace","Ruiz Kruger Group Construction","","2010-08-03 11:07:09","ACTIVE","660000" "10SSP-00054","MANGELS AVE","GENNESSEE ST","RIDGEWOOD AVE","StreetSpace","Amber Evans","","2010-06-17 14:49:54","ACTIVE","8654000" "10SSP-00075","CHAVES AVE","DEL SUR AVE","ROCKDALE DR","StreetSpace","Kevin Phillip Sullivan","","2010-07-06 13:20:42","ACTIVE","3915000" "10SSP-00075","DEL SUR AVE","JUANITA WAY","CHAVES AVE","StreetSpace","Kevin Phillip Sullivan","","2010-07-06 13:20:42","ACTIVE","4698000" "10SSP-00082","FOLSOM ST","19TH ST","20TH ST","StreetSpace","2366 FOLSOM ST","","2010-07-09 10:23:27","ACTIVE","5694000" "10SSP-00092","CARL ST","CLAYTON ST","COLE ST","StreetSpace","Myron William Coppock","","2010-07-12 16:56:51","ACTIVE","3694000" "10SSP-00096","LINDA ST","18TH ST","19TH ST","StreetSpace","Philip Adam Rossetti","","2010-07-13 16:37:53","ACTIVE","8388000" "10SSP-00101","PRECITA AVE","MISSION ST","COSO AVE","StreetSpace","Henry Louie","","2010-07-15 16:20:46","ACTIVE","4449000" "10SSP-00112","SOUTH VAN NESS AVE","16TH ST","17TH ST","StreetSpace","COASTAL PAVING, INC.","","2010-07-23 11:12:58","ACTIVE","12023000" "10SSP-00116","ASHBURY ST","FULTON ST \ HEMWAY TER","GROVE ST","StreetSpace","Joseph Vaccaro & Company","","2010-07-26 09:42:52","ACTIVE","2508000" "10SSP-00117","BEACON ST","HARRY ST","","StreetSpace","DANLIN CORPORATION","","2010-07-26 09:48:22","ACTIVE","33370000" "10SSP-00117","HARRY ST","BEACON ST","","StreetSpace","DANLIN CORPORATION","","2010-07-26 09:48:22","ACTIVE","33370000" "10SSP-00121","15TH AVE","CALIFORNIA ST","CLEMENT ST","StreetSpace","Jerry Lombardi Construction, Inc.","","2010-07-27 12:01:33","ACTIVE","606000" "10SSP-00123","COLON AVE","MANGELS AVE","BRENTWOOD AVE","StreetSpace","416 COLON AVE","","2010-07-27 15:00:01","ACTIVE","4281000" "10SSP-00126","BRENTWOOD AVE","YERBA BUENA AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","StreetSpace","290 BRENTWOOD AVE","","2010-07-28 15:31:57","ACTIVE","3111000" "10SSP-00127","SHRADER ST","GROVE ST","HAYES ST","StreetSpace","Gonzalez Concrete","","2010-07-28 15:45:47","ACTIVE","11852000" "10SSP-00138","PRECITA AVE","ALABAMA ST","FLORIDA ST","StreetSpace","Erin Mullin","","2010-08-03 16:46:05","ACTIVE","10745000" "10SSP-00142","FREDERICK ST","SHRADER ST","STANYAN ST","StreetSpace","491 FREDERICK ST","","2010-08-06 13:24:53","ACTIVE","5853000" "10SSP-00145","EL VERANO WAY","FERNWOOD DR","MAYWOOD DR","StreetSpace","85 EL VERANO WAY","","2010-08-09 11:46:01","ACTIVE","5135000" "10SSP-00148","BEULAH ST","SHRADER ST","STANYAN ST","StreetSpace","Joseph Vaccaro & Company","","2010-08-09 12:00:43","ACTIVE","2966000" "10SSP-00156","CARL ST","COLE ST","SHRADER ST","StreetSpace","168 CARL ST","","2010-08-11 10:43:14","ACTIVE","3695000" "10SSP-00161","30TH ST","SANCHEZ ST","","StreetSpace","1696 SANCHEZ ST","","2010-08-11 14:20:25","ACTIVE","21886000" "10SSP-00161","SANCHEZ ST","30TH ST","","StreetSpace","1696 SANCHEZ ST","","2010-08-11 14:20:25","ACTIVE","21886000" "10SSP-00166","BRENTWOOD AVE","VALDEZ AVE","COLON AVE","StreetSpace","Gonzalez Concrete","","2010-08-12 13:31:24","ACTIVE","3109000" "10SSP-00176","WILLARD ST","FREDERICK ST","CARL ST","StreetSpace","1227 WILLARD ST","","2010-08-18 10:25:44","ACTIVE","13641000" "10SSP-00180","DOWNEY ST","FREDERICK ST","ASHBURY ST","StreetSpace","216 DOWNEY ST","","2010-08-18 16:47:06","ACTIVE","4965000" "10SSP-00181","SHRADER ST","HAYES ST","FELL ST","StreetSpace","E.F. Gomez Cement Contractor","","2010-08-20 10:33:45","ACTIVE","11853000" "10SSP-00182","YERBA BUENA AVE","BAXTER ALY","CASITAS AVE \ HAZELWOOD AVE","StreetSpace","E.F. Gomez Cement Contractor","","2010-08-20 10:41:07","ACTIVE","13751000" "10SSP-00183","YERBA BUENA AVE","BAXTER ALY","CASITAS AVE \ HAZELWOOD AVE","StreetSpace","E.F. Gomez Cement Contractor","","2010-08-20 10:48:18","ACTIVE","13751000" "10SSP-00186","ASHBURY ST","DOWNEY ST","CLAYTON ST","StreetSpace","D. Lopez Jr Concrete Construction","","2010-08-23 10:20:12","ACTIVE","2518000" "10SSP-00188","FREDERICK ST","SHRADER ST","STANYAN ST","StreetSpace","491 FREDERICK ST","","2010-08-24 12:56:28","ACTIVE","5853000" "10SSP-00193","21ST ST","SHOTWELL ST","SOUTH VAN NESS AVE","StreetSpace","Joseph Festinese","","2010-08-25 09:41:40","ACTIVE","1106000" "10SSP-00194","COLE ST","FREDERICK ST","CARL ST","StreetSpace","CAS CONSTRUCTION","","2010-08-25 11:07:28","ACTIVE","4242000" "10SSP-00196","28TH ST","DIAMOND ST","DOUGLASS ST","StreetSpace","654 28TH ST","","2010-08-26 09:22:40","ACTIVE","1605000" "10SSP-00198","SCOTT ST","PAGE ST","OAK ST","StreetSpace","Joseph Vaccaro & Company","","2010-08-26 13:56:46","ACTIVE","11685000" "10SSP-00199","SCOTT ST","PAGE ST","OAK ST","StreetSpace","Joseph Vaccaro & Company","","2010-08-26 13:59:52","ACTIVE","11685000" "10SSP-00200","FAIR OAKS ST","23RD ST","24TH ST","StreetSpace","Joseph Vaccaro & Company","","2010-08-26 13:53:35","ACTIVE","5383000" "10SSP-00203","PRECITA AVE","FOLSOM ST","HARRISON ST","StreetSpace","355 PRECITA AVE","","2010-08-27 09:40:44","ACTIVE","10743000" "10SSP-00238","CLAYTON ST","PARNASSUS AVE","ASHBURY ST","StreetSpace","1101 CLAYTON ST","","2010-09-09 11:08:10","ACTIVE","4136000" "10SSP-00243","CLAYTON ST","PARNASSUS AVE","ASHBURY ST","StreetSpace","Pappas Construction","","2010-09-10 15:00:27","ACTIVE","4136000" "10SSP-00246","25TH ST","POPLAR ST","SAN JOSE AVE","StreetSpace","Finbarr O'donovan Construction","","2010-09-10 15:25:00","ACTIVE","1446000" "10SSP-00250","EDGEWOOD AVE","BELMONT AVE","END","StreetSpace","J S CONCRETE CONSTRUCTION INC","","2010-09-13 11:12:13","ACTIVE","5084000" "10SSP-00251","EDGEWOOD AVE","BELMONT AVE","END","StreetSpace","J S CONCRETE CONSTRUCTION INC","","2010-09-13 11:23:25","ACTIVE","5084000" "10SSP-00252","PARNASSUS AVE","BELVEDERE ST","COLE ST","StreetSpace","D. Lopez Jr Concrete Construction","","2010-09-13 11:48:18","ACTIVE","10286000" "10SSP-00253","COLE ST","CARL ST","PARNASSUS AVE","StreetSpace","D. Lopez Jr Concrete Construction","","2010-09-13 12:30:47","ACTIVE","4243000" "10SSP-00254","DELMAR ST","WALLER ST","FREDERICK ST","StreetSpace","PROFESSIONAL CONCRETE SERVICE","","2010-09-13 12:41:46","ACTIVE","4695000" "10SSP-00255","COLE ST","CARL ST","PARNASSUS AVE","StreetSpace","D. Lopez Jr Concrete Construction","","2010-09-13 12:52:08","ACTIVE","4243000" "10SSP-00260","BELVEDERE ST","GRATTAN ST","ALMA ST","StreetSpace","D. Lopez Jr Concrete Construction","","2010-09-13 14:41:18","ACTIVE","2911000" "10SSP-00261","07TH AVE","JUDAH ST","KIRKHAM ST","StreetSpace","1409 07TH AVE","","2010-09-13 15:18:15","ACTIVE","361000" "10SSP-00262","BELVEDERE ST","GRATTAN ST","ALMA ST","StreetSpace","D. Lopez Jr Concrete Construction","","2010-09-13 14:54:00","ACTIVE","2911000" "10SSP-00264","VALENCIA ST","16TH ST","17TH ST","StreetSpace","Web Toes LLC","","2010-09-13 15:39:20","ACTIVE","13060000" "10SSP-00266","PARNASSUS AVE","CLAYTON ST","BELVEDERE ST","StreetSpace","E.F. Gomez Cement Contractor","","2010-09-13 15:53:45","ACTIVE","10285000" "10SSP-00267","UPPER TER","MONUMENT WAY","END","StreetSpace","E.F. Gomez Cement Contractor","","2010-09-13 16:00:34","ACTIVE","13018001" "10SSP-00272","EDGEWOOD AVE","BELMONT AVE","END","StreetSpace","J S CONCRETE CONSTRUCTION INC","","2010-09-14 09:54:38","ACTIVE","5084000" "10SSP-00288","FREDERICK ST","CLAYTON ST","BELVEDERE ST","StreetSpace","Gonzalez Concrete","","2010-09-20 12:03:51","ACTIVE","5850000" "10SSP-00315","PAGE ST","CLAYTON ST","COLE ST","StreetSpace","Robert Michael Francis","","2010-09-23 16:16:48","ACTIVE","10186000" "10SSP-00322","EDINBURG ST","PERU AVE","AVALON AVE","StreetSpace","183 EDINBURG ST","","2010-09-24 16:19:53","ACTIVE","5086000" "10SSP-00324","ANZA ST","MASONIC AVE \ OFARRELL ST","","StreetSpace","Grand Industries INC.","","2010-09-24 16:26:18","ACTIVE","26400000" "10SSP-00324","MASONIC AVE","ANZA ST \ OFARRELL ST","","StreetSpace","Grand Industries INC.","","2010-09-24 16:26:18","ACTIVE","26400000" "10SSP-00324","OFARRELL ST","ANZA ST \ MASONIC AVE","","StreetSpace","Grand Industries INC.","","2010-09-24 16:26:18","ACTIVE","26400000" "10SSP-00329","MISSION ST","RICHLAND AVE","COLLEGE AVE \ CRESCENT AVE","StreetSpace","3811 MISSION ST","","2010-09-27 10:19:18","ACTIVE","9146000" "10SSP-00336","17TH ST","SHOTWELL ST","","StreetSpace","Michael York","","2010-09-28 11:19:46","ACTIVE","24135000" "10SSP-00336","SHOTWELL ST","17TH ST","","StreetSpace","Michael York","","2010-09-28 11:19:46","ACTIVE","24135000" "10SSP-00347","GRAND VIEW AVE","24TH ST","25TH ST","StreetSpace","Service Concrete Company","","2010-09-29 14:34:35","ACTIVE","6378000" "10SSP-00348","MANCHESTER ST","BESSIE ST","STONEMAN ST","StreetSpace","Cronin Construction","","2010-09-29 15:52:19","ACTIVE","8643000" "10SSP-00356","LIBERTY ST","NOE ST","CASTRO ST","StreetSpace","534 LIBERTY ST","","2010-10-01 15:10:19","ACTIVE","8328000" "10SSP-00357","EDGEWOOD AVE","BELMONT AVE","END","StreetSpace","201 EDGEWOOD AVE","","2010-10-01 15:12:06","ACTIVE","5084000" "10SSP-00359","SOUTH VAN NESS AVE","21ST ST","22ND ST","StreetSpace","Joseph Vaccaro & Company","","2010-10-04 11:55:45","ACTIVE","12028000" "10SSP-00378","24TH ST","HOMESTEAD ST","HOFFMAN AVE","StreetSpace","4394 24TH ST","","2010-10-07 15:08:13","ACTIVE","1366000" "10SSP-00379","24TH ST","HOMESTEAD ST","HOFFMAN AVE","StreetSpace","4388 24TH ST","","2010-10-07 15:18:12","ACTIVE","1366000" "10SSP-00380","22ND ST","SAN JOSE AVE","GUERRERO ST","StreetSpace","3385 22ND ST","","2010-10-07 15:30:08","ACTIVE","1194000" "10SSP-00385","STEINER ST","HAYES ST","GROVE ST","StreetSpace","Guidry Concrete","","","ACTIVE","12125000" "10SSP-00400","CARL ST","STANYAN ST","WILLARD ST","StreetSpace","274 CARL ST","","","ACTIVE","3697000" "10SSP-00408","SHRADER ST","BEULAH ST","FREDERICK ST","StreetSpace","E.F. Gomez Cement Contractor","","","ACTIVE","11858000" "10SSP-00409","FREDERICK ST","MASONIC AVE","DELMAR ST","StreetSpace","E.F. Gomez Cement Contractor","","","ACTIVE","5846000" "10SSP-00415","DOWNEY ST","FREDERICK ST","ASHBURY ST","StreetSpace","232 DOWNEY ST","","","ACTIVE","4965000" "10SSP-00416","DOWNEY ST","FREDERICK ST","ASHBURY ST","StreetSpace","Pao Tien Chuang","","","ACTIVE","4965000" "10SSP-00417","DOWNEY ST","FREDERICK ST","ASHBURY ST","StreetSpace","237 DOWNEY ST","","","ACTIVE","4965000" "10SSP-00431","WALLER ST","SHRADER ST","STANYAN ST","StreetSpace","Golden Gate Concrete","","","ACTIVE","13380000" "10SSP-00439","30TH ST","CHENERY ST","CHURCH ST","StreetSpace","274 30TH ST","","","ACTIVE","1667000" "10SSP-00451","HAYES ST","CENTRAL AVE","MASONIC AVE","StreetSpace","Lewis M. Merlo, Inc.","","","ACTIVE","6829000" "10SW-0006 ","SHRADER ST","17TH ST","CARMEL ST","SpecSide","Ashbury Construction","Concrete paver at gargage way per neighborhood pattern","2010-02-01 12:32:13","ACTIVE","11864000" "10SWR-0049","LAFAYETTE ST","MINNA ST","NATOMA ST","Sidewalk","54 LAFAYETTE ST","","2010-07-01 15:44:43","ACTIVE","7937000" "10WR-0081","CASTRO ST","BEMIS ST \ SUSSEX ST","LAIDLEY ST","Wireless","NextG Network, Inc","","","ACTIVE","3814000" "11BW-0002","VALENCIA ST","24TH ST","25TH ST","Boring","TRC ENVIRONMENTAL SOLUTIONS, INC - Concord","Install a new gasket for well MW-9 located in parking strip. Traffic control on east side of Valencia St. near 24th St. 1 day Temp. Occupancy is charged.","2011-01-12 13:12:27","ACTIVE","13073000" "11BW-0013","KEARNY ST","PINE ST","CALIFORNIA ST","Boring","BASELINE ENVIRONMENTAL","5 injection wells. See diagram.","2011-05-03 16:25:11","ACTIVE","7754000" "11CN-0083","PACIFIC AVE","POLK ST","VAN NESS AVE","conformity","Teresa Nittolo","","2011-05-02 08:34:01","ACTIVE","10147000" "11CN-0138","PLYMOUTH AVE","MANGELS AVE","SAINT ELMO WAY \ YERBA BUENA AVE","conformity","Halcyon Ventures Inc. DBA: Synergy Construction Co. ","","2011-07-25 13:21:05","ACTIVE","10533000" "11CN-0147","LOCUST ST","SACRAMENTO ST","CALIFORNIA ST","conformity","Sergio Maciel","","2011-08-10 11:47:19","ACTIVE","8425000" "11CN-0215","OAK ST","BUCHANAN ST","WEBSTER ST","conformity","Chris Murphy","","2011-11-14 15:33:47","ACTIVE","9755000" "11E-0106","REDWOOD ST","POLK ST","VAN NESS AVE","ExcStreet","Yerba Buena Engineering and Construction, Inc.","Excavate to install SFDT conduit along Redwood street from the building to the manhole (MH2748) at the intersection of Redwood and Polk Streets. Street Space use under permit#M242187.","2011-08-03 15:15:40","ACTIVE","10955000" "11E-0152","02ND AVE","CLEMENT ST","GEARY BLVD","ExcStreet","K. J. WOODS CONSTRUCTION INC.","To excavate for PG&E gas piping installation.","2011-08-05 16:22:27","ACTIVE","122000" "11E-0152","GEARY BLVD","02ND AVE","03RD AVE","ExcStreet","K. J. WOODS CONSTRUCTION INC.","To excavate for PG&E gas piping installation.","2011-08-05 16:22:27","ACTIVE","6058201" "11E-0172","LEE AVE","OCEAN AVE","","ExcStreet","A & B Construction, Inc.","Trenching and backfilling for a 8" Class 53 Dip water main, minimum 10' east of (N) 27" VCP sewer main on Lee Avenue. Abandon (E) 24" sewer line per Caltrans standards. Final pavement restoration will be per 09IE-0693.","2011-08-26 17:12:54","ACTIVE","22223000" "11E-0172","OCEAN AVE","LEE AVE","","ExcStreet","A & B Construction, Inc.","Trenching and backfilling for a 8" Class 53 Dip water main, minimum 10' east of (N) 27" VCP sewer main on Lee Avenue. Abandon (E) 24" sewer line per Caltrans standards. Final pavement restoration will be per 09IE-0693.","2011-08-26 17:12:54","ACTIVE","22223000" "11E-0193","BEALE ST","MISSION ST","HOWARD ST","ExcStreet","Balfour Beatty Infrastructure, Inc.","Installation of the CDSM wall on Beale Street 24 hour operations.","2011-09-02 15:24:31","ACTIVE","2864000" "11E-0198","HWY 1 NORTHBOUND","HWY 1 SOUTHBOUND \ LAKE ST \ PARK PRESIDIO BLVD","","ExcStreet","Reliance Engineering Inc.","Installation of conduit for Caltrans at the intersection of Park Presidio and Lake Street. Restore right-of-way to City Standards.","2011-09-09 12:07:15","ACTIVE","27628000" "11E-0198","HWY 1 SOUTHBOUND","HWY 1 NORTHBOUND \ LAKE ST \ PARK PRESIDIO BLVD","","ExcStreet","Reliance Engineering Inc.","Installation of conduit for Caltrans at the intersection of Park Presidio and Lake Street. Restore right-of-way to City Standards.","2011-09-09 12:07:15","ACTIVE","27628000" "11E-0198","LAKE ST","HWY 1 NORTHBOUND \ HWY 1 SOUTHBOUND \ PARK PRESIDIO BLVD","","ExcStreet","Reliance Engineering Inc.","Installation of conduit for Caltrans at the intersection of Park Presidio and Lake Street. Restore right-of-way to City Standards.","2011-09-09 12:07:15","ACTIVE","27628000" "11E-0198","PARK PRESIDIO BLVD","HWY 1 NORTHBOUND \ HWY 1 SOUTHBOUND \ LAKE ST","","ExcStreet","Reliance Engineering Inc.","Installation of conduit for Caltrans at the intersection of Park Presidio and Lake Street. Restore right-of-way to City Standards.","2011-09-09 12:07:15","ACTIVE","27628000" "11EXC-0057","BANKS ST","JARBOE AVE","TOMPKINS AVE","Excavation","San Francisco Water Department","EAST SIDE OF BANKS 3 FEET N/TOMPKINS","2011-03-09 16:56:01","ACTIVE","2718000" "11EXC-0197","CLEMENT ST","02ND AVE","03RD AVE","Excavation","SBC - Pacific Bell Engineering","R201 8067467","2011-01-14 13:19:33","ACTIVE","4151000" "11EXC-0246","CORTLAND AVE","FOLSOM ST","","Excavation","San Francisco Water Department","INTERSECTION FOLSOM AND CORTLAND","2011-02-10 11:36:57","ACTIVE","21079000" "11EXC-0246","FOLSOM ST","CORTLAND AVE","","Excavation","San Francisco Water Department","INTERSECTION FOLSOM AND CORTLAND","2011-02-10 11:36:57","ACTIVE","21079000" "11EXC-0252","URANUS TER","17TH ST \ ROOSEVELT WAY","DEMING ST","Excavation","San Francisco Water Department","31 Uranus Terrace, see 10exc-4511, extend for construction, we are ready to have construction meeting and then install.","2011-01-20 11:41:26","ACTIVE","13020000" "11EXC-0800","GEARY BLVD","BAKER ST \ SAINT JOSEPHS AVE","LYON ST","Excavation","Pacific Gas & Electric","Geary Cable Replacement Project","2011-02-23 14:45:05","ACTIVE","6045201" "11EXC-0832","MIRAMAR AVE","LAKEVIEW AVE","GRAFTON AVE","Excavation","Pacific Gas & Electric","46 mirarmar ave...282' n/o lakeview ave","2012-01-31 07:38:48","APPROVED","9070000" "11EXC-1020","BUCHANAN ST","NORTH POINT ST","","Excavation","Cable Com of California Inc","3636 BUCHANAN","2011-06-24 15:51:17","ACTIVE","26756000" "11EXC-1020","NORTH POINT ST","BUCHANAN ST","","Excavation","Cable Com of California Inc","3636 BUCHANAN","2011-06-24 15:51:17","ACTIVE","26756000" "11EXC-1020","NORTH POINT ST","BUCHANAN ST","WEBSTER ST","Excavation","Cable Com of California Inc","3636 BUCHANAN","2011-06-24 15:51:17","ACTIVE","9699000" "11EXC-1020","NORTH POINT ST","LAGUNA ST","BUCHANAN ST","Excavation","Cable Com of California Inc","3636 BUCHANAN","2011-06-24 15:51:17","ACTIVE","9698000" "11EXC-1093","PORTOLA DR","TWIN PEAKS BLVD","OSHAUGHNESSY BLVD \ WOODSIDE AVE","Excavation","Pacific Gas & Electric","Portola Dr. at Twin Peaks Blvd.(2011 CABLE REPLACEMENT PROGRAM, A-1117)","2012-01-18 08:57:23","APPROVED","10614101" "11EXC-1189","LARKIN ST","CHESTNUT ST","FRANCISCO ST","Excavation","San Francisco Water Department","2709 LARKIN","2011-03-24 10:56:00","ACTIVE","8155000" "11EXC-1191","FULTON ST","ASHBURY ST \ HEMWAY TER","LOYOLA TER","Excavation","J. Flores Construction Co.","Spot Sewer 25, Contract# WW-521, Work Order 3, PUCSW00685883/SW00666212/SW00554978, 1930/2047 Fulton St.","","ACTIVE","5898000" "11EXC-1191","FULTON ST","CLAYTON ST","COLE ST","Excavation","J. Flores Construction Co.","Spot Sewer 25, Contract# WW-521, Work Order 3, PUCSW00685883/SW00666212/SW00554978, 1930/2047 Fulton St.","","ACTIVE","5900000" "11EXC-1316","ASHBURTON PL","GRANT AVE","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","54155000" "11EXC-1316","CAMPTON PL","GRANT AVE","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24661000" "11EXC-1316","GRANT AVE","ASHBURTON PL","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","54155000" "11EXC-1316","GRANT AVE","ASHBURTON PL","CAMPTON PL","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","6384002" "11EXC-1316","GRANT AVE","CAMPTON PL","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24661000" "11EXC-1316","GRANT AVE","CAMPTON PL","TILLMAN PL","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","6385000" "11EXC-1316","GRANT AVE","MAIDEN LN","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24649000" "11EXC-1316","GRANT AVE","MAIDEN LN","POST ST","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","6383000" "11EXC-1316","GRANT AVE","POST ST","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24660000" "11EXC-1316","GRANT AVE","POST ST","ASHBURTON PL","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","6384001" "11EXC-1316","GRANT AVE","SUTTER ST","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24662000" "11EXC-1316","GRANT AVE","TILLMAN PL","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24663000" "11EXC-1316","GRANT AVE","TILLMAN PL","SUTTER ST","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","6386000" "11EXC-1316","MAIDEN LN","GRANT AVE","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24649000" "11EXC-1316","POST ST","GRANT AVE","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24660000" "11EXC-1316","SUTTER ST","GRANT AVE","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24662000" "11EXC-1316","TILLMAN PL","GRANT AVE","","Excavation","Cable Com of California Inc","77 MAIDEN LANE","","ACTIVE","24663000" "11EXC-1386","BRIGHTON AVE","OCEAN AVE","","Excavation","Pacific Gas & Electric","IN FRONT OF 1150 OCEAN AV.","2011-04-01 12:56:15","ACTIVE","22222000" "11EXC-1386","OCEAN AVE","BRIGHTON AVE","","Excavation","Pacific Gas & Electric","IN FRONT OF 1150 OCEAN AV.","2011-04-01 12:56:15","ACTIVE","22222000" "11EXC-1386","OCEAN AVE","BRIGHTON AVE","PLYMOUTH AVE","Excavation","Pacific Gas & Electric","IN FRONT OF 1150 OCEAN AV.","2011-04-01 12:56:15","ACTIVE","9821201" "11EXC-1386","OCEAN AVE","LEE AVE","BRIGHTON AVE","Excavation","Pacific Gas & Electric","IN FRONT OF 1150 OCEAN AV.","2011-04-01 12:56:15","ACTIVE","9820201" "11EXC-1389","RAYMOND AVE","RUTLAND ST","","Excavation","Pacific Gas & Electric","Install New Electric Main Line","2011-10-05 07:47:07","ACTIVE","20357000" "11EXC-1389","RAYMOND AVE","RUTLAND ST","DELTA ST","Excavation","Pacific Gas & Electric","Install New Electric Main Line","2011-10-05 07:47:07","ACTIVE","10944000" "11EXC-1389","RUTLAND ST","RAYMOND AVE","","Excavation","Pacific Gas & Electric","Install New Electric Main Line","2011-10-05 07:47:07","ACTIVE","20357000" "11EXC-1389","RUTLAND ST","RAYMOND AVE","LELAND AVE","Excavation","Pacific Gas & Electric","Install New Electric Main Line","2011-10-05 07:47:07","ACTIVE","11210000" "11EXC-1530","18TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24132000" "11EXC-1530","20TH ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24144000" "11EXC-1530","20TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24128000" "11EXC-1530","21ST ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24113000" "11EXC-1530","21ST ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24083000" "11EXC-1530","22ND ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24111000" "11EXC-1530","22ND ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24081000" "11EXC-1530","23RD ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24094000" "11EXC-1530","23RD ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24075000" "11EXC-1530","24TH ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24088000" "11EXC-1530","24TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24063000" "11EXC-1530","25TH ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24073000" "11EXC-1530","25TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24062000" "11EXC-1530","26TH ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","21306000" "11EXC-1530","26TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","21296000" "11EXC-1530","BACON ST","SAN BRUNO AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","33647000" "11EXC-1530","DWIGHT ST","SAN BRUNO AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","20600000" "11EXC-1530","MISSION ST","20TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24144000" "11EXC-1530","MISSION ST","20TH ST","CATHERINE CT","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9122001" "11EXC-1530","MISSION ST","21ST ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24113000" "11EXC-1530","MISSION ST","21ST ST","22ND ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9123000" "11EXC-1530","MISSION ST","22ND ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24111000" "11EXC-1530","MISSION ST","22ND ST","23RD ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9124000" "11EXC-1530","MISSION ST","23RD ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24094000" "11EXC-1530","MISSION ST","23RD ST","24TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9125000" "11EXC-1530","MISSION ST","24TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24088000" "11EXC-1530","MISSION ST","24TH ST","25TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9126000" "11EXC-1530","MISSION ST","25TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24073000" "11EXC-1530","MISSION ST","25TH ST","26TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9127000" "11EXC-1530","MISSION ST","26TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","21306000" "11EXC-1530","MISSION ST","26TH ST","CAPP ST \ CESAR CHAVEZ ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9128000" "11EXC-1530","MISSION ST","CATHERINE CT","21ST ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","9122002" "11EXC-1530","PAUL AVE","SAN BRUNO AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","20578000" "11EXC-1530","SAN BRUNO AVE","BACON ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","33647000" "11EXC-1530","SAN BRUNO AVE","BACON ST","WAYLAND ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","11378000" "11EXC-1530","SAN BRUNO AVE","DWIGHT ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","20600000" "11EXC-1530","SAN BRUNO AVE","DWIGHT ST","PAUL AVE","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","11381000" "11EXC-1530","SAN BRUNO AVE","PAUL AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","20578000" "11EXC-1530","SAN BRUNO AVE","WAYLAND ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","33272000" "11EXC-1530","SAN BRUNO AVE","WAYLAND ST","WOOLSEY ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","11379000" "11EXC-1530","SAN BRUNO AVE","WOOLSEY ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","33273000" "11EXC-1530","SAN BRUNO AVE","WOOLSEY ST","DWIGHT ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","11380000" "11EXC-1530","SOUTH VAN NESS AVE","18TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24132000" "11EXC-1530","SOUTH VAN NESS AVE","18TH ST","19TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12025000" "11EXC-1530","SOUTH VAN NESS AVE","19TH ST","20TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12026000" "11EXC-1530","SOUTH VAN NESS AVE","20TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24128000" "11EXC-1530","SOUTH VAN NESS AVE","20TH ST","21ST ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12027000" "11EXC-1530","SOUTH VAN NESS AVE","21ST ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24083000" "11EXC-1530","SOUTH VAN NESS AVE","21ST ST","22ND ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12028000" "11EXC-1530","SOUTH VAN NESS AVE","22ND ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24081000" "11EXC-1530","SOUTH VAN NESS AVE","22ND ST","23RD ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12029000" "11EXC-1530","SOUTH VAN NESS AVE","23RD ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24075000" "11EXC-1530","SOUTH VAN NESS AVE","23RD ST","24TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12030000" "11EXC-1530","SOUTH VAN NESS AVE","24TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24063000" "11EXC-1530","SOUTH VAN NESS AVE","24TH ST","25TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12031000" "11EXC-1530","SOUTH VAN NESS AVE","25TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","24062000" "11EXC-1530","SOUTH VAN NESS AVE","25TH ST","26TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12032000" "11EXC-1530","SOUTH VAN NESS AVE","26TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","21296000" "11EXC-1530","SOUTH VAN NESS AVE","26TH ST","CESAR CHAVEZ ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","12033000" "11EXC-1530","WAYLAND ST","SAN BRUNO AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","33272000" "11EXC-1530","WOOLSEY ST","SAN BRUNO AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)","2011-04-07 14:18:07","APPROVED","33273000" "11EXC-1907","COLON AVE","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Intersection Of Monterey & Colon","2011-05-12 16:14:41","ACTIVE","22646000" "11EXC-1907","MONTEREY BLVD","COLON AVE","","Excavation","Pacific Gas & Electric","Intersection Of Monterey & Colon","2011-05-12 16:14:41","ACTIVE","22646000" "11EXC-1908","MONTEREY BLVD","VALDEZ AVE","","Excavation","Pacific Gas & Electric","Intersection Of Monterey & Valdez","2011-05-13 10:58:03","ACTIVE","22645000" "11EXC-1908","VALDEZ AVE","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Intersection Of Monterey & Valdez","2011-05-13 10:58:03","ACTIVE","22645000" "11EXC-2027","CLEMENT ST","25TH AVE","26TH AVE","Excavation","San Francisco Water Department","2438 CLEMENT","2011-05-26 07:51:06","APPROVED","4175000" "11EXC-2082","BUCHANAN ST","BAY ST","NORTH POINT ST","Excavation","Pacific Gas & Electric","BUCHANAN AND NORTH POINT","2011-06-07 11:49:08","ACTIVE","3356000" "11EXC-2082","BUCHANAN ST","NORTH POINT ST","","Excavation","Pacific Gas & Electric","BUCHANAN AND NORTH POINT","2011-06-07 11:49:08","ACTIVE","26756000" "11EXC-2082","NORTH POINT ST","BUCHANAN ST","","Excavation","Pacific Gas & Electric","BUCHANAN AND NORTH POINT","2011-06-07 11:49:08","ACTIVE","26756000" "11EXC-2087","14TH ST","CHURCH ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25882000" "11EXC-2087","BELCHER ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25892000" "11EXC-2087","BELCHER ST","DUBOCE AVE","14TH ST \ BOYNTON CT","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","2883000" "11EXC-2087","CHURCH ST","14TH ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25882000" "11EXC-2087","CHURCH ST","14TH ST","MARKET ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4009000" "11EXC-2087","CHURCH ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25884000" "11EXC-2087","CHURCH ST","DUBOCE AVE","RESERVOIR ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4007000" "11EXC-2087","CHURCH ST","HERMANN ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25888000" "11EXC-2087","CHURCH ST","HERMANN ST","DUBOCE AVE","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4006000" "11EXC-2087","CHURCH ST","MARKET ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25881000" "11EXC-2087","CHURCH ST","RESERVOIR ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25876000" "11EXC-2087","CHURCH ST","RESERVOIR ST","14TH ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4008000" "11EXC-2087","DUBOCE AVE","BELCHER ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25892000" "11EXC-2087","DUBOCE AVE","BELCHER ST","SANCHEZ ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4987000" "11EXC-2087","DUBOCE AVE","BUCHANAN ST \ MARKET ST","CHURCH ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4984000" "11EXC-2087","DUBOCE AVE","CHURCH ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25884000" "11EXC-2087","DUBOCE AVE","CHURCH ST","FILLMORE ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4985000" "11EXC-2087","DUBOCE AVE","FILLMORE ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25893000" "11EXC-2087","DUBOCE AVE","FILLMORE ST","BELCHER ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4986000" "11EXC-2087","DUBOCE AVE","NOE ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25984000" "11EXC-2087","DUBOCE AVE","NOE ST","SCOTT ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4991000" "11EXC-2087","DUBOCE AVE","SANCHEZ ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25986000" "11EXC-2087","DUBOCE AVE","SANCHEZ ST","STEINER ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4988000" "11EXC-2087","DUBOCE AVE","STEINER ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25987000" "11EXC-2087","DUBOCE AVE","STEINER ST","WALTER ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4989000" "11EXC-2087","DUBOCE AVE","WALTER ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25985000" "11EXC-2087","DUBOCE AVE","WALTER ST","NOE ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","4990000" "11EXC-2087","FILLMORE ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25893000" "11EXC-2087","HERMANN ST","CHURCH ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25888000" "11EXC-2087","MARKET ST","CHURCH ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25881000" "11EXC-2087","NOE ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25984000" "11EXC-2087","RESERVOIR ST","CHURCH ST","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25876000" "11EXC-2087","SANCHEZ ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25986000" "11EXC-2087","SANCHEZ ST","DUBOCE AVE","14TH ST","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","11507000" "11EXC-2087","STEINER ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25987000" "11EXC-2087","WALTER ST","DUBOCE AVE","","Excavation","NTK Construction, Inc","Church and Duboce Track Improvement Project (SFMTA Contract No. 1239)","2011-06-21 13:35:40","APPROVED","25985000" "11EXC-2103","05TH ST","JESSIE ST","MISSION ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","292000" "11EXC-2103","05TH ST","NATOMA ST","HOWARD ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","295000" "11EXC-2103","MASON ST","DERBY ST","POST ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8805000" "11EXC-2103","MASON ST","EDDY ST","ELLIS ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8800000" "11EXC-2103","MASON ST","ELLIS ST","OFARRELL ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8801000" "11EXC-2103","MASON ST","ELWOOD ST","GEARY ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8803000" "11EXC-2103","MASON ST","GEARY ST","DERBY ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8804000" "11EXC-2103","MASON ST","OFARRELL ST","ELWOOD ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8802000" "11EXC-2103","MASON ST","POST ST","SUTTER ST","Excavation","Synergy Project Management","SFMTA Central Subway #1251 Union Square and Market Utilities Overhead Electrci Pole Foundations (Various Locations # 1)","2011-05-27 13:07:13","ACTIVE","8806000" "11EXC-2139","CLAY ST","LEIDESDORFF ST","MONTGOMERY ST","Excavation","SBC - Pacific Bell Engineering","8320756 559 CLAY","","ACTIVE","4085000" "11EXC-2140","BAXTER ALY","CASITAS AVE \ CRESTA VISTA DR","","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","32989000" "11EXC-2140","CASITAS AVE","BAXTER ALY \ CRESTA VISTA DR","","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","32989000" "11EXC-2140","CASITAS AVE","BAXTER ALY \ CRESTA VISTA DR","HAZELWOOD AVE \ YERBA BUENA AVE","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","3766000" "11EXC-2140","CASITAS AVE","HAZELWOOD AVE \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","22810000" "11EXC-2140","CRESTA VISTA DR","BAXTER ALY \ CASITAS AVE","","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","32989000" "11EXC-2140","CRESTA VISTA DR","BAXTER ALY \ CASITAS AVE","GLOBE ALY","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","4508000" "11EXC-2140","HAZELWOOD AVE","CASITAS AVE \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","22810000" "11EXC-2140","HAZELWOOD AVE","GLOBE ALY \ LOS PALMOS DR","CASITAS AVE \ YERBA BUENA AVE","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","6845000" "11EXC-2140","YERBA BUENA AVE","CASITAS AVE \ HAZELWOOD AVE","","Excavation","Pacific Gas & Electric","Casitas and Cresta Vista GPRP Project","2011-06-08 15:04:28","ACTIVE","22810000" "11EXC-2170","CORTLAND AVE","PRENTISS ST","NEVADA ST","Excavation","San Francisco Water Department","219 Prentiss On Cortland east of Prentiss. See 11exc-1129","2011-05-23 13:38:42","ACTIVE","4433000" "11EXC-2177","DICHIERA CT","ELLINGTON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21520000" "11EXC-2177","DICHIERA CT","END","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","51098000" "11EXC-2177","DICHIERA CT","END","ELLINGTON AVE","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","4789000" "11EXC-2177","ELLINGTON AVE","DICHIERA CT","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21520000" "11EXC-2177","ELLINGTON AVE","DICHIERA CT","NAGLEE AVE","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","5162000" "11EXC-2177","ELLINGTON AVE","FOOTE AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21511000" "11EXC-2177","ELLINGTON AVE","FOOTE AVE","DICHIERA CT","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","5161000" "11EXC-2177","ELLINGTON AVE","OTTAWA AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21509000" "11EXC-2177","ELLINGTON AVE","OTTAWA AVE","SALA TER","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","5159000" "11EXC-2177","ELLINGTON AVE","SALA TER","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21519000" "11EXC-2177","ELLINGTON AVE","SALA TER","FOOTE AVE","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","5160000" "11EXC-2177","FOOTE AVE","ELLINGTON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21511000" "11EXC-2177","FOOTE AVE","ELLINGTON AVE","HURON AVE","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","5725000" "11EXC-2177","FOOTE AVE","HURON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21525000" "11EXC-2177","FOOTE AVE","MISSION ST","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21505000" "11EXC-2177","FOOTE AVE","MISSION ST","ELLINGTON AVE","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","5724000" "11EXC-2177","HURON AVE","FOOTE AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21525000" "11EXC-2177","LOWELL ST","MISSION ST","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21502000" "11EXC-2177","MISSION ST","FOOTE AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21505000" "11EXC-2177","MISSION ST","LOWELL ST","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21502000" "11EXC-2177","MISSION ST","MORSE ST \ WHITTIER ST","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21541000" "11EXC-2177","MISSION ST","OTTAWA AVE","FLORENTINE AVE","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","9185000" "11EXC-2177","MISSION ST","WHIPPLE AVE","MORSE ST \ WHITTIER ST","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","9191000" "11EXC-2177","MORSE ST","MISSION ST \ WHITTIER ST","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21541000" "11EXC-2177","OTTAWA AVE","ELLINGTON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21509000" "11EXC-2177","SALA TER","ELLINGTON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21519000" "11EXC-2177","WHITTIER ST","MISSION ST \ MORSE ST","","Excavation","Pacific Gas & Electric","Outer Mission 2 GPRP Project","2011-05-26 14:11:49","ACTIVE","21541000" "11EXC-2221","PACIFIC AVE","POLK ST","VAN NESS AVE","Excavation","Pacific Gas & Electric","1648 PACIFIC AVE.","2011-08-08 13:29:57","ACTIVE","10147000" "11EXC-2314","06TH ST","GOLDEN GATE AVE \ MARKET ST \ TAYLOR ST","","Excavation","SBC - Pacific Bell Engineering","pothole","2011-07-01 15:16:38","ACTIVE","24922000" "11EXC-2314","GOLDEN GATE AVE","06TH ST \ MARKET ST \ TAYLOR ST","","Excavation","SBC - Pacific Bell Engineering","pothole","2011-07-01 15:16:38","ACTIVE","24922000" "11EXC-2314","MARKET ST","06TH ST \ GOLDEN GATE AVE \ TAYLOR ST","","Excavation","SBC - Pacific Bell Engineering","pothole","2011-07-01 15:16:38","ACTIVE","24922000" "11EXC-2314","TAYLOR ST","06TH ST \ GOLDEN GATE AVE \ MARKET ST","","Excavation","SBC - Pacific Bell Engineering","pothole","2011-07-01 15:16:38","ACTIVE","24922000" "11EXC-2317","TOWNSEND ST","STANFORD ST","CLARENCE PL","Excavation","Cable Com of California Inc","153 TOWNSEND ST","2011-06-10 12:25:29","ACTIVE","12657000" "11EXC-2382","JEROME ALY","PACIFIC AVE","","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","24767000" "11EXC-2382","MONTGOMERY ST","PACIFIC AVE","","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","24762000" "11EXC-2382","PACIFIC AVE","JEROME ALY","","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","24767000" "11EXC-2382","PACIFIC AVE","JEROME ALY","KEARNY ST","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","10123000" "11EXC-2382","PACIFIC AVE","MONTGOMERY ST","","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","24762000" "11EXC-2382","PACIFIC AVE","MONTGOMERY ST","JEROME ALY","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","10122000" "11EXC-2382","PACIFIC AVE","OSGOOD PL","MONTGOMERY ST","Excavation","Cable Com of California Inc","564 PACIFIC AVE","2011-06-24 19:54:26","ACTIVE","10121000" "11EXC-2391","HARNEY WAY","ALANA WAY \ THOMAS MELLON CIR","END","Excavation","Super Excavators, Inc.","Sunnydale Auxiliary Sewer Project (Ground Improvement work on Harney Way) (SFPUC Contract No. WW-487)","2011-06-06 08:43:22","ACTIVE","6692000" "11EXC-2480","HAZELWOOD AVE","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Intersection Of Hazelwood & Monterey","2011-06-27 15:17:15","ACTIVE","22258000" "11EXC-2480","MONTEREY BLVD","HAZELWOOD AVE","","Excavation","Pacific Gas & Electric","Intersection Of Hazelwood & Monterey","2011-06-27 15:17:15","ACTIVE","22258000" "11EXC-2538","JONES ST","GOLDEN GATE AVE","TURK ST","Excavation","ABOVE NET COMMUNICATIONS, INC.","536 Leavenworth Street SF Connection","2011-06-15 15:59:43","ACTIVE","7564000" "11EXC-2549","ASH ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","24473000" "11EXC-2549","AUSTIN ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26506000" "11EXC-2549","BUSH ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26504000" "11EXC-2549","EDDY ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26490000" "11EXC-2549","ELLIS ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26492000" "11EXC-2549","ELM ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25943000" "11EXC-2549","FELL ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25916000" "11EXC-2549","FERN ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26503000" "11EXC-2549","FULTON ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25940000" "11EXC-2549","GEARY BLVD","GOUGH ST \ PETER YORKE WAY \ STARR KING WAY","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26494000" "11EXC-2549","GOLDEN GATE AVE","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25942000" "11EXC-2549","GOUGH ST","ASH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","24473000" "11EXC-2549","GOUGH ST","ASH ST","MCALLISTER ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6323000" "11EXC-2549","GOUGH ST","AUSTIN ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26506000" "11EXC-2549","GOUGH ST","AUSTIN ST","PINE ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6336000" "11EXC-2549","GOUGH ST","BUSH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26504000" "11EXC-2549","GOUGH ST","BUSH ST","AUSTIN ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6335000" "11EXC-2549","GOUGH ST","EDDY ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26490000" "11EXC-2549","GOUGH ST","EDDY ST","ELLIS ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6328001" "11EXC-2549","GOUGH ST","ELLIS ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26492000" "11EXC-2549","GOUGH ST","ELLIS ST","GEARY BLVD \ PETER YORKE WAY \ STARR KING WAY","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6330000" "11EXC-2549","GOUGH ST","ELM ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25943000" "11EXC-2549","GOUGH ST","ELM ST","TURK ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6326000" "11EXC-2549","GOUGH ST","FELL ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25916000" "11EXC-2549","GOUGH ST","FELL ST","LINDEN ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6317000" "11EXC-2549","GOUGH ST","FERN ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26503000" "11EXC-2549","GOUGH ST","FERN ST","BUSH ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6334000" "11EXC-2549","GOUGH ST","FULTON ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25940000" "11EXC-2549","GOUGH ST","FULTON ST","ASH ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6322000" "11EXC-2549","GOUGH ST","GEARY BLVD \ PETER YORKE WAY \ STARR KING WAY","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26494000" "11EXC-2549","GOUGH ST","GEARY BLVD \ PETER YORKE WAY \ STARR KING WAY","POST ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6331000" "11EXC-2549","GOUGH ST","GOLDEN GATE AVE","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25942000" "11EXC-2549","GOUGH ST","GOLDEN GATE AVE","ELM ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6325000" "11EXC-2549","GOUGH ST","GROVE ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25939000" "11EXC-2549","GOUGH ST","GROVE ST","FULTON ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6321000" "11EXC-2549","GOUGH ST","HAYES ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25918000" "11EXC-2549","GOUGH ST","HAYES ST","IVY ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6319000" "11EXC-2549","GOUGH ST","HICKORY ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25915000" "11EXC-2549","GOUGH ST","HICKORY ST","FELL ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6316000" "11EXC-2549","GOUGH ST","IVY ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25919000" "11EXC-2549","GOUGH ST","IVY ST","GROVE ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6320000" "11EXC-2549","GOUGH ST","LILY ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25905000" "11EXC-2549","GOUGH ST","LILY ST","OAK ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6314000" "11EXC-2549","GOUGH ST","LINDEN ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25917000" "11EXC-2549","GOUGH ST","LINDEN ST","HAYES ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6318000" "11EXC-2549","GOUGH ST","MCALLISTER ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25941000" "11EXC-2549","GOUGH ST","MCALLISTER ST","GOLDEN GATE AVE","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6324000" "11EXC-2549","GOUGH ST","OAK ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25906000" "11EXC-2549","GOUGH ST","OAK ST","HICKORY ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6315000" "11EXC-2549","GOUGH ST","PAGE ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","24456000" "11EXC-2549","GOUGH ST","PAGE ST","LILY ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6313000" "11EXC-2549","GOUGH ST","PINE ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26507000" "11EXC-2549","GOUGH ST","PINE ST","CALIFORNIA ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6337000" "11EXC-2549","GOUGH ST","POST ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26501000" "11EXC-2549","GOUGH ST","POST ST","SUTTER ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6332000" "11EXC-2549","GOUGH ST","ROSE ST","PAGE ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6312000" "11EXC-2549","GOUGH ST","SUTTER ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26502000" "11EXC-2549","GOUGH ST","SUTTER ST","FERN ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6333000" "11EXC-2549","GOUGH ST","TURK ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25963000" "11EXC-2549","GOUGH ST","TURK ST","EDDY ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","6327000" "11EXC-2549","GROVE ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25939000" "11EXC-2549","HAYES ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25918000" "11EXC-2549","HICKORY ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25915000" "11EXC-2549","IVY ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25919000" "11EXC-2549","LILY ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25905000" "11EXC-2549","LINDEN ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25917000" "11EXC-2549","MCALLISTER ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25941000" "11EXC-2549","OAK ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25906000" "11EXC-2549","PAGE ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","24456000" "11EXC-2549","PETER YORKE WAY","GEARY BLVD \ GOUGH ST \ STARR KING WAY","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26494000" "11EXC-2549","PINE ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26507000" "11EXC-2549","POST ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26501000" "11EXC-2549","STARR KING WAY","GEARY BLVD \ GOUGH ST \ PETER YORKE WAY","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26494000" "11EXC-2549","SUTTER ST","FRANKLIN ST","GOUGH ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","12332000" "11EXC-2549","SUTTER ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","26502000" "11EXC-2549","SUTTER ST","GOUGH ST","OCTAVIA ST","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","12333000" "11EXC-2549","TURK ST","GOUGH ST","","Excavation","Bay Area Lightworks","Van Ness Corridor Project - Gough Street (Contract No. 1685J)","2011-07-25 11:14:59","ACTIVE","25963000" "11EXC-2550","WASHINGTON ST","TAYLOR ST","JONES ST","Excavation","SBC - Pacific Bell Engineering","new conduit and sub box installation","2011-08-15 14:46:21","ACTIVE","13425000" "11EXC-2593","02ND ST","DOW PL","","Excavation","ABOVE NET COMMUNICATIONS, INC.","Customer lateral into 600 Harrison Street","2011-06-21 10:30:31","ACTIVE","24511000" "11EXC-2593","02ND ST","FOLSOM ST","DOW PL","Excavation","ABOVE NET COMMUNICATIONS, INC.","Customer lateral into 600 Harrison Street","2011-06-21 10:30:31","ACTIVE","138000" "11EXC-2593","DOW PL","02ND ST","","Excavation","ABOVE NET COMMUNICATIONS, INC.","Customer lateral into 600 Harrison Street","2011-06-21 10:30:31","ACTIVE","24511000" "11EXC-2595","POWELL ST","UNION ST","COLUMBUS AVE","Excavation","Cable Com of California Inc","1717 POWELL ST","2011-08-04 10:44:49","ACTIVE","10696000" "11EXC-2658","STEINER ST","LOMBARD ST","CHESTNUT ST","Excavation","Cable Com of California Inc","2109 CHESTNUT","2011-06-30 09:35:40","ACTIVE","12156000" "11EXC-2723","MARY ST","MINNA ST","","Excavation","Cable Com of California Inc","901 MISSION ST","2011-08-10 09:54:34","ACTIVE","24284000" "11EXC-2723","MINNA ST","05TH ST","MARY ST","Excavation","Cable Com of California Inc","901 MISSION ST","2011-08-10 09:54:34","ACTIVE","9043000" "11EXC-2723","MINNA ST","MARY ST","","Excavation","Cable Com of California Inc","901 MISSION ST","2011-08-10 09:54:34","ACTIVE","24284000" "11EXC-2723","MINNA ST","MARY ST","06TH ST","Excavation","Cable Com of California Inc","901 MISSION ST","2011-08-10 09:54:34","ACTIVE","9044000" "11EXC-2816","KEARNY ST","POST ST","","Excavation","Pacific Gas & Electric","KEARNY AND POST STREETS, SF","2011-07-12 10:26:51","ACTIVE","24644000" "11EXC-2816","POST ST","KEARNY ST","","Excavation","Pacific Gas & Electric","KEARNY AND POST STREETS, SF","2011-07-12 10:26:51","ACTIVE","24644000" "11EXC-2816","POST ST","LICK PL","KEARNY ST","Excavation","Pacific Gas & Electric","KEARNY AND POST STREETS, SF","2011-07-12 10:26:51","ACTIVE","10624002" "11EXC-2840","DEL MONTE ST","END","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","51101000" "11EXC-2840","DEL MONTE ST","END","MOUNT VERNON AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","4669000" "11EXC-2840","DEL MONTE ST","MOUNT VERNON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21512000" "11EXC-2840","DEL MONTE ST","MOUNT VERNON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21516000" "11EXC-2840","DEL MONTE ST","MOUNT VERNON AVE","OTTAWA AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","4670000" "11EXC-2840","DEL MONTE ST","OTTAWA AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21515000" "11EXC-2840","ELLINGTON AVE","END","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","51102000" "11EXC-2840","ELLINGTON AVE","END","MOUNT VERNON AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","5157000" "11EXC-2840","ELLINGTON AVE","MOUNT VERNON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21513000" "11EXC-2840","ELLINGTON AVE","MOUNT VERNON AVE","OTTAWA AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","5158000" "11EXC-2840","ELLINGTON AVE","OTTAWA AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21509000" "11EXC-2840","ELLINGTON AVE","OTTAWA AVE","SALA TER","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","5159000" "11EXC-2840","MISSION ST","CONCORD ST","OTTAWA AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","9184000" "11EXC-2840","MISSION ST","OTTAWA AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21510000" "11EXC-2840","MISSION ST","POPE ST","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21483000" "11EXC-2840","MOUNT VERNON AVE","DEL MONTE ST","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21512000" "11EXC-2840","MOUNT VERNON AVE","DEL MONTE ST","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21516000" "11EXC-2840","MOUNT VERNON AVE","DEL MONTE ST","ALEMANY BLVD","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","9425000" "11EXC-2840","MOUNT VERNON AVE","ELLINGTON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21513000" "11EXC-2840","MOUNT VERNON AVE","ELLINGTON AVE","DEL MONTE ST","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","9423000" "11EXC-2840","MOUNT VERNON AVE","MISSION ST","ELLINGTON AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","9422000" "11EXC-2840","OTTAWA AVE","DEL MONTE ST","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21515000" "11EXC-2840","OTTAWA AVE","DEL MONTE ST","HURON AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","10057000" "11EXC-2840","OTTAWA AVE","ELLINGTON AVE","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21509000" "11EXC-2840","OTTAWA AVE","ELLINGTON AVE","DEL MONTE ST","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","10056000" "11EXC-2840","OTTAWA AVE","MISSION ST","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21510000" "11EXC-2840","OTTAWA AVE","MISSION ST","ELLINGTON AVE","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","10055000" "11EXC-2840","POPE ST","MISSION ST","","Excavation","Pacific Gas & Electric","Outer Mission 3 GPRP Project","2011-11-16 10:08:01","ACTIVE","21483000" "11EXC-2849","ALEMANY BLVD","I-280 N ON RAMP \ REGENT ST \ SAN JOSE AVE","","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","22460000" "11EXC-2849","ALEMANY BLVD","I-280 N ON RAMP \ REGENT ST \ SAN JOSE AVE","CRYSTAL ST \ PALMETTO AVE","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","2179201" "11EXC-2849","CRYSTAL ST","DE LONG ST \ GOETHE ST \ RHINE ST","ALEMANY BLVD \ PALMETTO AVE","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","4542000" "11EXC-2849","DE WOLF ST","LAWRENCE AVE","ALEMANY BLVD","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","4662000" "11EXC-2849","I-280 N ON RAMP","ALEMANY BLVD \ REGENT ST \ SAN JOSE AVE","","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","22460000" "11EXC-2849","REGENT ST","ALEMANY BLVD \ I-280 N ON RAMP \ SAN JOSE AVE","","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","22460000" "11EXC-2849","SAN JOSE AVE","ALEMANY BLVD \ I-280 N ON RAMP \ REGENT ST","","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","22460000" "11EXC-2849","SICKLES AVE","ALEMANY BLVD","PLYMOUTH AVE \ SAN JOSE AVE","Excavation","R & L Brosamer, Inc.","BART Earthquake Safety Program Aerial Structures - M-Line Project (Contract No. 15PA-110)","2011-07-08 09:04:02","ACTIVE","11871000" "11EXC-2925","26TH ST","HARRISON ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21174000" "11EXC-2925","ALABAMA ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21142000" "11EXC-2925","BARTLETT ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21343000" "11EXC-2925","BRYANT ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21135000" "11EXC-2925","CAPP ST","CESAR CHAVEZ ST \ MISSION ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21304000" "11EXC-2925","CESAR CHAVEZ ON RAMP","CESAR CHAVEZ ST \ HAMPSHIRE ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","33287000" "11EXC-2925","CESAR CHAVEZ ON RAMP","HAMPSHIRE ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21120000" "11EXC-2925","CESAR CHAVEZ ST","ALABAMA ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21142000" "11EXC-2925","CESAR CHAVEZ ST","ALABAMA ST","HARRISON ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2484201" "11EXC-2925","CESAR CHAVEZ ST","ANDREW ST \ HWY 101 S OFF RAMP","CESAR CHAVEZ ON RAMP \ HAMPSHIRE ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2479203" "11EXC-2925","CESAR CHAVEZ ST","BARTLETT ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21343000" "11EXC-2925","CESAR CHAVEZ ST","BARTLETT ST","VALENCIA ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2489202" "11EXC-2925","CESAR CHAVEZ ST","BRYANT ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21135000" "11EXC-2925","CESAR CHAVEZ ST","BRYANT ST","FLORIDA ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2482201" "11EXC-2925","CESAR CHAVEZ ST","CAPP ST \ MISSION ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21304000" "11EXC-2925","CESAR CHAVEZ ST","CAPP ST \ MISSION ST","BARTLETT ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2489201" "11EXC-2925","CESAR CHAVEZ ST","CESAR CHAVEZ ON RAMP \ HAMPSHIRE ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","33287000" "11EXC-2925","CESAR CHAVEZ ST","CESAR CHAVEZ ON RAMP \ HAMPSHIRE ST","PRECITA AVE \ YORK ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2480201" "11EXC-2925","CESAR CHAVEZ ST","FLORIDA ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21139000" "11EXC-2925","CESAR CHAVEZ ST","FLORIDA ST","ALABAMA ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2483201" "11EXC-2925","CESAR CHAVEZ ST","FOLSOM ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21177000" "11EXC-2925","CESAR CHAVEZ ST","FOLSOM ST","SHOTWELL ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2486201" "11EXC-2925","CESAR CHAVEZ ST","HARRISON ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21173000" "11EXC-2925","CESAR CHAVEZ ST","HARRISON ST","FOLSOM ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2485201" "11EXC-2925","CESAR CHAVEZ ST","PRECITA AVE \ YORK ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21125000" "11EXC-2925","CESAR CHAVEZ ST","PRECITA AVE \ YORK ST","BRYANT ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2481201" "11EXC-2925","CESAR CHAVEZ ST","SHOTWELL ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21290000" "11EXC-2925","CESAR CHAVEZ ST","SHOTWELL ST","SOUTH VAN NESS AVE","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2487201" "11EXC-2925","CESAR CHAVEZ ST","SOUTH VAN NESS AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","33364000" "11EXC-2925","CESAR CHAVEZ ST","SOUTH VAN NESS AVE","CAPP ST \ MISSION ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2488201" "11EXC-2925","CESAR CHAVEZ ST","VALENCIA ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21345000" "11EXC-2925","CESAR CHAVEZ ST","VALENCIA ST","GUERRERO ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","2490201" "11EXC-2925","COLERIDGE ST","COSO AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21303000" "11EXC-2925","COLERIDGE ST","COSO AVE","POWERS AVE","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","4252000" "11EXC-2925","COLERIDGE ST","FAIR AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21321000" "11EXC-2925","COLERIDGE ST","POWERS AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21334000" "11EXC-2925","COLERIDGE ST","POWERS AVE","FAIR AVE","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","4253000" "11EXC-2925","COSO AVE","COLERIDGE ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21303000" "11EXC-2925","COSO AVE","COLERIDGE ST","MIRABEL AVE","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","4451000" "11EXC-2925","DUNCAN ST","TIFFANY AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21341000" "11EXC-2925","FAIR AVE","COLERIDGE ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21321000" "11EXC-2925","FAIR AVE","MISSION ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21337000" "11EXC-2925","FAIR AVE","MISSION ST","PETERS AVE","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","5376000" "11EXC-2925","FAIR AVE","PETERS AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21335000" "11EXC-2925","FAIR AVE","PETERS AVE","COLERIDGE ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","5377000" "11EXC-2925","FLORIDA ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21139000" "11EXC-2925","FOLSOM ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21177000" "11EXC-2925","FOLSOM ST","KAMILLE CT","CESAR CHAVEZ ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","5701002" "11EXC-2925","HAMPSHIRE ST","CESAR CHAVEZ ON RAMP","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21120000" "11EXC-2925","HAMPSHIRE ST","CESAR CHAVEZ ON RAMP \ CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","33287000" "11EXC-2925","HARRISON ST","26TH ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21174000" "11EXC-2925","HARRISON ST","26TH ST","KAMILLE CT","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","6759001" "11EXC-2925","HARRISON ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21173000" "11EXC-2925","HARRISON ST","KAMILLE CT","CESAR CHAVEZ ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","6759002" "11EXC-2925","MISSION ST","CAPP ST \ CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21304000" "11EXC-2925","MISSION ST","FAIR AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21337000" "11EXC-2925","PETERS AVE","FAIR AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21335000" "11EXC-2925","POWERS AVE","COLERIDGE ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21334000" "11EXC-2925","POWERS AVE","MISSION ST","COLERIDGE ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","10707000" "11EXC-2925","PRECITA AVE","CESAR CHAVEZ ST \ YORK ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21125000" "11EXC-2925","SHOTWELL ST","26TH ST","CESAR CHAVEZ ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","11844000" "11EXC-2925","SHOTWELL ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21290000" "11EXC-2925","SOUTH VAN NESS AVE","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","33364000" "11EXC-2925","TIFFANY AVE","DUNCAN ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21341000" "11EXC-2925","TIFFANY AVE","VALENCIA ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21344000" "11EXC-2925","TIFFANY AVE","VALENCIA ST","DUNCAN ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","12610000" "11EXC-2925","VALENCIA ST","CESAR CHAVEZ ST","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21345000" "11EXC-2925","VALENCIA ST","CESAR CHAVEZ ST","TIFFANY AVE","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","13076000" "11EXC-2925","VALENCIA ST","TIFFANY AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21344000" "11EXC-2925","VALENCIA ST","TIFFANY AVE","MISSION ST","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","13077000" "11EXC-2925","YORK ST","CESAR CHAVEZ ST \ PRECITA AVE","","Excavation","JMB Construction Inc.","Cesar Chavez Street Sewer System Improvement, Phase 1 (San Francisco Water Power Sewer Contract No. WW-410)","2011-07-28 13:56:48","APPROVED","21125000" "11EXC-2954","08TH AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","1864 8TH AVE","2012-01-09 14:02:06","APPROVED","401000" "11EXC-2987","BYXBEE ST","HOLLOWAY AVE","","Excavation","Pacific Gas & Electric","Intersection of BYXBEE & Holloway Cable Replacement","2011-07-27 11:28:52","ACTIVE","22736000" "11EXC-2987","HOLLOWAY AVE","BYXBEE ST","","Excavation","Pacific Gas & Electric","Intersection of BYXBEE & Holloway Cable Replacement","2011-07-27 11:28:52","ACTIVE","22736000" "11EXC-2987","HOLLOWAY AVE","BYXBEE ST","MONTICELLO ST","Excavation","Pacific Gas & Electric","Intersection of BYXBEE & Holloway Cable Replacement","2011-07-27 11:28:52","ACTIVE","6987000" "11EXC-3064","01ST ST","CLEMENTINA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24526000" "11EXC-3064","02ND ST","CLEMENTINA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24535000" "11EXC-3064","02ND ST","NATOMA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24543000" "11EXC-3064","04TH ST","CLEMENTINA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24589000" "11EXC-3064","14TH ST","JULIAN AVE","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24373000" "11EXC-3064","15TH ST","JULIAN AVE","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24182000" "11EXC-3064","16TH ST","JULIAN AVE","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24181000" "11EXC-3064","CLEMENTINA ST","01ST ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24526000" "11EXC-3064","CLEMENTINA ST","01ST ST","ECKER ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","4194000" "11EXC-3064","CLEMENTINA ST","02ND ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24535000" "11EXC-3064","CLEMENTINA ST","04TH ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24589000" "11EXC-3064","CLEMENTINA ST","04TH ST","GALLAGHER LN","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","4198000" "11EXC-3064","CLEMENTINA ST","ECKER ST","OSCAR ALY","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","4195000" "11EXC-3064","CLEMENTINA ST","GALLAGHER LN","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24626000" "11EXC-3064","CLEMENTINA ST","GALLAGHER LN","05TH ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","4199000" "11EXC-3064","CLEMENTINA ST","OSCAR ALY","02ND ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","4196000" "11EXC-3064","GALLAGHER LN","CLEMENTINA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24626000" "11EXC-3064","GALLAGHER LN","TEHAMA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","28147000" "11EXC-3064","HARRISON ST","01ST ST \ I-80 E ON RAMP","ESSEX ST \ I-80 E ON RAMP","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","6712000" "11EXC-3064","HOWARD ST","SPEAR ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24547000" "11EXC-3064","HOWARD ST","SPEAR ST","MAIN ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","7029000" "11EXC-3064","JULIAN AVE","14TH ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24373000" "11EXC-3064","JULIAN AVE","14TH ST","15TH ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","7698000" "11EXC-3064","JULIAN AVE","15TH ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24182000" "11EXC-3064","JULIAN AVE","15TH ST","16TH ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","7699000" "11EXC-3064","JULIAN AVE","16TH ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24181000" "11EXC-3064","NATOMA ST","02ND ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24543000" "11EXC-3064","NATOMA ST","02ND ST","NEW MONTGOMERY ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","9508000" "11EXC-3064","NATOMA ST","NEW MONTGOMERY ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24598000" "11EXC-3064","NATOMA ST","NEW MONTGOMERY ST","END","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","9509000" "11EXC-3064","NEW MONTGOMERY ST","NATOMA ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24598000" "11EXC-3064","SPEAR ST","HOWARD ST","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","24547000" "11EXC-3064","TEHAMA ST","END","GALLAGHER LN","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","12474000" "11EXC-3064","TEHAMA ST","GALLAGHER LN","","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","28147000" "11EXC-3064","TEHAMA ST","GALLAGHER LN","05TH ST","Excavation","A. Ruiz Construction Co.","6" and 8" Ductile Iron Water Main Installation in Howard St., Harrison St., Tehama St.,Natoma St., Clementina St. and Julian Ave. (SFPUC Contract No. WD-2430)","2011-07-21 13:55:28","ACTIVE","12475000" "11EXC-3069","POWELL ST","CHESTNUT ST","FRANCISCO ST","Excavation","Cable Com of California Inc","2159 POWELL ST","2011-08-03 19:33:04","ACTIVE","10701000" "11EXC-3105","PINE ST","LAGUNA ST","BUCHANAN ST","Excavation","Cable Com of California Inc","2012 PINE ST","2011-08-03 19:37:49","ACTIVE","10482000" "11EXC-3127","BAY ST","VAN NESS AVE","","Excavation","Pacific Gas & Electric","Intersection Of Bay & Van Ness","2011-08-16 08:55:03","ACTIVE","26705000" "11EXC-3127","VAN NESS AVE","BAY ST","","Excavation","Pacific Gas & Electric","Intersection Of Bay & Van Ness","2011-08-16 08:55:03","ACTIVE","26705000" "11EXC-3143","01ST ST","NATOMA ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","24534000" "11EXC-3143","FREMONT ST","HOWARD ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","24527000" "11EXC-3143","FREMONT ST","NATOMA ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","24533000" "11EXC-3143","FREMONT ST","NATOMA ST","HOWARD ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","5862000" "11EXC-3143","HOWARD ST","FREMONT ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","24527000" "11EXC-3143","NATOMA ST","01ST ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","24534000" "11EXC-3143","NATOMA ST","FREMONT ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","24533000" "11EXC-3143","NATOMA ST","FREMONT ST","01ST ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.1/ Contract No. 301000401)","2011-07-27 13:59:47","ACTIVE","9506000" "11EXC-3164","IRVING ST","17TH AVE","18TH AVE","Excavation","San Francisco Water Department","1621-1623 Irving - FIRE - EXTENDSION OF ORIGINAL PERMIT 11EXC-2277","2011-07-29 08:15:06","ACTIVE","7294000" "11EXC-3167","ANZA ST","COLLINS ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26467000" "11EXC-3167","ANZA ST","JEAN WAY","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","33556000" "11EXC-3167","ANZA ST","JEAN WAY","COLLINS ST","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","2307000" "11EXC-3167","ANZA ST","MASONIC AVE \ OFARRELL ST","WOOD ST","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","2305000" "11EXC-3167","ANZA ST","WOOD ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26463000" "11EXC-3167","ANZA ST","WOOD ST","JEAN WAY","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","2306000" "11EXC-3167","BAKER ST","PINAR LN","TERRA VISTA AVE","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","2615000" "11EXC-3167","COLLINS ST","ANZA ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26467000" "11EXC-3167","COLLINS ST","GEARY BLVD","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26908000" "11EXC-3167","COLLINS ST","GEARY BLVD","ANZA ST","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","4276000" "11EXC-3167","DICHA ALY","WOOD ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26903000" "11EXC-3167","GEARY BLVD","COLLINS ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26908000" "11EXC-3167","GEARY BLVD","EMERSON ST","WOOD ST","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","6047202" "11EXC-3167","GEARY BLVD","WOOD ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26905000" "11EXC-3167","GEARY BLVD","WOOD ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26907000" "11EXC-3167","GEARY BLVD","WOOD ST","COLLINS ST","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","6047102" "11EXC-3167","JEAN WAY","ANZA ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","33556000" "11EXC-3167","JEAN WAY","ANZA ST","EWING TER","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","7454000" "11EXC-3167","WOOD ST","ANZA ST","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26463000" "11EXC-3167","WOOD ST","DICHA ALY","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26903000" "11EXC-3167","WOOD ST","DICHA ALY","GEARY BLVD","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","13705000" "11EXC-3167","WOOD ST","GEARY BLVD","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26905000" "11EXC-3167","WOOD ST","GEARY BLVD","","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","26907000" "11EXC-3167","WOOD ST","GEARY BLVD","ANZA ST","Excavation","Pacific Gas & Electric","Wood GPRP Project","2011-09-20 08:50:01","ACTIVE","13706000" "11EXC-3288","JOSIAH AVE","LAKEVIEW AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","22195000" "11EXC-3288","LAKEVIEW AVE","JOSIAH AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","22195000" "11EXC-3288","LAKEVIEW AVE","MAJESTIC AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","21600000" "11EXC-3288","LAKEVIEW AVE","MARGARET AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","22196000" "11EXC-3288","MAJESTIC AVE","LAKEVIEW AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","21600000" "11EXC-3288","MAJESTIC AVE","LAKEVIEW AVE","SUMMIT ST","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","8633000" "11EXC-3288","MAJESTIC AVE","SUMMIT ST","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","33460000" "11EXC-3288","MARGARET AVE","LAKEVIEW AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","22196000" "11EXC-3288","SUMMIT ST","MAJESTIC AVE","","Excavation","Pacific Gas & Electric","CAPITOL #3 GPRP Project","2011-08-11 08:26:56","ACTIVE","33460000" "11EXC-3326","VALENCIA ST","18TH ST","19TH ST","Excavation","Pacific Gas & Electric","740 VALENCIA ST","2011-10-20 13:01:57","APPROVED","13064000" "11EXC-3352","LAWRENCE AVE","SADOWA ST \ SAN JOSE AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","21597000" "11EXC-3352","PLYMOUTH AVE","SAGAMORE ST","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","22457000" "11EXC-3352","PLYMOUTH AVE","SAN JOSE AVE \ SICKLES AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","22456000" "11EXC-3352","PLYMOUTH AVE","SAN JOSE AVE \ SICKLES AVE","SAGAMORE ST","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","10511000" "11EXC-3352","SADOWA ST","LAWRENCE AVE \ SAN JOSE AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","21597000" "11EXC-3352","SAGAMORE ST","PLYMOUTH AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","22457000" "11EXC-3352","SAGAMORE ST","SAN JOSE AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","33722000" "11EXC-3352","SAN JOSE AVE","LAWRENCE AVE \ SADOWA ST","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","21597000" "11EXC-3352","SAN JOSE AVE","LAWRENCE AVE \ SADOWA ST","I-280 S OFF RAMP","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","11467202" "11EXC-3352","SAN JOSE AVE","PLYMOUTH AVE \ SICKLES AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","22456000" "11EXC-3352","SAN JOSE AVE","PLYMOUTH AVE \ SICKLES AVE","ALEMANY BLVD \ I-280 N ON RAMP \ REGENT ST","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","11468201" "11EXC-3352","SAN JOSE AVE","SAGAMORE ST","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","33722000" "11EXC-3352","SICKLES AVE","ALEMANY BLVD","PLYMOUTH AVE \ SAN JOSE AVE","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","11871000" "11EXC-3352","SICKLES AVE","PLYMOUTH AVE \ SAN JOSE AVE","","Excavation","Pacific Gas & Electric","Oceanview GPRP Project","2011-08-22 16:19:41","ACTIVE","22456000" "11EXC-3359","TURK ST","HYDE ST","DODGE ST","Excavation","Pacific Gas & Electric","467 TURK ST","2011-10-13 15:53:00","ACTIVE","12720000" "11EXC-3480","ELLIS ST","MASON ST","TAYLOR ST","Excavation","SBC - Pacific Bell Engineering","Pothole to repair collapsed ducts","2011-09-01 11:12:55","ACTIVE","5172000" "11EXC-3480","ELLIS ST","TAYLOR ST","","Excavation","SBC - Pacific Bell Engineering","Pothole to repair collapsed ducts","2011-09-01 11:12:55","ACTIVE","24926000" "11EXC-3480","TAYLOR ST","ELLIS ST","","Excavation","SBC - Pacific Bell Engineering","Pothole to repair collapsed ducts","2011-09-01 11:12:55","ACTIVE","24926000" "11EXC-3521","CORA ST","SUNNYDALE AVE \ TOMASO CT","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20353000" "11EXC-3521","DELTA ST","VISITACION AVE","MELRA CT \ SUNNYDALE AVE","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","4710000" "11EXC-3521","PEABODY ST","SUNNYDALE AVE","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20341000" "11EXC-3521","PEABODY ST","VISITACION AVE","SUNNYDALE AVE","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","10318000" "11EXC-3521","RUTLAND ST","SUNNYDALE AVE","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20352000" "11EXC-3521","SUNNYDALE AVE","CORA ST \ TOMASO CT","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20353000" "11EXC-3521","SUNNYDALE AVE","PEABODY ST","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20341000" "11EXC-3521","SUNNYDALE AVE","PEABODY ST","RUTLAND ST","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","12259000" "11EXC-3521","SUNNYDALE AVE","RUTLAND ST","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20352000" "11EXC-3521","SUNNYDALE AVE","RUTLAND ST","CORA ST \ TOMASO CT","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","12260000" "11EXC-3521","TOMASO CT","CORA ST \ SUNNYDALE AVE","","Excavation","Cal State Constructors, Inc.","Crystal Springs Pipeline No. 1 and Crystal Springs Pipeline No. 2 Crossover (WD-2632) (Job Order Contract No. JOC-28-03)","2011-09-09 14:32:51","ACTIVE","20353000" "11EXC-3627","01ST ST","ELIM ALY","MISSION ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","103000" "11EXC-3627","01ST ST","HOWARD ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24532000" "11EXC-3627","01ST ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24563000" "11EXC-3627","02ND ST","JESSIE ST","MISSION ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","131000" "11EXC-3627","02ND ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24597000" "11EXC-3627","ANTHONY ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24603000" "11EXC-3627","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","MISSION ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","2863000" "11EXC-3627","BEALE ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24554000" "11EXC-3627","ECKER ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24544000" "11EXC-3627","FREMONT ST","FRONT ST \ MARKET ST","MISSION ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","5860000" "11EXC-3627","FREMONT ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24560000" "11EXC-3627","HOWARD ST","01ST ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24532000" "11EXC-3627","MAIN ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24557000" "11EXC-3627","MARKET ST","SUTTER ST","02ND ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","8742203" "11EXC-3627","MISSION ST","01ST ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24563000" "11EXC-3627","MISSION ST","01ST ST","ECKER ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9088000" "11EXC-3627","MISSION ST","02ND ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24597000" "11EXC-3627","MISSION ST","ANTHONY ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24603000" "11EXC-3627","MISSION ST","ANTHONY ST","02ND ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9091000" "11EXC-3627","MISSION ST","BEALE ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24554000" "11EXC-3627","MISSION ST","BEALE ST","FREMONT ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9086000" "11EXC-3627","MISSION ST","ECKER ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24544000" "11EXC-3627","MISSION ST","ECKER ST","SHAW ALY","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9089000" "11EXC-3627","MISSION ST","FREMONT ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24560000" "11EXC-3627","MISSION ST","FREMONT ST","01ST ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9087000" "11EXC-3627","MISSION ST","MAIN ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24557000" "11EXC-3627","MISSION ST","MAIN ST","BEALE ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9085000" "11EXC-3627","MISSION ST","SHAW ALY","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24602000" "11EXC-3627","MISSION ST","SHAW ALY","ANTHONY ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","9090000" "11EXC-3627","SHAW ALY","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 1490J Transbay Transit Center (TG04.2 AWSS)","2011-09-21 09:50:06","ACTIVE","24602000" "11EXC-3662","TARAVAL ST","17TH AVE","18TH AVE","Excavation","San Francisco Water Department","745 TARAVAL, RICHARD KING MUNI INSPECTOR HAS BEEN NOTIFIED","2011-09-06 14:09:31","ACTIVE","12393000" "11EXC-3681","WATERVILLE ST","CONKLING ST","AUGUSTA ST","Excavation","San Francisco Water Department","55 Waterville PLEASE EXTEND ORIGINAL PERMIT 11EXC-2983","2011-09-07 14:52:14","ACTIVE","13458000" "11EXC-3717","BEALE ST","HOWARD ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24506000" "11EXC-3717","BEALE ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24554000" "11EXC-3717","BEALE ST","MISSION ST","HOWARD ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","2864000" "11EXC-3717","HOWARD ST","BEALE ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24506000" "11EXC-3717","HOWARD ST","MAIN ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24504000" "11EXC-3717","HOWARD ST","MAIN ST","BEALE ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","7030000" "11EXC-3717","MAIN ST","HOWARD ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24504000" "11EXC-3717","MAIN ST","MISSION ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24557000" "11EXC-3717","MAIN ST","MISSION ST","HOWARD ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","8628000" "11EXC-3717","MISSION ST","BEALE ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24554000" "11EXC-3717","MISSION ST","MAIN ST","","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","24557000" "11EXC-3717","MISSION ST","MAIN ST","BEALE ST","Excavation","M Squared Construction, Inc.","Transbay Joint Powers Authority Contract No. 08-04-CMGC-000 Transbay Transit Center Program Relocation of Utilities Project (Subject: TG04.6/ Contract No. 301000406)","2011-09-09 13:06:57","ACTIVE","9085000" "11EXC-3726","BEALE ST","MISSION ST","","Excavation","Pacific Gas & Electric","Transbay Project Work-Beale St.(Mission to Howard Sts.) ","2012-01-04 09:07:21","ACTIVE","24554000" "11EXC-3726","BEALE ST","MISSION ST","HOWARD ST","Excavation","Pacific Gas & Electric","Transbay Project Work-Beale St.(Mission to Howard Sts.) ","2012-01-04 09:07:21","ACTIVE","2864000" "11EXC-3726","MISSION ST","BEALE ST","","Excavation","Pacific Gas & Electric","Transbay Project Work-Beale St.(Mission to Howard Sts.) ","2012-01-04 09:07:21","ACTIVE","24554000" "11EXC-3808","EDDY ST","POLK ST","VAN NESS AVE","Excavation","Pacific Gas & Electric","IFO 750 EDDY","2011-09-19 14:35:16","ACTIVE","5065000" "11EXC-3843","AUBURN ST","JACKSON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25107000" "11EXC-3843","AUBURN ST","JACKSON ST","PACIFIC AVE","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","2545000" "11EXC-3843","AUBURN ST","PACIFIC AVE","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25124000" "11EXC-3843","BERNARD ST","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25129000" "11EXC-3843","BROADWAY","HIMMELMANN PL","TAYLOR ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","3160000" "11EXC-3843","BROADWAY","POWELL ST \ ROBERT C LEVY TUNL","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25111000" "11EXC-3843","BROADWAY","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25118000" "11EXC-3843","CLAY ST","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25095000" "11EXC-3843","DERBY ST","MASON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24916000" "11EXC-3843","FALLON PL","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25134000" "11EXC-3843","GEARY ST","MASON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24917000" "11EXC-3843","JACKSON ST","AUBURN ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25107000" "11EXC-3843","JACKSON ST","POWELL ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25049000" "11EXC-3843","JACKSON ST","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25121000" "11EXC-3843","JOHN ST","POWELL ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25062000" "11EXC-3843","MASON ST","DERBY ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24916000" "11EXC-3843","MASON ST","DERBY ST","POST ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","8805000" "11EXC-3843","MASON ST","GEARY ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24917000" "11EXC-3843","MASON ST","GEARY ST","DERBY ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","8804000" "11EXC-3843","MASON ST","POST ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24919000" "11EXC-3843","MASON ST","POST ST","SUTTER ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","8806000" "11EXC-3843","MASON ST","SUTTER ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24920000" "11EXC-3843","PACIFIC AVE","AUBURN ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25124000" "11EXC-3843","PACIFIC AVE","HIMMELMANN PL","TAYLOR ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10138000" "11EXC-3843","PACIFIC AVE","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25130000" "11EXC-3843","PACIFIC AVE","TAYLOR ST","PHOENIX TER","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10139000" "11EXC-3843","POST ST","MASON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24919000" "11EXC-3843","POST ST","MASON ST","TAYLOR ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10630000" "11EXC-3843","POST ST","POWELL ST","MASON ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10629000" "11EXC-3843","POWELL ST","BROADWAY \ ROBERT C LEVY TUNL","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25111000" "11EXC-3843","POWELL ST","BROADWAY \ ROBERT C LEVY TUNL","VALLEJO ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10693000" "11EXC-3843","POWELL ST","JACKSON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25049000" "11EXC-3843","POWELL ST","JACKSON ST","JOHN ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10689000" "11EXC-3843","POWELL ST","JOHN ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25062000" "11EXC-3843","POWELL ST","JOHN ST","PACIFIC AVE","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","10690000" "11EXC-3843","POWELL ST","VALLEJO ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25411000" "11EXC-3843","ROBERT C LEVY TUNL","BROADWAY \ POWELL ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25111000" "11EXC-3843","SUTTER ST","MASON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","24920000" "11EXC-3843","TAYLOR ST","BERNARD ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25129000" "11EXC-3843","TAYLOR ST","BERNARD ST","BROADWAY","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12448000" "11EXC-3843","TAYLOR ST","BROADWAY","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25118000" "11EXC-3843","TAYLOR ST","BROADWAY","FALLON PL","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12449000" "11EXC-3843","TAYLOR ST","CLAY ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25095000" "11EXC-3843","TAYLOR ST","CLAY ST","WASHINGTON ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12444000" "11EXC-3843","TAYLOR ST","FALLON PL","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25134000" "11EXC-3843","TAYLOR ST","FALLON PL","VALLEJO ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12450000" "11EXC-3843","TAYLOR ST","JACKSON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25121000" "11EXC-3843","TAYLOR ST","JACKSON ST","PACIFIC AVE","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12446000" "11EXC-3843","TAYLOR ST","PACIFIC AVE","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25130000" "11EXC-3843","TAYLOR ST","PACIFIC AVE","BERNARD ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12447000" "11EXC-3843","TAYLOR ST","VALLEJO ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25432000" "11EXC-3843","TAYLOR ST","VALLEJO ST","GREEN ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12451000" "11EXC-3843","TAYLOR ST","WASHINGTON ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25120000" "11EXC-3843","TAYLOR ST","WASHINGTON ST","JACKSON ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","12445000" "11EXC-3843","VALLEJO ST","POWELL ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25411000" "11EXC-3843","VALLEJO ST","POWELL ST","MASON ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","13098000" "11EXC-3843","VALLEJO ST","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25432000" "11EXC-3843","VALLEJO ST","TURK MURPHY LN","POWELL ST","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","13097000" "11EXC-3843","WASHINGTON ST","TAYLOR ST","","Excavation","J. Flores Construction Co.","8-Inch Ductile Iron Water Main Pipe Installation in Mason St., Powell St., Taylor St. and Auburn St.","2011-09-27 10:42:18","ACTIVE","25120000" "11EXC-3932","GENEVA AVE","GLORIA CT","MISSION ST","Excavation","A. Ruiz Construction Co.","Intersection of Mission and Geneva- Contract Spec/Job No.: 1667J","2011-09-22 15:48:22","APPROVED","6137101" "11EXC-3932","GENEVA AVE","MISSION ST","","Excavation","A. Ruiz Construction Co.","Intersection of Mission and Geneva- Contract Spec/Job No.: 1667J","2011-09-22 15:48:22","APPROVED","21486000" "11EXC-3932","GENEVA AVE","MISSION ST","LONDON ST","Excavation","A. Ruiz Construction Co.","Intersection of Mission and Geneva- Contract Spec/Job No.: 1667J","2011-09-22 15:48:22","APPROVED","6138101" "11EXC-3932","MISSION ST","AMAZON AVE","GENEVA AVE","Excavation","A. Ruiz Construction Co.","Intersection of Mission and Geneva- Contract Spec/Job No.: 1667J","2011-09-22 15:48:22","APPROVED","9177000" "11EXC-3932","MISSION ST","GENEVA AVE","","Excavation","A. Ruiz Construction Co.","Intersection of Mission and Geneva- Contract Spec/Job No.: 1667J","2011-09-22 15:48:22","APPROVED","21486000" "11EXC-3932","MISSION ST","GENEVA AVE","ROLPH ST","Excavation","A. Ruiz Construction Co.","Intersection of Mission and Geneva- Contract Spec/Job No.: 1667J","2011-09-22 15:48:22","APPROVED","9178000" "11EXC-3954","25TH ST","BARTLETT ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","24087000" "11EXC-3954","25TH ST","BARTLETT ST","ORANGE ALY","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","1443000" "11EXC-3954","25TH ST","MISSION ST","OSAGE ALY","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","1441000" "11EXC-3954","25TH ST","ORANGE ALY","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","24090000" "11EXC-3954","25TH ST","ORANGE ALY","VALENCIA ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","1444000" "11EXC-3954","25TH ST","OSAGE ALY","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","24085000" "11EXC-3954","25TH ST","OSAGE ALY","BARTLETT ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","1442000" "11EXC-3954","ALABAMA ST","ESMERALDA AVE \ WALTHAM ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21111000" "11EXC-3954","BARTLETT ST","25TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","24087000" "11EXC-3954","BIRCH ST","OCTAVIA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","25944000" "11EXC-3954","BRADFORD ST","ESMERALDA AVE \ PERALTA AVE","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21105000" "11EXC-3954","ESMERALDA AVE","ALABAMA ST \ WALTHAM ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21111000" "11EXC-3954","ESMERALDA AVE","ALABAMA ST \ WALTHAM ST","BRADFORD ST \ PERALTA AVE","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","5252000" "11EXC-3954","ESMERALDA AVE","BRADFORD ST \ PERALTA AVE","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21105000" "11EXC-3954","ESMERALDA AVE","BRADFORD ST \ PERALTA AVE","FRANCONIA ST \ PERALTA AVE","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","5253000" "11EXC-3954","GROVE ST","VAN NESS AVE","FRANKLIN ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","6555000" "11EXC-3954","MILLER PL","SACRAMENTO ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","25010000" "11EXC-3954","MILLER PL","SACRAMENTO ST","END","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","9030000" "11EXC-3954","OCTAVIA ST","BIRCH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","25944000" "11EXC-3954","OCTAVIA ST","BIRCH ST","FULTON ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","9887000" "11EXC-3954","OCTAVIA ST","GROVE ST","BIRCH ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","9886000" "11EXC-3954","ORANGE ALY","25TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","24090000" "11EXC-3954","OSAGE ALY","25TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","24085000" "11EXC-3954","PERALTA AVE","BRADFORD ST \ ESMERALDA AVE","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21105000" "11EXC-3954","PERALTA AVE","BRADFORD ST \ ESMERALDA AVE","MAYFLOWER ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","10349000" "11EXC-3954","PRECITA AVE","COSO AVE","EMMETT CT","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","10741001" "11EXC-3954","PRECITA AVE","EMMETT CT","SHOTWELL ST","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","10741002" "11EXC-3954","PRECITA AVE","SHOTWELL ST","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21291000" "11EXC-3954","SACRAMENTO ST","MILLER PL","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","25010000" "11EXC-3954","SHOTWELL ST","PRECITA AVE","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21291000" "11EXC-3954","WALTHAM ST","ALABAMA ST \ ESMERALDA AVE","","Excavation","Shaw Pipeline Inc.","Various Locations Pavement Renovation No. 13 and Sewer Replacement (ID No. FCE10029/ Contract No. 1444J)","2011-09-22 08:54:54","ACTIVE","21111000" "11EXC-3955","17TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24139000" "11EXC-3955","19TH ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24129000" "11EXC-3955","21ST ST","SOUTH VAN NESS AVE","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24083000" "11EXC-3955","21ST ST","SOUTH VAN NESS AVE","CAPP ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","1107000" "11EXC-3955","24TH ST","MISSION ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24088000" "11EXC-3955","MISSION ST","23RD ST","24TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","9125000" "11EXC-3955","MISSION ST","24TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24088000" "11EXC-3955","SOUTH VAN NESS AVE","17TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24139000" "11EXC-3955","SOUTH VAN NESS AVE","17TH ST","18TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","12024000" "11EXC-3955","SOUTH VAN NESS AVE","19TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24129000" "11EXC-3955","SOUTH VAN NESS AVE","20TH ST","21ST ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","12027000" "11EXC-3955","SOUTH VAN NESS AVE","21ST ST","","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","24083000" "11EXC-3955","SOUTH VAN NESS AVE","24TH ST","25TH ST","Excavation","Esquivel Grading & Paving, Inc.","Various Locations Pavement Renovation #14 (Contract No. 1724J)(Additional Sewer & Roadway Work)","2011-09-22 14:44:03","APPROVED","12031000" "11EXC-3978","HOLLY PARK CIR","BOCANA ST","NEWMAN ST","Excavation","Pacific Gas & Electric","Crescent #3 GPRP Project","2011-09-26 07:44:28","ACTIVE","7000000" "11EXC-3980","EVANS AVE","QUINT ST","RANKIN ST","Excavation","Pacific Gas & Electric","1700 BLOCK OF EVANS AVE.","2011-09-26 08:47:02","ACTIVE","5336000" "11EXC-4031","10TH AVE","PACHECO ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27094000" "11EXC-4031","10TH AVE","PACHECO ST","QUINTARA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","478000" "11EXC-4031","10TH AVE","QUINTARA ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","22982000" "11EXC-4031","11TH AVE","KIRKHAM ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27158000" "11EXC-4031","14TH AVE","VICENTE ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","22949000" "11EXC-4031","14TH AVE","VICENTE ST","WAWONA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","575000" "11EXC-4031","14TH AVE","WAWONA ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","22944000" "11EXC-4031","22ND AVE","LAWTON ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27387000" "11EXC-4031","22ND AVE","LAWTON ST","MORAGA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","1143000" "11EXC-4031","30TH AVE","TARAVAL ST","ULLOA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","1660000" "11EXC-4031","30TH AVE","ULLOA ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23259000" "11EXC-4031","35TH AVE","TARAVAL ST","ULLOA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","1781000" "11EXC-4031","35TH AVE","ULLOA ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23374000" "11EXC-4031","46TH AVE","JUDAH ST","KIRKHAM ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","2022000" "11EXC-4031","46TH AVE","KIRKHAM ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27935000" "11EXC-4031","47TH AVE","ULLOA ST","VICENTE ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","2056000" "11EXC-4031","47TH AVE","VICENTE ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23500000" "11EXC-4031","48TH AVE","LAWTON ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27939000" "11EXC-4031","48TH AVE","LAWTON ST","MORAGA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","2070000" "11EXC-4031","48TH AVE","MORAGA ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27938000" "11EXC-4031","48TH AVE","NORIEGA ST","ORTEGA ST","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","2072000" "11EXC-4031","48TH AVE","ORTEGA ST","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27925000" "11EXC-4031","CONSTANSO WAY","CRESTLAKE DR","ESCONDIDO AVE","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","4360000" "11EXC-4031","CONSTANSO WAY","ESCONDIDO AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23336000" "11EXC-4031","CONSTANSO WAY","ESCONDIDO AVE","EVERGLADE DR \ SLOAT BLVD","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","4361000" "11EXC-4031","CONSTANSO WAY","EVERGLADE DR \ SLOAT BLVD","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23335000" "11EXC-4031","ESCONDIDO AVE","CONSTANSO WAY","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23336000" "11EXC-4031","EVERGLADE DR","CONSTANSO WAY \ SLOAT BLVD","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23335000" "11EXC-4031","KIRKHAM ST","10TH AVE","11TH AVE","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","7848000" "11EXC-4031","KIRKHAM ST","11TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27158000" "11EXC-4031","KIRKHAM ST","46TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27935000" "11EXC-4031","KIRKHAM ST","46TH AVE","47TH AVE","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","7886000" "11EXC-4031","LAWTON ST","22ND AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27387000" "11EXC-4031","LAWTON ST","48TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27939000" "11EXC-4031","MORAGA ST","48TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27938000" "11EXC-4031","ORTEGA ST","48TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27925000" "11EXC-4031","PACHECO ST","10TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","27094000" "11EXC-4031","QUINTARA ST","10TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","22982000" "11EXC-4031","SLOAT BLVD","CONSTANSO WAY \ EVERGLADE DR","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23335000" "11EXC-4031","ULLOA ST","30TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23259000" "11EXC-4031","ULLOA ST","35TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23374000" "11EXC-4031","VICENTE ST","14TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","22949000" "11EXC-4031","VICENTE ST","47TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","23500000" "11EXC-4031","VICENTE ST","47TH AVE","GREAT HWY","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","13274000" "11EXC-4031","WAWONA ST","14TH AVE","","Excavation","J. Flores Construction Co.","Various Locations Sewer Replacement No. 2 San Francisco Water Power Sewer Contract No. WW-418","2011-09-30 15:42:32","APPROVED","22944000" "11EXC-4087","16TH ST","CAROLINA ST","DE HARO ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","708000" "11EXC-4087","16TH ST","DE HARO ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23754000" "11EXC-4087","16TH ST","DE HARO ST","RHODE ISLAND ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","709000" "11EXC-4087","16TH ST","RHODE ISLAND ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23773000" "11EXC-4087","16TH ST","RHODE ISLAND ST","KANSAS ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","710000" "11EXC-4087","36TH AVE","QUINTARA ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23417000" "11EXC-4087","ALEMANY BLVD","NORTON ST","SAN JUAN AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","2165103" "11EXC-4087","ALEMANY BLVD","SAN JUAN AVE","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","21740000" "11EXC-4087","ALEMANY BLVD","SAN JUAN AVE","OCEAN AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","2166101" "11EXC-4087","ALEMANY BLVD","SAN JUAN AVE","OCEAN AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","2166201" "11EXC-4087","ALEMANY BLVD","SANTA ROSA AVE","SAN JUAN AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","2165201" "11EXC-4087","ASHTON AVE","LEGION CT","OCEAN AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","2528000" "11EXC-4087","ASHTON AVE","OCEAN AVE","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","22661000" "11EXC-4087","CALIFORNIA ST","PIERCE ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26640000" "11EXC-4087","CALIFORNIA ST","PIERCE ST","SCOTT ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","3560000" "11EXC-4087","CALIFORNIA ST","STEINER ST","PIERCE ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","3559000" "11EXC-4087","CAPITOL AVE","DE MONTFORT AVE","OCEAN AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","3670000" "11EXC-4087","CAPITOL AVE","OCEAN AVE","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","22628000" "11EXC-4087","DE HARO ST","16TH ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23754000" "11EXC-4087","DIVISADERO ST","GROVE ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26056000" "11EXC-4087","DIVISADERO ST","GROVE ST","FULTON ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","4804101" "11EXC-4087","DIVISADERO ST","GROVE ST","FULTON ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","4804201" "11EXC-4087","DIVISADERO ST","HAYES ST","GROVE ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","4803101" "11EXC-4087","DIVISADERO ST","HAYES ST","GROVE ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","4803201" "11EXC-4087","FOLSOM ST","COLUMBIA SQUARE ST","RUSS ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","5669000" "11EXC-4087","FOLSOM ST","MOSS ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","24263000" "11EXC-4087","FOLSOM ST","MOSS ST","07TH ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","5672000" "11EXC-4087","FOLSOM ST","RUSS ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","24279000" "11EXC-4087","FOLSOM ST","RUSS ST","SHERMAN ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","5670000" "11EXC-4087","FOLSOM ST","SHERMAN ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","24264000" "11EXC-4087","FOLSOM ST","SHERMAN ST","MOSS ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","5671000" "11EXC-4087","GROVE ST","DIVISADERO ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26056000" "11EXC-4087","GROVE ST","DIVISADERO ST","BRODERICK ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","6564000" "11EXC-4087","GROVE ST","SCOTT ST","DIVISADERO ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","6563000" "11EXC-4087","MOSS ST","FOLSOM ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","24263000" "11EXC-4087","OAK ST","STANYAN ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26441000" "11EXC-4087","OCEAN AVE","ASHTON AVE","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","22661000" "11EXC-4087","OCEAN AVE","ASHTON AVE","KEYSTONE WAY","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9831101" "11EXC-4087","OCEAN AVE","ASHTON AVE","KEYSTONE WAY","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9831201" "11EXC-4087","OCEAN AVE","CAPITOL AVE","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","22628000" "11EXC-4087","OCEAN AVE","CAPITOL AVE","FAXON AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9827101" "11EXC-4087","OCEAN AVE","CAPITOL AVE","FAXON AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9827201" "11EXC-4087","OCEAN AVE","DORADO TER \ JULES AVE","ASHTON AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9830101" "11EXC-4087","OCEAN AVE","DORADO TER \ JULES AVE","ASHTON AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9830201" "11EXC-4087","OCEAN AVE","MIRAMAR AVE","CAPITOL AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9826101" "11EXC-4087","OCEAN AVE","MIRAMAR AVE","CAPITOL AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","9826201" "11EXC-4087","PAGE ST","SHRADER ST","STANYAN ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10188000" "11EXC-4087","PAGE ST","STANYAN ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26440000" "11EXC-4087","PIERCE ST","CALIFORNIA ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26640000" "11EXC-4087","PIERCE ST","CALIFORNIA ST","PERINE PL","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10434000" "11EXC-4087","PIERCE ST","PINE ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26634000" "11EXC-4087","PIERCE ST","PINE ST","CALIFORNIA ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10433000" "11EXC-4087","PINE ST","PIERCE ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26634000" "11EXC-4087","QUINTARA ST","36TH AVE","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23417000" "11EXC-4087","QUINTARA ST","36TH AVE","SUNSET BLVD","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10872000" "11EXC-4087","QUINTARA ST","SUNSET BLVD","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23418000" "11EXC-4087","QUINTARA ST","SUNSET BLVD","37TH AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10873000" "11EXC-4087","RHODE ISLAND ST","15TH ST","16TH ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10994000" "11EXC-4087","RHODE ISLAND ST","16TH ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23773000" "11EXC-4087","RHODE ISLAND ST","16TH ST","17TH ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","10995000" "11EXC-4087","RUSS ST","FOLSOM ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","24279000" "11EXC-4087","RUSS ST","HOWARD ST","FOLSOM ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","11186000" "11EXC-4087","SAN JUAN AVE","ALEMANY BLVD","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","21740000" "11EXC-4087","SAN JUAN AVE","ALEMANY BLVD","CAYUGA AVE","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","11477000" "11EXC-4087","SAN JUAN AVE","MISSION ST","ALEMANY BLVD","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","11476000" "11EXC-4087","SHERMAN ST","FOLSOM ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","24264000" "11EXC-4087","STANYAN ST","OAK ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26441000" "11EXC-4087","STANYAN ST","OAK ST","PAGE ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","12089000" "11EXC-4087","STANYAN ST","PAGE ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","26440000" "11EXC-4087","STANYAN ST","PAGE ST","HAIGHT ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","12090000" "11EXC-4087","SUNSET BLVD","PACHECO ST","QUINTARA ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","12282101" "11EXC-4087","SUNSET BLVD","PACHECO ST","QUINTARA ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","12282201" "11EXC-4087","SUNSET BLVD","QUINTARA ST","","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","23418000" "11EXC-4087","SUNSET BLVD","QUINTARA ST","RIVERA ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","12283101" "11EXC-4087","SUNSET BLVD","QUINTARA ST","RIVERA ST","Excavation","Bay Area Lightworks","Contract 60 New Traffic Signals - Contract No. - 1812J","2011-11-10 12:23:32","APPROVED","12283201" "11EXC-4098","APTOS AVE","UPLAND DR","OCEAN AVE","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","2378000" "11EXC-4098","CERRITOS AVE","OCEAN AVE \ WESTGATE DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22755000" "11EXC-4098","DARIEN WAY","APTOS AVE","SAN ALESO AVE","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","4590000" "11EXC-4098","DARIEN WAY","SAN ALESO AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22765000" "11EXC-4098","DARIEN WAY","SAN ALESO AVE","WESTGATE DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","4591000" "11EXC-4098","DARIEN WAY","WESTGATE DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22758000" "11EXC-4098","DARIEN WAY","WESTGATE DR","MANOR DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","4592000" "11EXC-4098","KENWOOD WAY","WESTGATE DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22768000" "11EXC-4098","MAYWOOD DR","YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22818000" "11EXC-4098","MIRALOMA DR","RAVENWOOD DR \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22811000" "11EXC-4098","MONTEREY BLVD","SAN ALESO AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22766000" "11EXC-4098","MONTEREY BLVD","SAN JACINTO WAY","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22764000" "11EXC-4098","MONTEREY BLVD","SAN JACINTO WAY","SAN ALESO AVE","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","9287101" "11EXC-4098","MONTEREY BLVD","SAN JACINTO WAY","SAN ALESO AVE","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","9287201" "11EXC-4098","OCEAN AVE","CERRITOS AVE \ WESTGATE DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22755000" "11EXC-4098","RAVENWOOD DR","MIRALOMA DR \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22811000" "11EXC-4098","RAVENWOOD DR","MIRALOMA DR \ YERBA BUENA AVE","FERNWOOD DR \ ROSEWOOD DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","10937000" "11EXC-4098","SAN ALESO AVE","DARIEN WAY","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22765000" "11EXC-4098","SAN ALESO AVE","DARIEN WAY","UPLAND DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","11329000" "11EXC-4098","SAN ALESO AVE","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22766000" "11EXC-4098","SAN ALESO AVE","MONTEREY BLVD","DARIEN WAY","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","11328000" "11EXC-4098","SAN ALESO AVE","UPLAND DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22762000" "11EXC-4098","SAN FELIPE AVE","EL VERANO WAY \ MONTEREY BLVD \ NORTHGATE DR","SAN JACINTO WAY","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","11411000" "11EXC-4098","SAN FELIPE AVE","SAN JACINTO WAY","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22817000" "11EXC-4098","SAN JACINTO WAY","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22764000" "11EXC-4098","SAN JACINTO WAY","RAVENWOOD DR","SAN FELIPE AVE","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","11418000" "11EXC-4098","SAN JACINTO WAY","SAN FELIPE AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22817000" "11EXC-4098","SAN JACINTO WAY","SAN FELIPE AVE","MONTEREY BLVD","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","11419000" "11EXC-4098","SAN JACINTO WAY","SANTA PAULA AVE","RAVENWOOD DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","11417000" "11EXC-4098","UPLAND DR","PINEHURST WAY","WESTGATE DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","13009000" "11EXC-4098","UPLAND DR","SAN ALESO AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22762000" "11EXC-4098","UPLAND DR","SAN ALESO AVE","APTOS AVE","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","13011000" "11EXC-4098","UPLAND DR","WESTGATE DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22760000" "11EXC-4098","WESTGATE DR","CERRITOS AVE \ OCEAN AVE","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22755000" "11EXC-4098","WESTGATE DR","CERRITOS AVE \ OCEAN AVE","KENWOOD WAY","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","13583000" "11EXC-4098","WESTGATE DR","DARIEN WAY","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22758000" "11EXC-4098","WESTGATE DR","KENWOOD WAY","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22768000" "11EXC-4098","WESTGATE DR","KENWOOD WAY","UPLAND DR","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","13584000" "11EXC-4098","WESTGATE DR","UPLAND DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22760000" "11EXC-4098","WESTGATE DR","UPLAND DR","DARIEN WAY","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","13585000" "11EXC-4098","YERBA BUENA AVE","MAYWOOD DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22818000" "11EXC-4098","YERBA BUENA AVE","MIRALOMA DR \ RAVENWOOD DR","","Excavation","Pacific Gas & Electric","Westgate GPRP Project","2011-12-27 15:45:13","ACTIVE","22811000" "11EXC-4102","BEALE ST","MISSION ST","","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","24554000" "11EXC-4102","BEALE ST","MISSION ST","HOWARD ST","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","2864000" "11EXC-4102","FREMONT ST","FRONT ST \ MARKET ST","MISSION ST","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","5860000" "11EXC-4102","FREMONT ST","MISSION ST","","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","24560000" "11EXC-4102","MISSION ST","BEALE ST","","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","24554000" "11EXC-4102","MISSION ST","BEALE ST","FREMONT ST","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","9086000" "11EXC-4102","MISSION ST","FREMONT ST","","Excavation","Cable Com of California Inc","50 FREMONT ST","2011-10-04 14:11:50","ACTIVE","24560000" "11EXC-4110","PFEIFFER ST","STOCKTON ST","","Excavation","SBC - Pacific Bell Engineering","pothole","2011-10-07 09:15:56","ACTIVE","25406000" "11EXC-4110","STOCKTON ST","PFEIFFER ST","","Excavation","SBC - Pacific Bell Engineering","pothole","2011-10-07 09:15:56","ACTIVE","25406000" "11EXC-4128","JACKSON ST","ADELE CT","POWELL ST","Excavation","SBC - Pacific Bell Engineering","Jackson St --pothole","2011-10-06 08:48:51","ACTIVE","7384000" "11EXC-4164","BAKER ST","MARINA BLVD","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","27020000" "11EXC-4164","BRODERICK ST","MARINA BLVD","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","27014000" "11EXC-4164","BUCHANAN ST","GREENWICH ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26734000" "11EXC-4164","BUCHANAN ST","GREENWICH ST","MOULTON ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","3352000" "11EXC-4164","BUCHANAN ST","LOMBARD ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26737000" "11EXC-4164","BUCHANAN ST","MOULTON ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26743000" "11EXC-4164","BUCHANAN ST","MOULTON ST","LOMBARD ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","3353000" "11EXC-4164","BUCHANAN ST","SACRAMENTO ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26561000" "11EXC-4164","DIVISADERO ST","MARINA BLVD","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","27015000" "11EXC-4164","FILBERT ST","PIERCE ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26684000" "11EXC-4164","FILBERT ST","STEINER ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26683000" "11EXC-4164","FILBERT ST","STEINER ST","PIERCE ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","5523000" "11EXC-4164","GREENWICH ST","BUCHANAN ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26734000" "11EXC-4164","GREENWICH ST","PIERCE ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26963000" "11EXC-4164","LOMBARD ST","BUCHANAN ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26737000" "11EXC-4164","MARINA BLVD","BAKER ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","27020000" "11EXC-4164","MARINA BLVD","BAKER ST","HWY 101 NORTHBOUND \ HWY 101 SOUTHBOUND \ LYON ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8709101" "11EXC-4164","MARINA BLVD","BRODERICK ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","27014000" "11EXC-4164","MARINA BLVD","BRODERICK ST","BAKER ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8708101" "11EXC-4164","MARINA BLVD","BRODERICK ST","BAKER ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8708201" "11EXC-4164","MARINA BLVD","CERVANTES BLVD \ MARINA GREEN DR \ SCOTT ST","DIVISADERO ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8706101" "11EXC-4164","MARINA BLVD","CERVANTES BLVD \ MARINA GREEN DR \ SCOTT ST","DIVISADERO ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8706201" "11EXC-4164","MARINA BLVD","DIVISADERO ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","27015000" "11EXC-4164","MARINA BLVD","DIVISADERO ST","BRODERICK ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8707101" "11EXC-4164","MARINA BLVD","DIVISADERO ST","BRODERICK ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","8707201" "11EXC-4164","MOULTON ST","BUCHANAN ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26743000" "11EXC-4164","PIERCE ST","FILBERT ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26684000" "11EXC-4164","PIERCE ST","FILBERT ST","GREENWICH ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","10443000" "11EXC-4164","PIERCE ST","GREENWICH ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26963000" "11EXC-4164","SACRAMENTO ST","BUCHANAN ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26561000" "11EXC-4164","SACRAMENTO ST","BUCHANAN ST","WEBSTER ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","11254000" "11EXC-4164","SACRAMENTO ST","GOLDBERG LN","FILLMORE ST","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","11256000" "11EXC-4164","SACRAMENTO ST","WEBSTER ST","GOLDBERG LN","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","11255000" "11EXC-4164","STEINER ST","FILBERT ST","","Excavation","M Squared Construction, Inc.","Buchanan/ Pierce/ Filbert/ Sacramento Streets and Marina Blvd. Sewer Replacement (Contract No. WW-433)","2011-10-20 10:44:23","APPROVED","26683000" "11EXC-4180","ARGUELLO BLVD","CLEMENT ST","GEARY BLVD","Excavation","Pacific Gas & Electric","421 ARGUELLO BLVD.","2012-01-06 16:06:48","APPROVED","2422000" "11EXC-4231","ALEMANY BLVD","SAN JUAN AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","21740000" "11EXC-4231","CAPISTRANO AVE","SANTA ROSA AVE","SANTA YSABEL AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","3655000" "11EXC-4231","CAYUGA AVE","COTTER ST","SANTA ROSA AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","3828000" "11EXC-4231","CAYUGA AVE","OCEAN AVE","VALERTON CT","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","3832000" "11EXC-4231","CAYUGA AVE","SAN JUAN AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","21800000" "11EXC-4231","CAYUGA AVE","SAN JUAN AVE","SANTA YNEZ AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","3830000" "11EXC-4231","CAYUGA AVE","SANTA ROSA AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","21801000" "11EXC-4231","CAYUGA AVE","SANTA ROSA AVE","SAN JUAN AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","3829000" "11EXC-4231","CAYUGA AVE","SANTA YNEZ AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","33020000" "11EXC-4231","DELANO AVE","MEDA AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22078000" "11EXC-4231","DELANO AVE","MEDA AVE","OCEAN AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","4677000" "11EXC-4231","DELANO AVE","OCEAN AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22079000" "11EXC-4231","DELANO AVE","OCEAN AVE","ONEIDA AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","4678000" "11EXC-4231","DELANO AVE","RUDDEN AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22071000" "11EXC-4231","DELANO AVE","RUDDEN AVE","MEDA AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","4676000" "11EXC-4231","MEDA AVE","DELANO AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22078000" "11EXC-4231","MEDA AVE","OCEAN AVE \ OTSEGO AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22070000" "11EXC-4231","MEDA AVE","OCEAN AVE \ OTSEGO AVE","DELANO AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","8942000" "11EXC-4231","OCEAN AVE","DELANO AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22079000" "11EXC-4231","OCEAN AVE","MEDA AVE \ OTSEGO AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22070000" "11EXC-4231","OTSEGO AVE","MEDA AVE \ OCEAN AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22070000" "11EXC-4231","OTSEGO AVE","MEDA AVE \ OCEAN AVE","ONONDAGA AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","10053000" "11EXC-4231","OTSEGO AVE","RUDDEN AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22072000" "11EXC-4231","OTSEGO AVE","RUDDEN AVE","MEDA AVE \ OCEAN AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","10052000" "11EXC-4231","RUDDEN AVE","DELANO AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22071000" "11EXC-4231","RUDDEN AVE","OTSEGO AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","22072000" "11EXC-4231","RUDDEN AVE","OTSEGO AVE","DELANO AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","11182000" "11EXC-4231","SAN JUAN AVE","ALEMANY BLVD","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","21740000" "11EXC-4231","SAN JUAN AVE","ALEMANY BLVD","CAYUGA AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","11477000" "11EXC-4231","SAN JUAN AVE","CAYUGA AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","21800000" "11EXC-4231","SAN JUAN AVE","CAYUGA AVE","CAPISTRANO AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","11478000" "11EXC-4231","SANTA ROSA AVE","ALEMANY BLVD","CAYUGA AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","11590000" "11EXC-4231","SANTA ROSA AVE","CAYUGA AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","21801000" "11EXC-4231","SANTA YNEZ AVE","CAYUGA AVE","","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","33020000" "11EXC-4231","SANTA YNEZ AVE","CAYUGA AVE","CAPISTRANO AVE","Excavation","Pacific Gas & Electric","Balboa Park 3 North GPRP Project","2011-12-28 15:08:55","ACTIVE","11597000" "11EXC-4276","NATOMA ST","08TH ST","09TH ST","Excavation","San Francisco Water Department","757 Natoma - FIRE","2011-10-26 13:44:08","ACTIVE","9515000" "11EXC-4302","GRACE ST","MISSION ST","HOWARD ST","Excavation","Pacific Gas & Electric","151 10th St.(Exc. in Grace St.)","2011-12-20 09:42:36","APPROVED","6354000" "11EXC-4331","AMAZON AVE","ATHENS ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21406000" "11EXC-4331","AMAZON AVE","ATHENS ST","MOSCOW ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","2251000" "11EXC-4331","AMAZON AVE","NAPLES ST","VIENNA ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","2249000" "11EXC-4331","AMAZON AVE","VIENNA ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21408000" "11EXC-4331","AMAZON AVE","VIENNA ST","ATHENS ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","2250000" "11EXC-4331","ATHENS ST","AMAZON AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21406000" "11EXC-4331","ATHENS ST","AMAZON AVE","GENEVA AVE","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","2541000" "11EXC-4331","ATHENS ST","FRANCE AVE","ITALY AVE","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","2539000" "11EXC-4331","ATHENS ST","GENEVA AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21405000" "11EXC-4331","ATHENS ST","ITALY AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21401000" "11EXC-4331","ATHENS ST","ITALY AVE","AMAZON AVE","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","2540000" "11EXC-4331","GENEVA AVE","ATHENS ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21405000" "11EXC-4331","GENEVA AVE","ATHENS ST","MOSCOW ST \ SOUTH HILL BLVD","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6146101" "11EXC-4331","GENEVA AVE","ATHENS ST","MOSCOW ST \ SOUTH HILL BLVD","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6146201" "11EXC-4331","GENEVA AVE","EDINBURG ST","NAPLES ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6143101" "11EXC-4331","GENEVA AVE","EDINBURG ST","NAPLES ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6143201" "11EXC-4331","GENEVA AVE","MOSCOW ST \ SOUTH HILL BLVD","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21396000" "11EXC-4331","GENEVA AVE","MUNICH ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","33723000" "11EXC-4331","GENEVA AVE","NAPLES ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21426000" "11EXC-4331","GENEVA AVE","NAPLES ST","VIENNA ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6144101" "11EXC-4331","GENEVA AVE","NAPLES ST","VIENNA ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6144201" "11EXC-4331","GENEVA AVE","VIENNA ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21425000" "11EXC-4331","GENEVA AVE","VIENNA ST","ATHENS ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6145101" "11EXC-4331","GENEVA AVE","VIENNA ST","ATHENS ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","6145201" "11EXC-4331","ITALY AVE","ATHENS ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21401000" "11EXC-4331","ITALY AVE","ATHENS ST","MOSCOW ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","7348000" "11EXC-4331","ITALY AVE","NAPLES ST","VIENNA ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","7346000" "11EXC-4331","ITALY AVE","VIENNA ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21409000" "11EXC-4331","ITALY AVE","VIENNA ST","ATHENS ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","7347000" "11EXC-4331","MOSCOW ST","AMAZON AVE","GENEVA AVE \ SOUTH HILL BLVD","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","9405000" "11EXC-4331","MOSCOW ST","GENEVA AVE \ SOUTH HILL BLVD","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21396000" "11EXC-4331","MUNICH ST","GENEVA AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","33723000" "11EXC-4331","MUNICH ST","SOUTH HILL BLVD","ROLPH ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","9452000" "11EXC-4331","NAPLES ST","GENEVA AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21426000" "11EXC-4331","NAPLES ST","GENEVA AVE","ROLPH ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","9497000" "11EXC-4331","SOUTH HILL BLVD","GENEVA AVE \ MOSCOW ST","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21396000" "11EXC-4331","SOUTH HILL BLVD","GENEVA AVE \ MOSCOW ST","MUNICH ST","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","12000000" "11EXC-4331","VIENNA ST","AMAZON AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21408000" "11EXC-4331","VIENNA ST","AMAZON AVE","GENEVA AVE","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","13306000" "11EXC-4331","VIENNA ST","GENEVA AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21425000" "11EXC-4331","VIENNA ST","ITALY AVE","","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","21409000" "11EXC-4331","VIENNA ST","ITALY AVE","AMAZON AVE","Excavation","Pacific Gas & Electric","GPRP - GENEVA # 1","2011-12-28 10:57:07","ACTIVE","13305000" "11EXC-4354","39TH AVE","RIVERA ST","SANTIAGO ST","Excavation","Pacific Gas & Electric","2274 39TH AVE, INSTALLATION OF NEW ANCHOR","2012-01-19 08:43:07","APPROVED","1877000" "11EXC-4358","08TH AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","1866 8th Avenue, San Francisco","2011-12-13 11:04:27","APPROVED","401000" "11EXC-4359","08TH AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","1864 8th Avenue, San Francisco","2011-12-13 11:13:07","APPROVED","401000" "11EXC-4383","29TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27408000" "11EXC-4383","30TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27683000" "11EXC-4383","31ST AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27684000" "11EXC-4383","32ND AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27687000" "11EXC-4383","33RD AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27688000" "11EXC-4383","34TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27701000" "11EXC-4383","35TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27702000" "11EXC-4383","36TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27706000" "11EXC-4383","37TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27708000" "11EXC-4383","38TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27759000" "11EXC-4383","39TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27760000" "11EXC-4383","40TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27763000" "11EXC-4383","41ST AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27772000" "11EXC-4383","42ND AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27773000" "11EXC-4383","43RD AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27777000" "11EXC-4383","44TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27779000" "11EXC-4383","45TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27933000" "11EXC-4383","46TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27932000" "11EXC-4383","47TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27937000" "11EXC-4383","48TH AVE","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27939000" "11EXC-4383","GREAT HWY","LA PLAYA \ LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27944000" "11EXC-4383","LA PLAYA","GREAT HWY \ LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27944000" "11EXC-4383","LAWTON ST","28TH AVE","29TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8208000" "11EXC-4383","LAWTON ST","29TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27408000" "11EXC-4383","LAWTON ST","29TH AVE","30TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8209000" "11EXC-4383","LAWTON ST","30TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27683000" "11EXC-4383","LAWTON ST","30TH AVE","31ST AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8210000" "11EXC-4383","LAWTON ST","31ST AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27684000" "11EXC-4383","LAWTON ST","31ST AVE","32ND AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8211000" "11EXC-4383","LAWTON ST","32ND AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27687000" "11EXC-4383","LAWTON ST","32ND AVE","33RD AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8212000" "11EXC-4383","LAWTON ST","33RD AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27688000" "11EXC-4383","LAWTON ST","33RD AVE","34TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8213000" "11EXC-4383","LAWTON ST","34TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27701000" "11EXC-4383","LAWTON ST","34TH AVE","35TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8214000" "11EXC-4383","LAWTON ST","35TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27702000" "11EXC-4383","LAWTON ST","35TH AVE","36TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8215000" "11EXC-4383","LAWTON ST","36TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27706000" "11EXC-4383","LAWTON ST","36TH AVE","SUNSET BLVD","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8216000" "11EXC-4383","LAWTON ST","37TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27708000" "11EXC-4383","LAWTON ST","38TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27759000" "11EXC-4383","LAWTON ST","39TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27760000" "11EXC-4383","LAWTON ST","39TH AVE","40TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8220000" "11EXC-4383","LAWTON ST","40TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27763000" "11EXC-4383","LAWTON ST","40TH AVE","41ST AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8221000" "11EXC-4383","LAWTON ST","41ST AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27772000" "11EXC-4383","LAWTON ST","41ST AVE","42ND AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8222000" "11EXC-4383","LAWTON ST","42ND AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27773000" "11EXC-4383","LAWTON ST","42ND AVE","43RD AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8223000" "11EXC-4383","LAWTON ST","43RD AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27777000" "11EXC-4383","LAWTON ST","43RD AVE","44TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8224000" "11EXC-4383","LAWTON ST","44TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27779000" "11EXC-4383","LAWTON ST","44TH AVE","45TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8225000" "11EXC-4383","LAWTON ST","45TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27933000" "11EXC-4383","LAWTON ST","45TH AVE","46TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8226000" "11EXC-4383","LAWTON ST","46TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27932000" "11EXC-4383","LAWTON ST","47TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27937000" "11EXC-4383","LAWTON ST","47TH AVE","48TH AVE","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8228000" "11EXC-4383","LAWTON ST","48TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27939000" "11EXC-4383","LAWTON ST","48TH AVE","GREAT HWY \ LA PLAYA","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","8229000" "11EXC-4383","LAWTON ST","GREAT HWY \ LA PLAYA","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27944000" "11EXC-4383","LAWTON ST","SUNSET BLVD","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27707000" "11EXC-4383","SUNSET BLVD","LAWTON ST","","Excavation","Esquivel Grading & Paving, Inc.","Lawton Street Pavement Renovation Project (Contract No. 1765J)","2011-10-25 15:16:25","APPROVED","27707000" "11EXC-4391","BRODERICK ST","TURK ST","","Excavation","Pacific Gas & Electric","1000 BLOCK OF BRODERICK ST","2012-01-23 15:07:25","APPROVED","26079000" "11EXC-4391","BRODERICK ST","TURK ST","EDDY ST","Excavation","Pacific Gas & Electric","1000 BLOCK OF BRODERICK ST","2012-01-23 15:07:25","APPROVED","3197000" "11EXC-4391","TURK ST","BRODERICK ST","","Excavation","Pacific Gas & Electric","1000 BLOCK OF BRODERICK ST","2012-01-23 15:07:25","APPROVED","26079000" "11EXC-4431","27TH AVE","KIRKHAM ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27426000" "11EXC-4431","27TH AVE","KIRKHAM ST","LAWTON ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1554000" "11EXC-4431","27TH AVE","LAWTON ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27404000" "11EXC-4431","27TH AVE","LAWTON ST","MORAGA ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1555000" "11EXC-4431","27TH AVE","MORAGA ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27402000" "11EXC-4431","28TH AVE","KIRKHAM ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27429000" "11EXC-4431","28TH AVE","KIRKHAM ST","LAWTON ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1586000" "11EXC-4431","28TH AVE","LAWTON ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27407000" "11EXC-4431","28TH AVE","LAWTON ST","MORAGA ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1587000" "11EXC-4431","28TH AVE","MORAGA ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27405000" "11EXC-4431","28TH AVE","MORAGA ST","NORIEGA ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1588000" "11EXC-4431","28TH AVE","NORIEGA ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27399000" "11EXC-4431","28TH AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1589000" "11EXC-4431","28TH AVE","ORTEGA ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27397000" "11EXC-4431","28TH AVE","ORTEGA ST","PACHECO ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1590000" "11EXC-4431","28TH AVE","PACHECO ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","23290000" "11EXC-4431","29TH AVE","MORAGA ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27406000" "11EXC-4431","29TH AVE","ORTEGA ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27398000" "11EXC-4431","29TH AVE","ORTEGA ST","PACHECO ST","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","1621000" "11EXC-4431","29TH AVE","PACHECO ST","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","23293000" "11EXC-4431","KIRKHAM ST","27TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27426000" "11EXC-4431","KIRKHAM ST","28TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27429000" "11EXC-4431","LAWTON ST","26TH AVE","27TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","8206000" "11EXC-4431","LAWTON ST","27TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27404000" "11EXC-4431","LAWTON ST","27TH AVE","28TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","8207000" "11EXC-4431","LAWTON ST","28TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27407000" "11EXC-4431","MORAGA ST","27TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27402000" "11EXC-4431","MORAGA ST","27TH AVE","28TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","9352000" "11EXC-4431","MORAGA ST","28TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27405000" "11EXC-4431","MORAGA ST","28TH AVE","29TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","9353000" "11EXC-4431","MORAGA ST","29TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27406000" "11EXC-4431","NORIEGA ST","27TH AVE","28TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","9661000" "11EXC-4431","NORIEGA ST","28TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27399000" "11EXC-4431","NORIEGA ST","28TH AVE","29TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","9662000" "11EXC-4431","ORTEGA ST","27TH AVE","28TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","10015000" "11EXC-4431","ORTEGA ST","28TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27397000" "11EXC-4431","ORTEGA ST","28TH AVE","29TH AVE","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","10016000" "11EXC-4431","ORTEGA ST","29TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","27398000" "11EXC-4431","PACHECO ST","28TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","23290000" "11EXC-4431","PACHECO ST","29TH AVE","","Excavation","Pacific Gas & Electric","28TH AVE. NORTH GPRP Project","2012-01-19 09:00:27","APPROVED","23293000" "11EXC-4438","17TH AVE","IRVING ST","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27360000" "11EXC-4438","17TH AVE","IRVING ST","JUDAH ST","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","758000" "11EXC-4438","17TH AVE","JUDAH ST","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27356000" "11EXC-4438","18TH AVE","IRVING ST","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27371000" "11EXC-4438","18TH AVE","IRVING ST","JUDAH ST","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","835000" "11EXC-4438","18TH AVE","JUDAH ST","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27365000" "11EXC-4438","18TH AVE","LINCOLN WAY","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27373000" "11EXC-4438","18TH AVE","LINCOLN WAY","IRVING ST","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","834000" "11EXC-4438","IRVING ST","17TH AVE","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27360000" "11EXC-4438","IRVING ST","17TH AVE","18TH AVE","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","7294000" "11EXC-4438","IRVING ST","18TH AVE","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27371000" "11EXC-4438","IRVING ST","18TH AVE","19TH AVE","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","7295000" "11EXC-4438","JUDAH ST","17TH AVE","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27356000" "11EXC-4438","JUDAH ST","18TH AVE","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27365000" "11EXC-4438","LINCOLN WAY","18TH AVE","","Excavation","Pacific Gas & Electric","Sunset #1 GPRP Project","2011-12-29 09:25:39","APPROVED","27373000" "11EXC-4443","BRODERICK ST","ELLIS ST","OFARRELL ST","Excavation","Pacific Gas & Electric","Broderick St.(Ellis to O'Farrell) Interconnect Station X and Station G","2012-01-23 13:55:15","APPROVED","3199000" "11EXC-4493","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24892000" "11EXC-4493","ELLIS ST","04TH ST \ MARKET ST \ STOCKTON ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24892000" "11EXC-4493","ELLIS ST","04TH ST \ MARKET ST \ STOCKTON ST","POWELL ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","5169000" "11EXC-4493","GEARY ST","GRANT AVE","STOCKTON ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","6108000" "11EXC-4493","GEARY ST","STOCKTON ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24901000" "11EXC-4493","GEARY ST","STOCKTON ST","POWELL ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","6109000" "11EXC-4493","MAIDEN LN","STOCKTON ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24906000" "11EXC-4493","MARKET ST","04TH ST \ ELLIS ST \ STOCKTON ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24892000" "11EXC-4493","OFARRELL ST","SECURITY PACIFIC PL","STOCKTON ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","9721000" "11EXC-4493","OFARRELL ST","STOCKTON ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24902000" "11EXC-4493","OFARRELL ST","STOCKTON ST","POWELL ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","9722000" "11EXC-4493","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24892000" "11EXC-4493","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","OFARRELL ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","12194000" "11EXC-4493","STOCKTON ST","GEARY ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24901000" "11EXC-4493","STOCKTON ST","GEARY ST","MAIDEN LN","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","12196000" "11EXC-4493","STOCKTON ST","MAIDEN LN","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24906000" "11EXC-4493","STOCKTON ST","MAIDEN LN","POST ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","12197000" "11EXC-4493","STOCKTON ST","OFARRELL ST","","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","24902000" "11EXC-4493","STOCKTON ST","OFARRELL ST","GEARY ST","Excavation","Synergy Project Management","Third Street Light Rail Program Phase 2 - Central Subway Union Square/ Market Street Station Utilities Relocation (SFMTA Contract No. 1251)","2011-12-22 12:01:27","APPROVED","12195000" "11EXC-4521","EDNA ST","JUDSON AVE","","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","22158000" "11EXC-4521","EDNA ST","JUDSON AVE","STAPLES AVE","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","5098000" "11EXC-4521","EDNA ST","MARSTON AVE","JUDSON AVE","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","5097000" "11EXC-4521","FOERSTER ST","JUDSON AVE","","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","22225000" "11EXC-4521","FOERSTER ST","JUDSON AVE","SUNNYSIDE TER","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","5638001" "11EXC-4521","GENNESSEE ST","JUDSON AVE","","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","22235000" "11EXC-4521","GENNESSEE ST","JUDSON AVE","STAPLES AVE","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","6154000" "11EXC-4521","JUDSON AVE","CIRCULAR AVE \ DETROIT ST \ PAULDING ST","EDNA ST","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","7687000" "11EXC-4521","JUDSON AVE","EDNA ST","","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","22158000" "11EXC-4521","JUDSON AVE","EDNA ST","FOERSTER ST","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","7688000" "11EXC-4521","JUDSON AVE","FOERSTER ST","","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","22225000" "11EXC-4521","JUDSON AVE","FOERSTER ST","GENNESSEE ST","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","7689000" "11EXC-4521","JUDSON AVE","GENNESSEE ST","","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","22235000" "11EXC-4521","JUDSON AVE","GENNESSEE ST","PHELAN AVE","Excavation","Pacific Gas & Electric","Edna St. MWC 50 Project","2012-01-10 11:45:13","ACTIVE","7690000" "11EXC-4540","MARKET ST","ARGENT ALY","ARGENT ALY","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","8776206" "11EXC-4540","MARKET ST","ARGENT ALY","PORTOLA DR","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","8777101" "11EXC-4540","MARKET ST","ARGENT ALY","PORTOLA DR","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","8777201" "11EXC-4540","MARKET ST","DIXIE ALY","ARGENT ALY","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","8776105" "11EXC-4540","MARKET ST","ROMAIN ST","MORGAN ALY","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","8776103" "11EXC-4540","MARKET ST","SHORT ST","GRAND VIEW AVE \ STANTON ST \ YUKON ST","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","8776101" "11EXC-4540","PORTOLA DR","MARKET ST","BURNETT AVE \ DIAMOND HEIGHTS BLVD","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","10611101" "11EXC-4540","PORTOLA DR","MARKET ST","BURNETT AVE \ DIAMOND HEIGHTS BLVD","Excavation","Myers and Sons Construction","Bridge Preventive Maintenance Program Group C (Contract No. 1636J)","2011-11-04 14:19:47","ACTIVE","10611201" "11EXC-4544","BRANNAN ST","06TH ST \ I-280 NORTHBOUND \ I-280 SOUTHBOUND","HARRIET ST","Excavation","Pacific Gas & Electric","715 brannan st & harriet st","2012-01-11 08:42:06","APPROVED","3082000" "11EXC-4556","19TH AVE","LAWTON ST","MORAGA ST","Excavation","Pacific Gas & Electric","1650-19th Avenue","2011-12-16 12:56:11","APPROVED","913101" "11EXC-4599","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","30729000" "11EXC-4599","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","MISSION ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","2863000" "11EXC-4599","BEALE ST","MISSION ST","","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","24554000" "11EXC-4599","BEALE ST","MISSION ST","HOWARD ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","2864000" "11EXC-4599","DAVIS ST","BEALE ST \ MARKET ST \ PINE ST","","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","30729000" "11EXC-4599","FREMONT ST","FRONT ST \ MARKET ST","MISSION ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","5860000" "11EXC-4599","MAIN ST","MARKET ST","MISSION ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","8627000" "11EXC-4599","MARKET ST","BEALE ST \ DAVIS ST \ PINE ST","","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","30729000" "11EXC-4599","MISSION ST","BEALE ST","","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","24554000" "11EXC-4599","MISSION ST","BEALE ST","FREMONT ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","9086000" "11EXC-4599","MISSION ST","MAIN ST","BEALE ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","9085000" "11EXC-4599","PINE ST","BEALE ST \ DAVIS ST \ MARKET ST","","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","30729000" "11EXC-4599","PINE ST","BEALE ST \ DAVIS ST \ MARKET ST","FRONT ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","10453000" "11EXC-4599","SPEAR ST","MARKET ST","MISSION ST","Excavation","Pacific Gas & Electric","Beale St. GPRP Spot main","2011-11-23 09:16:08","ACTIVE","12044000" "11EXC-4620","03RD ST","HOWARD ST","CLEMENTINA ST","Excavation","Time Warner Telecom of California","201 Third Street Service Connection","2011-11-08 15:11:22","ACTIVE","168000" "11EXC-4624","BAY SHORE BLVD","CORTLAND AVE","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","21023000" "11EXC-4624","BAY SHORE BLVD","CORTLAND AVE","HILTON ST \ INDUSTRIAL ST ON RAMP","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2801201" "11EXC-4624","BAY SHORE BLVD","COSGROVE ST","CORTLAND AVE","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2800202" "11EXC-4624","BAY SHORE BLVD","COSTA ST","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","20825000" "11EXC-4624","BAY SHORE BLVD","COSTA ST","FAITH ST","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2799206" "11EXC-4624","BAY SHORE BLVD","END","COSTA ST","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2799205" "11EXC-4624","BAY SHORE BLVD","END","END","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2799105" "11EXC-4624","BAY SHORE BLVD","END","OAKDALE AVE","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2799106" "11EXC-4624","BAY SHORE BLVD","FAITH ST","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","33277000" "11EXC-4624","BAY SHORE BLVD","FAITH ST","OAKDALE AVE","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2799207" "11EXC-4624","BAY SHORE BLVD","FLOWER ST","CORTLAND AVE","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2800102" "11EXC-4624","BAY SHORE BLVD","OAKDALE AVE","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","20816000" "11EXC-4624","BAY SHORE BLVD","OAKDALE AVE","COSGROVE ST","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","2800201" "11EXC-4624","BAY SHORE BLVD","WATERLOO ST","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","21021000" "11EXC-4624","CORTLAND AVE","BAY SHORE BLVD","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","21023000" "11EXC-4624","COSTA ST","BAY SHORE BLVD","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","20825000" "11EXC-4624","FAITH ST","BAY SHORE BLVD","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","33277000" "11EXC-4624","FAITH ST","BAY SHORE BLVD","END","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","5400000" "11EXC-4624","OAKDALE AVE","BAY SHORE BLVD","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","20816000" "11EXC-4624","OAKDALE AVE","PATTERSON ST","BAY SHORE BLVD","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","9799000" "11EXC-4624","WATERLOO ST","BAY SHORE BLVD","","Excavation","Pacific Gas & Electric","Bayshore GPRP Project","2012-01-25 14:51:18","ACTIVE","21021000" "11EXC-4654","BOWDOIN ST","GAVEN ST","","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","20935000" "11EXC-4654","BOYLSTON ST","GAVEN ST","","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","20928000" "11EXC-4654","GAVEN ST","BOWDOIN ST","","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","20935000" "11EXC-4654","GAVEN ST","BOYLSTON ST","","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","20928000" "11EXC-4654","GAVEN ST","BOYLSTON ST","BOWDOIN ST","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","6035000" "11EXC-4654","GAVEN ST","MERRILL ST","BOYLSTON ST","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","6034000" "11EXC-4654","SWEENY ST","BOYLSTON ST","BOWDOIN ST","Excavation","Pacific Gas & Electric","Silver 2 MWC 50 Project","2011-12-29 10:57:24","ACTIVE","12350000" "11EXC-4655","MISSION ST","SPEAR ST","","Excavation","Pacific Gas & Electric","RELOCATE PG&E CONDUITS FOR NORTH SHORE FORCE MAIN PROJECT","2011-11-10 13:20:14","ACTIVE","24555000" "11EXC-4655","SPEAR ST","MARKET ST","MISSION ST","Excavation","Pacific Gas & Electric","RELOCATE PG&E CONDUITS FOR NORTH SHORE FORCE MAIN PROJECT","2011-11-10 13:20:14","ACTIVE","12044000" "11EXC-4655","SPEAR ST","MISSION ST","","Excavation","Pacific Gas & Electric","RELOCATE PG&E CONDUITS FOR NORTH SHORE FORCE MAIN PROJECT","2011-11-10 13:20:14","ACTIVE","24555000" "11EXC-4655","SPEAR ST","MISSION ST","HOWARD ST","Excavation","Pacific Gas & Electric","RELOCATE PG&E CONDUITS FOR NORTH SHORE FORCE MAIN PROJECT","2011-11-10 13:20:14","ACTIVE","12045000" "11EXC-4670","TURK ST","PIERCE ST","SCOTT ST","Excavation","Pacific Gas & Electric","Creative Arts Charter School","2012-01-09 09:27:23","APPROVED","12731000" "11EXC-4671","19TH AVE","RIVERA ST","SANTIAGO ST","Excavation","SBC - Pacific Bell Engineering","Install conduit","2011-11-14 07:41:45","ACTIVE","919101" "11EXC-4671","19TH AVE","SANTIAGO ST","","Excavation","SBC - Pacific Bell Engineering","Install conduit","2011-11-14 07:41:45","ACTIVE","23196000" "11EXC-4671","SANTIAGO ST","19TH AVE","","Excavation","SBC - Pacific Bell Engineering","Install conduit","2011-11-14 07:41:45","ACTIVE","23196000" "11EXC-4678","PARKER AVE","TURK BLVD","GOLDEN GATE AVE","Excavation","Pacific Gas & Electric","IFO 530-532 Parker Avenue. ","2012-01-13 14:59:49","APPROVED","10278000" "11EXC-4703","GOLD MINE DR","JADE PL","","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","22035000" "11EXC-4703","GOLD MINE DR","OPALO LN","","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","33499000" "11EXC-4703","GOLD MINE DR","OPALO LN","JADE PL","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","6254000" "11EXC-4703","GOLD MINE DR","ORA WAY","","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","22034000" "11EXC-4703","GOLD MINE DR","ORA WAY","OPALO LN","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","6253000" "11EXC-4703","JADE PL","GOLD MINE DR","","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","22035000" "11EXC-4703","OPALO LN","GOLD MINE DR","","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","33499000" "11EXC-4703","ORA WAY","GOLD MINE DR","","Excavation","San Francisco Water Department","south side goldmine drive, between jade place, opalo, & ora way including intersections.","2011-11-21 08:45:25","APPROVED","22034000" "11EXC-4777","01ST ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24532000" "11EXC-4777","02ND ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24540000" "11EXC-4777","03RD ST","CLEMENTINA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24587000" "11EXC-4777","03RD ST","CLEMENTINA ST","FOLSOM ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","169000" "11EXC-4777","03RD ST","FOLSOM ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24583000" "11EXC-4777","03RD ST","FOLSOM ST","SAINT FRANCIS PL","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","170000" "11EXC-4777","03RD ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24590000" "11EXC-4777","03RD ST","HOWARD ST","CLEMENTINA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","168000" "11EXC-4777","04TH ST","FOLSOM ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23938000" "11EXC-4777","04TH ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24627000" "11EXC-4777","05TH ST","I-280 N OFF RAMP \ I-280 S ON RAMP \ KING ST","BERRY ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","310000" "11EXC-4777","06TH ST","CLARA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23922000" "11EXC-4777","06TH ST","CLARA ST","HARRISON ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","337000" "11EXC-4777","06TH ST","CLEMENTINA ST","FOLSOM ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","334000" "11EXC-4777","06TH ST","FOLSOM ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23941000" "11EXC-4777","06TH ST","FOLSOM ST","SHIPLEY ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","335000" "11EXC-4777","06TH ST","HARRISON ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23919000" "11EXC-4777","06TH ST","HARRISON ST","AHERN WAY","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","338000" "11EXC-4777","06TH ST","NATOMA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24282000" "11EXC-4777","06TH ST","NATOMA ST","HOWARD ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","331000" "11EXC-4777","06TH ST","SHIPLEY ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23933000" "11EXC-4777","06TH ST","SHIPLEY ST","CLARA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","336000" "11EXC-4777","07TH ST","CLEVELAND ST","HARRISON ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","373000" "11EXC-4777","07TH ST","HARRISON ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23929000" "11EXC-4777","08TH ST","BRANNAN ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23872000" "11EXC-4777","08TH ST","BRANNAN ST","TOWNSEND ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","417000" "11EXC-4777","08TH ST","BRYANT ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24199000" "11EXC-4777","08TH ST","BRYANT ST","BRANNAN ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","416000" "11EXC-4777","08TH ST","CLEMENTINA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24273000" "11EXC-4777","08TH ST","CLEMENTINA ST","FOLSOM ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","411000" "11EXC-4777","08TH ST","FOLSOM ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24272000" "11EXC-4777","08TH ST","FOLSOM ST","RINGOLD ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","412000" "11EXC-4777","08TH ST","GROVE ST \ HYDE ST \ MARKET ST","STEVENSON ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","404000" "11EXC-4777","08TH ST","HARRISON ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24201000" "11EXC-4777","08TH ST","HARRISON ST","I-80 W OFF RAMP","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","415000" "11EXC-4777","08TH ST","HERON ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24266000" "11EXC-4777","08TH ST","HERON ST","HARRISON ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","414000" "11EXC-4777","08TH ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24299000" "11EXC-4777","08TH ST","HOWARD ST","TEHAMA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","409000" "11EXC-4777","08TH ST","I-80 W OFF RAMP","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","50080000" "11EXC-4777","08TH ST","I-80 W OFF RAMP","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","50081000" "11EXC-4777","08TH ST","I-80 W OFF RAMP","BRYANT ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","415002" "11EXC-4777","08TH ST","I-80 W OFF RAMP","I-80 W OFF RAMP","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","415001" "11EXC-4777","08TH ST","MINNA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24310000" "11EXC-4777","08TH ST","MINNA ST","NATOMA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","407000" "11EXC-4777","08TH ST","MISSION ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24311000" "11EXC-4777","08TH ST","MISSION ST","MINNA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","406000" "11EXC-4777","08TH ST","NATOMA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24302000" "11EXC-4777","08TH ST","NATOMA ST","HOWARD ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","408000" "11EXC-4777","08TH ST","RINGOLD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24267000" "11EXC-4777","08TH ST","RINGOLD ST","HERON ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","413000" "11EXC-4777","08TH ST","STEVENSON ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24327000" "11EXC-4777","08TH ST","STEVENSON ST","MISSION ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","405000" "11EXC-4777","08TH ST","TEHAMA ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24298000" "11EXC-4777","08TH ST","TEHAMA ST","CLEMENTINA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","410000" "11EXC-4777","BEALE ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24506000" "11EXC-4777","BRANNAN ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23872000" "11EXC-4777","BRYANT ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24199000" "11EXC-4777","BUSH ST","KEARNY ST","SAINT GEORGE ALY","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","3427000" "11EXC-4777","CLARA ST","06TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23922000" "11EXC-4777","CLEMENTINA ST","03RD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24587000" "11EXC-4777","CLEMENTINA ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24273000" "11EXC-4777","FALMOUTH ST","FOLSOM ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23936000" "11EXC-4777","FOLSOM ST","03RD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24583000" "11EXC-4777","FOLSOM ST","03RD ST","MABINI ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","5662000" "11EXC-4777","FOLSOM ST","04TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23938000" "11EXC-4777","FOLSOM ST","05TH ST","FALMOUTH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","5665000" "11EXC-4777","FOLSOM ST","06TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23941000" "11EXC-4777","FOLSOM ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24272000" "11EXC-4777","FOLSOM ST","FALMOUTH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23936000" "11EXC-4777","FOLSOM ST","FALMOUTH ST","06TH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","5666000" "11EXC-4777","FOLSOM ST","MABINI ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24586000" "11EXC-4777","FOLSOM ST","MABINI ST","04TH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","5663000" "11EXC-4777","FREMONT ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24527000" "11EXC-4777","FREMONT ST","HOWARD ST","I-80 W OFF RAMP","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","5863000" "11EXC-4777","FREMONT ST","NATOMA ST","HOWARD ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","5862000" "11EXC-4777","HARRISON ST","06TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23919000" "11EXC-4777","HARRISON ST","07TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23929000" "11EXC-4777","HARRISON ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24201000" "11EXC-4777","HARRISON ST","SHERMAN ST","07TH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","6727000" "11EXC-4777","HAWTHORNE ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24595000" "11EXC-4777","HAWTHORNE ST","HOWARD ST","FOLSOM ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","6809000" "11EXC-4777","HERON ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24266000" "11EXC-4777","HOWARD ST","01ST ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24532000" "11EXC-4777","HOWARD ST","01ST ST","MALDEN ALY","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7033000" "11EXC-4777","HOWARD ST","02ND ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24540000" "11EXC-4777","HOWARD ST","02ND ST","NEW MONTGOMERY ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7035000" "11EXC-4777","HOWARD ST","03RD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24590000" "11EXC-4777","HOWARD ST","03RD ST","04TH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7038000" "11EXC-4777","HOWARD ST","04TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24627000" "11EXC-4777","HOWARD ST","04TH ST","05TH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7039001" "11EXC-4777","HOWARD ST","05TH ST","MARY ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7041000" "11EXC-4777","HOWARD ST","06TH ST","HARRIET ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7043000" "11EXC-4777","HOWARD ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24299000" "11EXC-4777","HOWARD ST","BEALE ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24506000" "11EXC-4777","HOWARD ST","BEALE ST","FREMONT ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7031000" "11EXC-4777","HOWARD ST","FREMONT ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24527000" "11EXC-4777","HOWARD ST","FREMONT ST","01ST ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7032000" "11EXC-4777","HOWARD ST","HAWTHORNE ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24595000" "11EXC-4777","HOWARD ST","HAWTHORNE ST","03RD ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7037000" "11EXC-4777","HOWARD ST","MALDEN ALY","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24541000" "11EXC-4777","HOWARD ST","MALDEN ALY","02ND ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7034000" "11EXC-4777","HOWARD ST","MARY ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23947000" "11EXC-4777","HOWARD ST","MARY ST","06TH ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7042000" "11EXC-4777","HOWARD ST","NEW MONTGOMERY ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24596000" "11EXC-4777","HOWARD ST","NEW MONTGOMERY ST","HAWTHORNE ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7036000" "11EXC-4777","HOWARD ST","SPEAR ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24547000" "11EXC-4777","HOWARD ST","SPEAR ST","MAIN ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7029000" "11EXC-4777","HOWARD ST","STEUART ST","SPEAR ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7028000" "11EXC-4777","I-80 W OFF RAMP","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","50080000" "11EXC-4777","I-80 W OFF RAMP","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","50081000" "11EXC-4777","KEARNY ST","PINE ST","CALIFORNIA ST","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7754000" "11EXC-4777","KING ST","04TH ST","05TH ST \ I-280 N OFF RAMP \ I-280 S ON RAMP","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","7834101" "11EXC-4777","MABINI ST","FOLSOM ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24586000" "11EXC-4777","MALDEN ALY","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24541000" "11EXC-4777","MARY ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23947000" "11EXC-4777","MINNA ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24310000" "11EXC-4777","MISSION ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24311000" "11EXC-4777","NATOMA ST","06TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24282000" "11EXC-4777","NATOMA ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24302000" "11EXC-4777","NEW MONTGOMERY ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24596000" "11EXC-4777","RINGOLD ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24267000" "11EXC-4777","SHIPLEY ST","06TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","23933000" "11EXC-4777","SPEAR ST","HOWARD ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24547000" "11EXC-4777","STEVENSON ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24327000" "11EXC-4777","TEHAMA ST","08TH ST","","Excavation","Ghilotti Bros. Construction","Parking Guidance System and Pavement Renovation (Contract No. 1500J)","2011-12-30 16:02:21","APPROVED","24298000" "11EXC-4813","20TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Pacific Gas & Electric","2371 20th Avenue, San Francisco","2012-01-09 09:44:51","APPROVED","1016000" "11EXC-4821","ASHBURY ST","WALLER ST","FREDERICK ST","Excavation","Cable Com of California Inc","755 ASHBURY ST","2011-11-22 14:48:59","ACTIVE","2514000" "11EXC-4825","DIVISADERO ST","CLAY ST","WASHINGTON ST","Excavation","Pacific Gas & Electric","2229 DIVISADERO STREET, SF","2012-01-05 12:04:57","APPROVED","4819000" "11EXC-4832","CLAYTON ST","CORBETT AVE","","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","26193000" "11EXC-4832","CORBETT AVE","CLAYTON ST","","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","26193000" "11EXC-4832","CORBETT AVE","CLAYTON ST","IRON ALY","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","4384000" "11EXC-4832","CORBETT AVE","COPPER ALY","GRAYSTONE TER","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","4386000" "11EXC-4832","CORBETT AVE","GRAYSTONE TER","","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","26108000" "11EXC-4832","CORBETT AVE","IRON ALY","","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","26183000" "11EXC-4832","CORBETT AVE","IRON ALY","COPPER ALY","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","4385000" "11EXC-4832","GRAYSTONE TER","CORBETT AVE","","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","26108000" "11EXC-4832","IRON ALY","CORBETT AVE","","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","26183000" "11EXC-4832","IRON ALY","CORBETT AVE","GRAYSTONE TER","Excavation","Pacific Gas & Electric","Corbett GPRP Project","2011-11-23 08:10:56","ACTIVE","7276000" "11EXC-4864","14TH ST","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25835000" "11EXC-4864","17TH ST","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25690000" "11EXC-4864","18TH ST","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25677000" "11EXC-4864","BROSNAN ST","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25843000" "11EXC-4864","CAMP ST","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25700000" "11EXC-4864","CLINTON PARK","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25844000" "11EXC-4864","CLINTON PARK","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","33026000" "11EXC-4864","DORLAND ST","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25689000" "11EXC-4864","DUBOCE AVE","GUERRERO ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25860000" "11EXC-4864","GUERRERO ST","14TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25835000" "11EXC-4864","GUERRERO ST","14TH ST","15TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6576201" "11EXC-4864","GUERRERO ST","14TH ST","ROSA PARKS LN","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6576102" "11EXC-4864","GUERRERO ST","15TH ST","16TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6577101" "11EXC-4864","GUERRERO ST","15TH ST","16TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6577201" "11EXC-4864","GUERRERO ST","16TH ST","17TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6578201" "11EXC-4864","GUERRERO ST","16TH ST","CAMP ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6578101" "11EXC-4864","GUERRERO ST","17TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25690000" "11EXC-4864","GUERRERO ST","17TH ST","18TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6579101" "11EXC-4864","GUERRERO ST","17TH ST","DORLAND ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6579201" "11EXC-4864","GUERRERO ST","18TH ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25677000" "11EXC-4864","GUERRERO ST","18TH ST","19TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6580101" "11EXC-4864","GUERRERO ST","18TH ST","19TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6580201" "11EXC-4864","GUERRERO ST","BROSNAN ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25843000" "11EXC-4864","GUERRERO ST","BROSNAN ST","14TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6575103" "11EXC-4864","GUERRERO ST","CAMP ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25700000" "11EXC-4864","GUERRERO ST","CAMP ST","17TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6578102" "11EXC-4864","GUERRERO ST","CLINTON PARK","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25844000" "11EXC-4864","GUERRERO ST","CLINTON PARK","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","33026000" "11EXC-4864","GUERRERO ST","CLINTON PARK","14TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6575202" "11EXC-4864","GUERRERO ST","CLINTON PARK","BROSNAN ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6575102" "11EXC-4864","GUERRERO ST","DORLAND ST","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25689000" "11EXC-4864","GUERRERO ST","DORLAND ST","18TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6579202" "11EXC-4864","GUERRERO ST","DUBOCE AVE","","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","25860000" "11EXC-4864","GUERRERO ST","DUBOCE AVE","CLINTON PARK","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6575101" "11EXC-4864","GUERRERO ST","DUBOCE AVE","CLINTON PARK","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6575201" "11EXC-4864","GUERRERO ST","LAGUNA ST \ MARKET ST","DUBOCE AVE","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6574101" "11EXC-4864","GUERRERO ST","LAGUNA ST \ MARKET ST","DUBOCE AVE","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6574201" "11EXC-4864","GUERRERO ST","ROSA PARKS LN","15TH ST","Excavation","Esquivel Grading & Paving, Inc.","Guerrero Street Pavement Renovation Phase 1 Project (Contract No. 1764J)","2011-11-23 10:01:44","APPROVED","6576103" "11EXC-4866","PAGE ST","BRODERICK ST","BAKER ST","Excavation","Pacific Gas & Electric","1140 Page St, San Francisco","2012-01-03 11:51:08","APPROVED","10180000" "11EXC-4931","PALOU AVE","KEITH ST","LANE ST","Excavation","Pacific Gas & Electric","1411 Palou Ave.","2011-12-05 08:09:27","APPROVED","10221000" "11EXC-4932","15TH AVE","ANZA ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27478000" "11EXC-4932","15TH AVE","ANZA ST","BALBOA ST","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","610000" "11EXC-4932","15TH AVE","BALBOA ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27474000" "11EXC-4932","15TH AVE","BALBOA ST","CABRILLO ST","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","611000" "11EXC-4932","15TH AVE","CABRILLO ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27450000" "11EXC-4932","15TH AVE","CABRILLO ST","FULTON ST","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","612000" "11EXC-4932","15TH AVE","CALIFORNIA ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27623000" "11EXC-4932","15TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","606000" "11EXC-4932","15TH AVE","CLEMENT ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27489000" "11EXC-4932","15TH AVE","CLEMENT ST","TACOMA ST","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","607000" "11EXC-4932","15TH AVE","FULTON ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27449000" "11EXC-4932","15TH AVE","GEARY BLVD","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27486000" "11EXC-4932","15TH AVE","GEARY BLVD","ANZA ST","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","609000" "11EXC-4932","15TH AVE","TACOMA ST","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27488000" "11EXC-4932","15TH AVE","TACOMA ST","GEARY BLVD","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","608000" "11EXC-4932","ANZA ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27478000" "11EXC-4932","BALBOA ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27474000" "11EXC-4932","CABRILLO ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27450000" "11EXC-4932","CALIFORNIA ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27623000" "11EXC-4932","CLEMENT ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27489000" "11EXC-4932","FULTON ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27449000" "11EXC-4932","GEARY BLVD","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27486000" "11EXC-4932","TACOMA ST","15TH AVE","","Excavation","Esquivel Grading & Paving, Inc.","15th Avenue Pavement Renovation (Contract No. 1680J)","2011-11-30 11:00:55","APPROVED","27488000" "11EXC-4955","FOLSOM ST","ECKER ST","ESSEX ST","Excavation","Pacific Gas & Electric","25 Essex Street","2012-01-25 07:59:34","APPROVED","5658000" "11EXC-4962","LISBON ST","FRANCE AVE","ITALY AVE","Excavation","Pacific Gas & Electric","619 LISBON","2011-12-07 10:51:20","APPROVED","8411000" "11EXC-4964","AMAZON AVE","ATHENS ST","","Excavation","Pacific Gas & Electric","Athens St.(Amazon to Italy Aves.)Part of Geneva 1 GPRP","2011-12-02 15:13:02","ACTIVE","21406000" "11EXC-4964","ATHENS ST","AMAZON AVE","","Excavation","Pacific Gas & Electric","Athens St.(Amazon to Italy Aves.)Part of Geneva 1 GPRP","2011-12-02 15:13:02","ACTIVE","21406000" "11EXC-4964","ATHENS ST","FRANCE AVE","ITALY AVE","Excavation","Pacific Gas & Electric","Athens St.(Amazon to Italy Aves.)Part of Geneva 1 GPRP","2011-12-02 15:13:02","ACTIVE","2539000" "11EXC-4964","ATHENS ST","ITALY AVE","","Excavation","Pacific Gas & Electric","Athens St.(Amazon to Italy Aves.)Part of Geneva 1 GPRP","2011-12-02 15:13:02","ACTIVE","21401000" "11EXC-4964","ATHENS ST","ITALY AVE","AMAZON AVE","Excavation","Pacific Gas & Electric","Athens St.(Amazon to Italy Aves.)Part of Geneva 1 GPRP","2011-12-02 15:13:02","ACTIVE","2540000" "11EXC-4964","ITALY AVE","ATHENS ST","","Excavation","Pacific Gas & Electric","Athens St.(Amazon to Italy Aves.)Part of Geneva 1 GPRP","2011-12-02 15:13:02","ACTIVE","21401000" "11EXC-4979","JERROLD AVE","MENDELL ST","03RD ST \ NEWHALL ST","Excavation","Pacific Gas & Electric","1525 JERROLD AVENUE, SF","2012-01-09 13:17:36","APPROVED","7496000" "11EXC-5000","08TH AVE","FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27258000" "11EXC-5000","12TH AVE","FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27266000" "11EXC-5000","18TH AVE","FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27462000" "11EXC-5000","20TH AVE","FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27470000" "11EXC-5000","22ND AVE","FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27510000" "11EXC-5000","25TH AVE","CROSSOVER DR \ FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27519000" "11EXC-5000","CROSSOVER DR","25TH AVE \ FULTON ST","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27519000" "11EXC-5000","FULTON ST","08TH AVE","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27258000" "11EXC-5000","FULTON ST","12TH AVE","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27266000" "11EXC-5000","FULTON ST","18TH AVE","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27462000" "11EXC-5000","FULTON ST","20TH AVE","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27470000" "11EXC-5000","FULTON ST","22ND AVE","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27510000" "11EXC-5000","FULTON ST","25TH AVE \ CROSSOVER DR","","Excavation","Con-Quest Contractors, Inc.","5 Fulton Ductbank Construction Project (SFMTA Contract No. 1242)","2011-12-09 11:02:04","ACTIVE","27519000" "11EXC-5001","10TH ST","STEVENSON ST","","Excavation","Pacific Gas & Electric","1301-63 Market Street.","2012-01-09 14:19:45","APPROVED","24424000" "11EXC-5001","STEVENSON ST","10TH ST","","Excavation","Pacific Gas & Electric","1301-63 Market Street.","2012-01-09 14:19:45","APPROVED","24424000" "11EXC-5009","JERROLD AVE","DONAHUE ST","EARL ST","Excavation","Pacific Gas & Electric","A/F 172 JERROLD AVE.","2011-12-09 09:20:51","APPROVED","7495000" "11EXC-5023","39TH AVE","WAWONA ST","YORBA ST","Excavation","Pacific Gas & Electric","2747 39TH AVE","2012-01-18 14:49:43","APPROVED","1882000" "11EXC-5038","CONGO ST","FLOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22138000" "11EXC-5038","CONGO ST","FLOOD AVE","HEARST AVE","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","4334000" "11EXC-5038","FLOOD AVE","CONGO ST","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22138000" "11EXC-5038","GENNESSEE ST","HEARST AVE","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22244000" "11EXC-5038","GENNESSEE ST","HEARST AVE","MONTEREY BLVD","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","6157000" "11EXC-5038","GENNESSEE ST","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22245000" "11EXC-5038","GENNESSEE ST","MONTEREY BLVD","JOOST AVE","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","6158000" "11EXC-5038","HEARST AVE","FOERSTER ST","GENNESSEE ST","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","6866000" "11EXC-5038","HEARST AVE","GENNESSEE ST","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22244000" "11EXC-5038","HEARST AVE","RIDGEWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22254000" "11EXC-5038","MONTEREY BLVD","FOERSTER ST","GENNESSEE ST","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","9278101" "11EXC-5038","MONTEREY BLVD","FOERSTER ST","GENNESSEE ST","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","9278201" "11EXC-5038","MONTEREY BLVD","GENNESSEE ST","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22245000" "11EXC-5038","MONTEREY BLVD","GENNESSEE ST","RIDGEWOOD AVE","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","9279101" "11EXC-5038","MONTEREY BLVD","GENNESSEE ST","RIDGEWOOD AVE","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","9279201" "11EXC-5038","MONTEREY BLVD","RIDGEWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22256000" "11EXC-5038","RIDGEWOOD AVE","HEARST AVE","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22254000" "11EXC-5038","RIDGEWOOD AVE","HEARST AVE","MONTEREY BLVD","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","11028000" "11EXC-5038","RIDGEWOOD AVE","MONTEREY BLVD","","Excavation","Pacific Gas & Electric","Monterey 7 MWC 14 Project","2012-02-01 15:09:50","ACTIVE","22256000" "11EXC-5041","PRAGUE ST","PERSIA AVE","RUSSIA AVE","Excavation","Pacific Gas & Electric","IFO 267 PRAGUE ST.","2011-12-09 09:39:41","APPROVED","10730000" "11EXC-5043","BROOKLYN PL","SACRAMENTO ST","END","Excavation","Pacific Gas & Electric","738 STOCKTON","2011-12-12 10:42:58","APPROVED","3237000" "11EXC-5050","CONGO ST","END","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","33421000" "11EXC-5050","CONGO ST","END","MARTHA AVE","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","4341000" "11EXC-5050","CONGO ST","MANGELS AVE","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22272000" "11EXC-5050","CONGO ST","MARTHA AVE","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22264000" "11EXC-5050","CONGO ST","MARTHA AVE","BOSWORTH ST \ ELK ST","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","4342000" "11EXC-5050","CONGO ST","STILLINGS AVE","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22270000" "11EXC-5050","MANGELS AVE","CONGO ST","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22272000" "11EXC-5050","MARTHA AVE","CONGO ST","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22264000" "11EXC-5050","MARTHA AVE","STILLINGS AVE","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22265000" "11EXC-5050","MARTHA AVE","STILLINGS AVE","CONGO ST","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","8787000" "11EXC-5050","STILLINGS AVE","CONGO ST","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22270000" "11EXC-5050","STILLINGS AVE","MARTHA AVE","","Excavation","Pacific Gas & Electric","Congo #1 GPRP Project","2011-12-08 16:19:16","ACTIVE","22265000" "11EXC-5067","JONES ST","VALLEJO ST","","Excavation","A. Ruiz Construction Co.","Vallejo Street: From Jones to Leavenworth -- As needed Main Sewer Replacement-# 1 Projec.-- (Contract No. WW-488 / 1228J)","2011-12-08 15:32:00","APPROVED","25268000" "11EXC-5067","LEAVENWORTH ST","VALLEJO ST","","Excavation","A. Ruiz Construction Co.","Vallejo Street: From Jones to Leavenworth -- As needed Main Sewer Replacement-# 1 Projec.-- (Contract No. WW-488 / 1228J)","2011-12-08 15:32:00","APPROVED","25287000" "11EXC-5067","VALLEJO ST","JONES ST","","Excavation","A. Ruiz Construction Co.","Vallejo Street: From Jones to Leavenworth -- As needed Main Sewer Replacement-# 1 Projec.-- (Contract No. WW-488 / 1228J)","2011-12-08 15:32:00","APPROVED","25268000" "11EXC-5067","VALLEJO ST","JONES ST","LEAVENWORTH ST","Excavation","A. Ruiz Construction Co.","Vallejo Street: From Jones to Leavenworth -- As needed Main Sewer Replacement-# 1 Projec.-- (Contract No. WW-488 / 1228J)","2011-12-08 15:32:00","APPROVED","13103000" "11EXC-5067","VALLEJO ST","LEAVENWORTH ST","","Excavation","A. Ruiz Construction Co.","Vallejo Street: From Jones to Leavenworth -- As needed Main Sewer Replacement-# 1 Projec.-- (Contract No. WW-488 / 1228J)","2011-12-08 15:32:00","APPROVED","25287000" "11EXC-5095","COLE ST","WALLER ST","BEULAH ST","Excavation","San Francisco Water Department","714 Cole - FIRE","2012-01-18 08:34:01","APPROVED","4240000" "11EXC-5096","LEXINGTON ST","20TH ST","21ST ST","Excavation","San Francisco Water Department","347-349 Lexington - FIRE","2011-12-14 15:10:30","ACTIVE","8320000" "11EXC-5102","08TH AVE","NORIEGA ST","ORTEGA ST","Excavation","San Francisco Water Department","1864-1866 8th AVE","2011-12-16 08:35:10","APPROVED","401000" "11EXC-5104","29TH AVE","CABRILLO ST","FULTON ST","Excavation","San Francisco Water Department","850 29th Ave","2011-12-16 08:51:41","APPROVED","1613000" "11EXC-5105","48TH AVE","KIRKHAM ST","LAWTON ST","Excavation","Pacific Gas & Electric","Deactivate reg. station R-19","2012-01-23 11:41:53","APPROVED","2069000" "11EXC-5105","48TH AVE","LAWTON ST","","Excavation","Pacific Gas & Electric","Deactivate reg. station R-19","2012-01-23 11:41:53","APPROVED","27939000" "11EXC-5105","LAWTON ST","48TH AVE","","Excavation","Pacific Gas & Electric","Deactivate reg. station R-19","2012-01-23 11:41:53","APPROVED","27939000" "11EXC-5105","LAWTON ST","48TH AVE","GREAT HWY \ LA PLAYA","Excavation","Pacific Gas & Electric","Deactivate reg. station R-19","2012-01-23 11:41:53","APPROVED","8229000" "11EXC-5109","TURK ST","HYDE ST","DODGE ST","Excavation","Pacific Gas & Electric","416-420 Turk St","2012-01-23 14:26:12","APPROVED","12720000" "11EXC-5119","BUSH ST","CHATHAM PL","STOCKTON ST","Excavation","Pacific Gas & Electric","IFO 585 BUSH","2011-12-13 13:56:52","APPROVED","3432000" "11EXC-5121","VALLEJO ST","END","KEARNY ST","Excavation","Pacific Gas & Electric","IFO 470-72 VALLEJO","2011-12-13 14:08:17","APPROVED","13088000" "11EXC-5122","PINE ST","BRODERICK ST","BAKER ST","Excavation","Pacific Gas & Electric","IFO 2817 PINE","2011-12-13 14:18:40","APPROVED","10491000" "11EXC-5125","25TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","Pacific Gas & Electric","IFO 326 25TH AVE.","2011-12-13 14:24:08","APPROVED","1374000" "11EXC-5139","14TH ST","MINNA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24370000" "11EXC-5139","14TH ST","NATOMA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24368000" "11EXC-5139","17TH ST","DE HARO ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23753000" "11EXC-5139","17TH ST","RHODE ISLAND ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23771000" "11EXC-5139","18TH ST","CAPP ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24133000" "11EXC-5139","18TH ST","LEXINGTON ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24156000" "11EXC-5139","20TH ST","CAROLINA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23738000" "11EXC-5139","20TH ST","CAROLINA ST","DE HARO ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","1038000" "11EXC-5139","20TH ST","DE HARO ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23740000" "11EXC-5139","20TH ST","PENNSYLVANIA AVE","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23648000" "11EXC-5139","ADAIR ST","CAPP ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24366000" "11EXC-5139","ADAIR ST","SOUTH VAN NESS AVE","CAPP ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","2090000" "11EXC-5139","ALAMEDA ST","HENRY ADAMS ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23862000" "11EXC-5139","CAPP ST","18TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24133000" "11EXC-5139","CAPP ST","18TH ST","19TH ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","3675000" "11EXC-5139","CAPP ST","ADAIR ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24366000" "11EXC-5139","CAROLINA ST","20TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23738000" "11EXC-5139","DE HARO ST","17TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23753000" "11EXC-5139","DE HARO ST","17TH ST","MARIPOSA ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","4631000" "11EXC-5139","DE HARO ST","20TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23740000" "11EXC-5139","DE HARO ST","MARIPOSA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23752000" "11EXC-5139","HARRISON ST","SPEAR ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23606000" "11EXC-5139","HENRY ADAMS ST","ALAMEDA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23862000" "11EXC-5139","HENRY ADAMS ST","ALAMEDA ST","15TH ST \ KANSAS ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","6884000" "11EXC-5139","LEXINGTON ST","18TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24156000" "11EXC-5139","LEXINGTON ST","18TH ST","19TH ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","8318000" "11EXC-5139","MARIPOSA ST","DE HARO ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23752000" "11EXC-5139","MARIPOSA ST","RHODE ISLAND ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23770000" "11EXC-5139","MINNA ST","14TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24370000" "11EXC-5139","MINNA ST","14TH ST","15TH ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","9052000" "11EXC-5139","NATOMA ST","14TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","24368000" "11EXC-5139","NATOMA ST","14TH ST","15TH ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","9519000" "11EXC-5139","ORIZABA AVE","LAKEVIEW AVE","GARFIELD ST \ GRAFTON AVE","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","9994000" "11EXC-5139","PENNSYLVANIA AVE","19TH ST","20TH ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","10334000" "11EXC-5139","PENNSYLVANIA AVE","20TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23648000" "11EXC-5139","RHODE ISLAND ST","17TH ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23771000" "11EXC-5139","RHODE ISLAND ST","17TH ST","MARIPOSA ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","10996000" "11EXC-5139","RHODE ISLAND ST","MARIPOSA ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23770000" "11EXC-5139","SPEAR ST","FOLSOM ST","HARRISON ST","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","12047000" "11EXC-5139","SPEAR ST","HARRISON ST","","Excavation","Shaw Pipeline Inc.","Various Locations Sewer Replacement Contract No. 3 and Pavement Renovation (Contract No. WW-480)","2011-12-23 15:30:44","APPROVED","23606000" "11EXC-5142","42ND AVE","TARAVAL ST","ULLOA ST","Excavation","Pacific Gas & Electric","2478 42ND AVE","2011-12-15 13:37:20","APPROVED","1944000" "11EXC-5143","16TH AVE","TARAVAL ST","ULLOA ST","Excavation","Pacific Gas & Electric","2434 & 2439 16TH AVE","2011-12-15 13:56:08","APPROVED","693000" "11EXC-5146","11TH AVE","CLEMENT ST","","Excavation","SBC - Pacific Bell Engineering","7752476 R201 4C","2011-12-15 12:26:11","ACTIVE","27305000" "11EXC-5146","11TH AVE","CLEMENT ST","GEARY BLVD","Excavation","SBC - Pacific Bell Engineering","7752476 R201 4C","2011-12-15 12:26:11","ACTIVE","495000" "11EXC-5146","CLEMENT ST","11TH AVE","","Excavation","SBC - Pacific Bell Engineering","7752476 R201 4C","2011-12-15 12:26:11","ACTIVE","27305000" "11EXC-5146","CLEMENT ST","11TH AVE","12TH AVE","Excavation","SBC - Pacific Bell Engineering","7752476 R201 4C","2011-12-15 12:26:11","ACTIVE","4160000" "11EXC-5158","04TH ST","BRYANT ST \ I-80 E OFF RAMP","WELSH ST","Excavation","Pacific Gas & Electric","IFO 508 4TH ST","2011-12-16 11:49:09","APPROVED","262000" "11EXC-5159","04TH ST","BRANNAN ST","BLUXOME ST","Excavation","Pacific Gas & Electric","IFO 620 4TH ST","2011-12-16 12:08:51","APPROVED","265000" "11EXC-5160","BRANNAN ST","ZOE ST","04TH ST","Excavation","Pacific Gas & Electric","BRANNAN NORTH OF 4TH ST","2011-12-16 12:21:34","APPROVED","3079000" "11EXC-5162","ATHENS ST","PERSIA AVE","","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","21632000" "11EXC-5162","EDINBURG ST","PERSIA AVE","","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","21715000" "11EXC-5162","EDINBURG ST","PERSIA AVE","RUSSIA AVE","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","5090000" "11EXC-5162","PERSIA AVE","ATHENS ST","","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","21632000" "11EXC-5162","PERSIA AVE","EDINBURG ST","","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","21715000" "11EXC-5162","PERSIA AVE","EDINBURG ST","NAPLES ST","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","10368000" "11EXC-5162","PERSIA AVE","MADRID ST","EDINBURG ST","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","10367000" "11EXC-5162","PERSIA AVE","NAPLES ST","VIENNA ST","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","10369000" "11EXC-5162","PERSIA AVE","VIENNA ST","","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","21644000" "11EXC-5162","PERSIA AVE","VIENNA ST","ATHENS ST","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","10370000" "11EXC-5162","VIENNA ST","PERSIA AVE","","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","21644000" "11EXC-5162","VIENNA ST","PERSIA AVE","RUSSIA AVE","Excavation","Pacific Gas & Electric","Persia GPRP Project","2011-12-20 13:26:46","ACTIVE","13302000" "11EXC-5188","BYXBEE ST","GARFIELD ST","HOLLOWAY AVE","Excavation","Pacific Gas & Electric","TGRAM Replacement Project: 19th/Holloway","2011-12-19 08:06:41","APPROVED","3466000" "11EXC-5188","BYXBEE ST","HOLLOWAY AVE","","Excavation","Pacific Gas & Electric","TGRAM Replacement Project: 19th/Holloway","2011-12-19 08:06:41","APPROVED","22736000" "11EXC-5188","HOLLOWAY AVE","BYXBEE ST","","Excavation","Pacific Gas & Electric","TGRAM Replacement Project: 19th/Holloway","2011-12-19 08:06:41","APPROVED","22736000" "11EXC-5190","FOERSTER ST","MANGELS AVE","","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","22349000" "11EXC-5190","MANGELS AVE","EDNA ST","FOERSTER ST","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","8652000" "11EXC-5190","MANGELS AVE","FOERSTER ST","","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","22349000" "11EXC-5190","MELROSE AVE","DETROIT ST","TERESITA BLVD","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","8947000" "11EXC-5190","MELROSE AVE","TERESITA BLVD","","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","22290000" "11EXC-5190","STILLINGS AVE","DETROIT ST \ VISTA VERDE CT","TERESITA BLVD","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","12191000" "11EXC-5190","STILLINGS AVE","TERESITA BLVD","","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","22293000" "11EXC-5190","TERESITA BLVD","LOS PALMOS DR","STILLINGS AVE","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","12516000" "11EXC-5190","TERESITA BLVD","MELROSE AVE","","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","22290000" "11EXC-5190","TERESITA BLVD","MELROSE AVE","EDNA ST","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","12518000" "11EXC-5190","TERESITA BLVD","STILLINGS AVE","","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","22293000" "11EXC-5190","TERESITA BLVD","STILLINGS AVE","MELROSE AVE","Excavation","Pacific Gas & Electric","Joost GPRP Project","2011-12-20 14:07:19","ACTIVE","12517000" "11EXC-5196","ARGUELLO BLVD","FREDERICK ST \ LINCOLN WAY","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","27178000" "11EXC-5196","ARGUELLO BLVD","FREDERICK ST \ LINCOLN WAY","HUGO ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","2432000" "11EXC-5196","ASHBURY ST","FULTON ST \ HEMWAY TER","GROVE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","2508000" "11EXC-5196","ASHBURY ST","GROVE ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26380000" "11EXC-5196","ASHBURY ST","GROVE ST","HAYES ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","2509000" "11EXC-5196","ASHBURY ST","OAK ST","PAGE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","2511000" "11EXC-5196","ASHBURY ST","PAGE ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26343000" "11EXC-5196","ASHBURY ST","PAGE ST","HAIGHT ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","2512000" "11EXC-5196","BAY ST","KEARNY ST","MIDWAY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","2772000" "11EXC-5196","BAY ST","MIDWAY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25407000" "11EXC-5196","BRODERICK ST","FELL ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26058000" "11EXC-5196","BRODERICK ST","FELL ST","HAYES ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","3191000" "11EXC-5196","BRODERICK ST","OAK ST","FELL ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","3190000" "11EXC-5196","COLE ST","FELL ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26422000" "11EXC-5196","COLE ST","HAYES ST","FELL ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","4236000" "11EXC-5196","ELLIS ST","PIERCE ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26612000" "11EXC-5196","ELLIS ST","PIERCE ST","SCOTT ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5189000" "11EXC-5196","ELLIS ST","STEINER ST","PIERCE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5188000" "11EXC-5196","FELL ST","BRODERICK ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26058000" "11EXC-5196","FELL ST","BRODERICK ST","BAKER ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5452000" "11EXC-5196","FELL ST","CLAYTON ST","COLE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5458000" "11EXC-5196","FELL ST","COLE ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26422000" "11EXC-5196","FELL ST","DIVISADERO ST","BRODERICK ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5451000" "11EXC-5196","FELL ST","PIERCE ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26039000" "11EXC-5196","FELL ST","PIERCE ST","SCOTT ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5449000" "11EXC-5196","FELL ST","STEINER ST","PIERCE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5448000" "11EXC-5196","FRANCISCO ST","KEARNY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25385000" "11EXC-5196","FRANCISCO ST","MASON ST","TAYLOR ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5762000" "11EXC-5196","FRANCISCO ST","MONTGOMERY ST","KEARNY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5754000" "11EXC-5196","FRANCISCO ST","TAYLOR ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25523000" "11EXC-5196","FRANCISCO ST","TAYLOR ST","COLUMBUS AVE","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5763000" "11EXC-5196","FRANKLIN ST","ELM ST","TURK ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5809000" "11EXC-5196","FRANKLIN ST","HAYES ST","IVY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5802000" "11EXC-5196","FRANKLIN ST","IVY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","24471000" "11EXC-5196","FRANKLIN ST","IVY ST","GROVE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5803000" "11EXC-5196","FRANKLIN ST","TURK ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25185000" "11EXC-5196","FRANKLIN ST","TURK ST","LARCH ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5810000" "11EXC-5196","FREDERICK ST","ARGUELLO BLVD \ LINCOLN WAY","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","27178000" "11EXC-5196","FREDERICK ST","WILLARD ST","ARGUELLO BLVD \ LINCOLN WAY","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","5855000" "11EXC-5196","GOUGH ST","ASH ST","MCALLISTER ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6323000" "11EXC-5196","GOUGH ST","HICKORY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25915000" "11EXC-5196","GOUGH ST","HICKORY ST","FELL ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6316000" "11EXC-5196","GOUGH ST","LILY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25905000" "11EXC-5196","GOUGH ST","LILY ST","OAK ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6314000" "11EXC-5196","GOUGH ST","MCALLISTER ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25941000" "11EXC-5196","GOUGH ST","OAK ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25906000" "11EXC-5196","GOUGH ST","OAK ST","HICKORY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6315000" "11EXC-5196","GOUGH ST","PAGE ST","LILY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6313000" "11EXC-5196","GROVE ST","ASHBURY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26380000" "11EXC-5196","GROVE ST","ASHBURY ST","CLAYTON ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6570000" "11EXC-5196","GROVE ST","MASONIC AVE","ASHBURY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6569000" "11EXC-5196","HICKORY ST","FRANKLIN ST","GOUGH ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6899000" "11EXC-5196","HICKORY ST","GOUGH ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25915000" "11EXC-5196","HICKORY ST","GOUGH ST","OCTAVIA ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","6900001" "11EXC-5196","IVY ST","FRANKLIN ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","24471000" "11EXC-5196","IVY ST","FRANKLIN ST","GOUGH ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","7349000" "11EXC-5196","KEARNY ST","FRANCISCO ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25385000" "11EXC-5196","KEARNY ST","FRANCISCO ST","BAY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","7775000" "11EXC-5196","LILY ST","FRANKLIN ST","GOUGH ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","8334000" "11EXC-5196","LILY ST","GOUGH ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25905000" "11EXC-5196","LILY ST","GOUGH ST","OCTAVIA ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","8335000" "11EXC-5196","LINCOLN WAY","ARGUELLO BLVD \ FREDERICK ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","27178000" "11EXC-5196","MASONIC AVE","OAK ST","PAGE ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","8853000" "11EXC-5196","MASONIC AVE","PAGE ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26344000" "11EXC-5196","MASONIC AVE","PAGE ST","HAIGHT ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","8854000" "11EXC-5196","MCALLISTER ST","FRANKLIN ST","GOUGH ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","8896000" "11EXC-5196","MCALLISTER ST","GOUGH ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25941000" "11EXC-5196","MIDWAY ST","BAY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25407000" "11EXC-5196","MIDWAY ST","FRANCISCO ST","BAY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","9020000" "11EXC-5196","OAK ST","GOUGH ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25906000" "11EXC-5196","OAK ST","GOUGH ST","OCTAVIA ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","9752000" "11EXC-5196","PAGE ST","ASHBURY ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26343000" "11EXC-5196","PAGE ST","ASHBURY ST","CLAYTON ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","10185000" "11EXC-5196","PAGE ST","CENTRAL AVE","MASONIC AVE","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","10183000" "11EXC-5196","PAGE ST","MASONIC AVE","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26344000" "11EXC-5196","PAGE ST","MASONIC AVE","ASHBURY ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","10184000" "11EXC-5196","PIERCE ST","EDDY ST","ELLIS ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","10428000" "11EXC-5196","PIERCE ST","ELLIS ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26612000" "11EXC-5196","PIERCE ST","ELLIS ST","OFARRELL ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","10429000" "11EXC-5196","PIERCE ST","FELL ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","26039000" "11EXC-5196","PIERCE ST","FELL ST","HAYES ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","10422000" "11EXC-5196","TAYLOR ST","CHESTNUT ST \ COLUMBUS AVE","WATER ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","12460000" "11EXC-5196","TAYLOR ST","FRANCISCO ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25523000" "11EXC-5196","TAYLOR ST","WATER ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25522000" "11EXC-5196","TAYLOR ST","WATER ST","FRANCISCO ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","12461000" "11EXC-5196","TURK ST","FRANKLIN ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25185000" "11EXC-5196","TURK ST","FRANKLIN ST","GOUGH ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","12725000" "11EXC-5196","TURK ST","VAN NESS AVE","FRANKLIN ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","12724000" "11EXC-5196","WATER ST","MASON ST","TAYLOR ST","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","13454000" "11EXC-5196","WATER ST","TAYLOR ST","","Excavation","Precision Engineering, Inc.","Proposition K: Various Locations Curb Rmps (Contract No. 1790J)Fell/Frederick/Page/Grove/Ellis/Taylor/Kearny/Bay/ MaCallister/Hickory/Oak/Lily/Turk/Ivy Streets","2011-12-22 09:22:13","APPROVED","25522000" "11EXC-5199","19TH AVE","TARAVAL ST","ULLOA ST","Excavation","Pacific Gas & Electric","19TH AVE JUST SOUTH OF TARAVAL","2011-12-19 08:56:30","APPROVED","921201" "11EXC-5200","47TH AVE","WAWONA ST","","Excavation","Pacific Gas & Electric","Intersection Of WAWONA & 47TH AVE","2011-12-19 09:38:40","APPROVED","23492000" "11EXC-5200","WAWONA ST","47TH AVE","","Excavation","Pacific Gas & Electric","Intersection Of WAWONA & 47TH AVE","2011-12-19 09:38:40","APPROVED","23492000" "11EXC-5201","CAINE AVE","RIDGE LN","LAKEVIEW AVE","Excavation","Pacific Gas & Electric","62 CAINE","2011-12-19 09:30:28","APPROVED","3518000" "11EXC-5210","JACKSON ST","SAINT LOUIS ALY","","Excavation","Pacific Gas & Electric","IFO 724 JACKSON","2011-12-21 08:47:52","APPROVED","25024000" "11EXC-5210","SAINT LOUIS ALY","JACKSON ST","","Excavation","Pacific Gas & Electric","IFO 724 JACKSON","2011-12-21 08:47:52","APPROVED","25024000" "11EXC-5224","WASHINGTON ST","TAYLOR ST","JONES ST","Excavation","San Francisco Water Department","1245 Washington - FIRE, renew for construction see 2095, see 2778 renew for final paving","2011-12-22 16:06:24","APPROVED","13425000" "11EXC-5230","NATOMA ST","08TH ST","09TH ST","Excavation","Pacific Gas & Electric","718 Natoma St.","2011-12-20 09:34:03","APPROVED","9515000" "11EXC-5235","28TH AVE","RIVERA ST","SANTIAGO ST","Excavation","Pacific Gas & Electric","2274 28TH AVE.","2011-12-21 09:01:40","APPROVED","1593000" "11EXC-5241","28TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Pacific Gas & Electric","2327 28TH AVE","2011-12-21 09:08:12","APPROVED","1594000" "11EXC-5246","10TH ST","MINNA ST","NATOMA ST","Excavation","Pacific Gas & Electric","151-10th St.","2012-01-06 14:18:55","APPROVED","485000" "11EXC-5256","SOMERSET ST","SILVER AVE","SILLIMAN ST","Excavation","San Francisco Water Department","1390 Silver Ave (On Somerset south of Silver) - FIRE","2011-12-23 08:53:03","APPROVED","11966000" "11EXC-5258","GEARY ST","TAYLOR ST","SHANNON ST","Excavation","Cable Com of California Inc","501 GEARY ST","2011-12-23 09:02:32","APPROVED","6112000" "11EXC-5259","18TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Pacific Gas & Electric","2323 18th Ave","2011-12-23 14:47:28","APPROVED","845000" "11EXC-5260","OFARRELL ST","TAYLOR ST","SHANNON ST","Excavation","Cable Com of California Inc","405 TAYLOR ST","2011-12-23 09:18:14","APPROVED","9727000" "11EXC-5262","BRANNAN ST","COLIN P KELLY JR ST","02ND ST","Excavation","Cable Com of California Inc","270 BRANNAN ST","2011-12-23 09:30:51","APPROVED","3073000" "11EXC-5263","SANTIAGO ST","17TH AVE","18TH AVE","Excavation","Pacific Gas & Electric","650 Santiago St","2011-12-23 14:53:55","APPROVED","11609000" "11EXC-5272","FOLSOM ST","19TH ST","20TH ST","Excavation","San Francisco Water Department","2374-2376 Folsom -FIRE","2011-12-23 12:06:35","APPROVED","5694000" "11EXC-5277","19TH AVE","PACHECO ST","QUINTARA ST","Excavation","Pacific Gas & Electric","W/side 19th Ave, N of Quintara St","2011-12-23 14:58:53","APPROVED","917201" "11EXC-5279","CALIFORNIA ST","DRUMM ST","","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","30049000" "11EXC-5279","DRUMM ST","CALIFORNIA ST","","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","30049000" "11EXC-5279","DRUMM ST","CALIFORNIA ST","SACRAMENTO ST","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","4970000" "11EXC-5279","DRUMM ST","SACRAMENTO ST","","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","24574000" "11EXC-5279","SACRAMENTO ST","DRUMM ST","","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","24574000" "11EXC-5279","SACRAMENTO ST","DRUMM ST","DAVIS ST","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","11220000" "11EXC-5279","SPEAR ST","MISSION ST","HOWARD ST","Excavation","Engineering Associates","Utility Relocation (North Shore Force Main Project)","2012-01-12 08:53:54","ACTIVE","12045000" "11EXC-5280","18TH AVE","QUINTARA ST","RIVERA ST","Excavation","Pacific Gas & Electric","2151 18th Ave","2011-12-23 15:12:11","APPROVED","843000" "11EXC-5282","CALIFORNIA ST","18TH AVE","19TH AVE","Excavation","San Francisco Water Department","5625-5627 California","2011-12-23 12:24:43","APPROVED","3595000" "11EXC-5283","CASA WAY","RETIRO WAY","AVILA ST \ MARINA BLVD","Excavation","San Francisco Water Department","31 Casa Way - FIRE","2011-12-23 12:37:07","APPROVED","3750000" "11EXC-5284","CHESTNUT ST","BAKER ST","LYON ST","Excavation","San Francisco Water Department","2600 Chestnut","2011-12-23 13:51:47","APPROVED","3986000" "11EXC-5286","FRANCISCO ST","LEAVENWORTH ST","HYDE ST","Excavation","San Francisco Water Department","807 Francisco - FIRE","2011-12-23 13:59:01","APPROVED","5767000" "11EXC-5288","MISSION ST","FLORENTINE AVE","GUTTENBERG ST","Excavation","San Francisco Water Department","5481-5485 Mission St","2011-12-23 14:11:48","APPROVED","9186000" "11EXC-5290","PACIFIC AVE","LOCUST ST","SPRUCE ST","Excavation","San Francisco Water Department","3525 Pacific - FIRE","2011-12-23 15:48:48","APPROVED","10167000" "11EXC-5291","PRESIDIO AVE","JACKSON ST","WASHINGTON ST","Excavation","San Francisco Water Department","104-114 Presidio Ave - FIRE","2011-12-23 16:05:28","APPROVED","10762000" "11EXC-5292","SHOTWELL ST","19TH ST","20TH ST","Excavation","San Francisco Water Department","532-534 Shotwell - FIRE","2011-12-23 16:18:40","APPROVED","11837000" "11EXC-5293","CORTLAND AVE","GATES ST","FOLSOM ST","Excavation","Pacific Gas & Electric","908A & B Cortland Ave","2012-01-26 14:54:11","APPROVED","4430000" "11EXC-5294","TURK ST","PIERCE ST","SCOTT ST","Excavation","San Francisco Water Department","1601 Turk St - FIRE","2012-01-03 13:54:43","APPROVED","12731000" "11EXC-5295","SAINT ELMO WAY","EL VERANO WAY","MONTEREY BLVD","Excavation","San Francisco Water Department","170 St Elmo Way","2012-01-03 14:02:34","APPROVED","11293000" "11EXC-5296","19TH AVE","RIVERA ST","","Excavation","Pacific Gas & Electric","N/E Corner 19th Ave & Rivera St","2012-01-05 11:31:01","APPROVED","23202000" "11EXC-5296","RIVERA ST","19TH AVE","","Excavation","Pacific Gas & Electric","N/E Corner 19th Ave & Rivera St","2012-01-05 11:31:01","APPROVED","23202000" "11EXC-5297","19TH AVE","RIVERA ST","SANTIAGO ST","Excavation","Pacific Gas & Electric","2247 19th Ave","2011-12-23 15:05:43","APPROVED","919201" "11EXC-5298","25TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1374000" "11EXC-5298","25TH AVE","CLEMENT ST","GEARY BLVD","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1375000" "11EXC-5298","25TH AVE","GEARY BLVD","ANZA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1376000" "11EXC-5298","25TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1373000" "11EXC-5298","26TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1471000" "11EXC-5298","26TH AVE","CLEMENT ST","GEARY BLVD","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1472000" "11EXC-5298","26TH AVE","GEARY BLVD","ANZA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1473000" "11EXC-5298","26TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1470000" "11EXC-5298","27TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1545000" "11EXC-5298","27TH AVE","CLEMENT ST","GEARY BLVD","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1546000" "11EXC-5298","27TH AVE","GEARY BLVD","ANZA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1547000" "11EXC-5298","27TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1544000" "11EXC-5298","28TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1577000" "11EXC-5298","28TH AVE","CLEMENT ST","GEARY BLVD","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1578000" "11EXC-5298","28TH AVE","GEARY BLVD","ANZA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1579000" "11EXC-5298","28TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","1576000" "11EXC-5298","ANZA ST","25TH AVE","26TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","2343000" "11EXC-5298","ANZA ST","26TH AVE","27TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","2344000" "11EXC-5298","ANZA ST","27TH AVE","28TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","2345000" "11EXC-5298","CALIFORNIA ST","25TH AVE","26TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","3602000" "11EXC-5298","CALIFORNIA ST","26TH AVE","27TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","3603000" "11EXC-5298","CALIFORNIA ST","27TH AVE","28TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","3604000" "11EXC-5298","CLEMENT ST","25TH AVE","26TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","4175000" "11EXC-5298","CLEMENT ST","26TH AVE","27TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","4176000" "11EXC-5298","CLEMENT ST","27TH AVE","28TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","4177000" "11EXC-5298","GEARY BLVD","25TH AVE","26TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","6082101" "11EXC-5298","GEARY BLVD","25TH AVE","26TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","6082201" "11EXC-5298","GEARY BLVD","26TH AVE","27TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","6083101" "11EXC-5298","GEARY BLVD","26TH AVE","27TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","6083201" "11EXC-5298","GEARY BLVD","27TH AVE","28TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","6084101" "11EXC-5298","GEARY BLVD","27TH AVE","28TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","6084201" "11EXC-5298","LAKE ST","25TH AVE","26TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","8034000" "11EXC-5298","LAKE ST","26TH AVE","27TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","8035000" "11EXC-5298","LAKE ST","27TH AVE","28TH AVE","Excavation","LC General Engineering & Construction","SIRP 36 - California b","2011-12-27 09:35:35","APPROVED","8036000" "11EXC-5305","WINFIELD ST","AZTEC ST \ COSO AVE","ESMERALDA AVE","Excavation","San Francisco Water Department","28 winfield","2012-01-03 14:38:59","APPROVED","13677000" "11EXC-5308","POST ST","MASON ST","TAYLOR ST","Excavation","Cable Com of California Inc","545 POST ST","2012-01-03 13:04:31","APPROVED","10630000" "11EXC-5315","BEACON ST","HARRY ST","DIAMOND ST","Excavation","San Francisco Water Department","280 BEACON","2012-01-04 12:03:03","APPROVED","2862000" "11EXC-5318","27TH ST","GUERRERO ST","DOLORES ST","Excavation","San Francisco Water Department","118 - 27TH STREET","2012-01-04 13:17:20","APPROVED","1564000" "11EXC-5321","17TH AVE","CALIFORNIA ST","CLEMENT ST","Excavation","Pacific Gas & Electric","5495 California St.","2012-01-06 15:12:35","APPROVED","751000" "11EXC-5325","LAWTON ST","07TH AVE","08TH AVE","Excavation","San Francisco Water Department","127 LAWTON ST","2012-01-30 09:34:49","APPROVED","8186000" "11EXC-5330","POLK ST","REDWOOD ST","GOLDEN GATE AVE","Excavation","San Francisco Water Department","525 GOLDEN GATE (29 W/E POLK-105 S/S GOLDEN GATE)","2012-01-04 13:42:53","APPROVED","10551000" "11EXC-5332","ELLSWORTH ST","CRESCENT AVE","ALEMANY BLVD \ I-280 S OFF RAMP \ I-280 S ON RAMP","Excavation","San Francisco Water Department","ELLSWORTH S/CRESCENT","2012-01-04 14:46:00","ACTIVE","5201000" "11EXC-5333","MARSTON AVE","EDNA ST","END","Excavation","San Francisco Water Department","166 MARSTON AVE","2012-01-04 14:57:26","APPROVED","8784000" "11EXC-5339","GOULD ST","PAUL AVE","","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL25 - PAUL AVE & GOULD ST","2012-01-03 09:56:39","ACTIVE","20479000" "11EXC-5339","PAUL AVE","GOULD ST","","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL25 - PAUL AVE & GOULD ST","2012-01-03 09:56:39","ACTIVE","20479000" "11EXC-5339","PAUL AVE","GOULD ST","EXETER ST","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL25 - PAUL AVE & GOULD ST","2012-01-03 09:56:39","ACTIVE","10308000" "11IE-0001","09TH ST","SHERIDAN ST","HARRISON ST","StrtImprov","D. Lopez Jr Concrete Construction","","2011-01-18 10:53:51","ACTIVE","456000" "11IE-0005","CHILD ST","GREENWICH ST","TELEGRAPH PL","StrtImprov","FELDMAN ARCHTECTURE LLP","Reconstruct curb and sidewalk with 2' AC conform per city standards. All work directed by DPW inspector. Non standard sidewalk and curb cut design, see 11MSE-0004.","2011-05-11 09:48:26","ACTIVE","3991000" "11IE-0007","CRESTA VISTA DR","EMIL LN","LULU ALY","StrtImprov","Sunset Concrete","Repair sidewalk and curb in kind per city standards and as directed by City inspector. Saw cut 2' pavement for conform. No work to the catch basin under this permit.","2011-01-05 11:40:21","ACTIVE","4511000" "11IE-0015","MOFFITT ST","FARNUM ST","DIAMOND ST","StrtImprov","Donald S. MacLean, Inc.","NTR # 943291. Replace damaged sidewalk and curb on Diamond St frontage.; trim overgrown vegetations on Moffitt St frontage. Street space included.","2011-01-18 14:42:39","ACTIVE","9223000" "11IE-0029","15TH AVE","SANTIAGO ST","TARAVAL ST","StrtImprov","C.M. CONSTRUCTION COMPANY","Per NTR 953184 reconstruct sidewalk and curb per city standards.","2011-01-19 16:25:29","ACTIVE","627000" "11IE-0030","15TH AVE","SANTIAGO ST","TARAVAL ST","StrtImprov","C.M. CONSTRUCTION COMPANY","Per NTR 953186 reconstruct concrete curb and sidewalk to city standards.","2011-01-19 16:27:31","ACTIVE","627000" "11IE-0035","15TH AVE","SANTIAGO ST","TARAVAL ST","StrtImprov","C.M. CONSTRUCTION COMPANY","Per NTR 953189 reconstruct concrete sidewalk and street per city standards.","2011-01-20 15:36:16","ACTIVE","627000" "11IE-0057","18TH ST","DEARBORN ST","LINDA ST","StrtImprov","D Lopez Jr","NTR #952575. Repair damaged sidewalk & curb. Possible tree root damage. 100 SQ FT of repair & 22LF of curb. Street space included.","2011-01-31 08:43:20","ACTIVE","883000" "11IE-0057","18TH ST","LAPIDGE ST","DEARBORN ST","StrtImprov","D Lopez Jr","NTR #952575. Repair damaged sidewalk & curb. Possible tree root damage. 100 SQ FT of repair & 22LF of curb. Street space included.","2011-01-31 08:43:20","ACTIVE","882000" "11IE-0057","18TH ST","VALENCIA ST","","StrtImprov","D Lopez Jr","NTR #952575. Repair damaged sidewalk & curb. Possible tree root damage. 100 SQ FT of repair & 22LF of curb. Street space included.","2011-01-31 08:43:20","ACTIVE","24160000" "11IE-0057","18TH ST","VALENCIA ST","LAPIDGE ST","StrtImprov","D Lopez Jr","NTR #952575. Repair damaged sidewalk & curb. Possible tree root damage. 100 SQ FT of repair & 22LF of curb. Street space included.","2011-01-31 08:43:20","ACTIVE","881000" "11IE-0057","VALENCIA ST","18TH ST","","StrtImprov","D Lopez Jr","NTR #952575. Repair damaged sidewalk & curb. Possible tree root damage. 100 SQ FT of repair & 22LF of curb. Street space included.","2011-01-31 08:43:20","ACTIVE","24160000" "11IE-0058","PAGE ST","COLE ST","SHRADER ST","StrtImprov","D Lopez Jr","NTR #947639. Please replace damaged curb and sidewalk where indicated with white dots; possible tree root problems. 175 SQFT of sidewalk & 12LF of curb repair required. Street space included.","2011-02-18 15:08:37","ACTIVE","10187000" "11IE-0058","PAGE ST","SHRADER ST","","StrtImprov","D Lopez Jr","NTR #947639. Please replace damaged curb and sidewalk where indicated with white dots; possible tree root problems. 175 SQFT of sidewalk & 12LF of curb repair required. Street space included.","2011-02-18 15:08:37","ACTIVE","26435000" "11IE-0058","SHRADER ST","PAGE ST","","StrtImprov","D Lopez Jr","NTR #947639. Please replace damaged curb and sidewalk where indicated with white dots; possible tree root problems. 175 SQFT of sidewalk & 12LF of curb repair required. Street space included.","2011-02-18 15:08:37","ACTIVE","26435000" "11IE-0060","SAN BRUNO AVE","MANSELL ST \ SALINAS AVE","ORDWAY ST","StrtImprov","Raymond Chan","","2011-02-14 10:50:22","ACTIVE","11385000" "11IE-0063","PACIFIC AVE","PRESIDIO AVE \ PRESIDIO BLVD","WALNUT ST","StrtImprov","Armour + Vokic Architecture","","2011-03-08 11:42:35","ACTIVE","10164000" "11IE-0073","LYON ST","VALLEJO ST","GREEN ST","StrtImprov","Maura Fernandez Abernethy Design","Contingent Street Improvement with building renovation (BPA 201011245615).","2011-05-03 13:51:14","ACTIVE","8576000" "11IE-0080","SUTTER ST","STEINER ST","PIERCE ST","StrtImprov","Gonzalez Concrete","Reconstrust sidewalk and curb as directed by Inspector","2011-02-08 16:11:00","ACTIVE","12340000" "11IE-0111","CARL ST","STANYAN ST","WILLARD ST","StrtImprov","Sal Deguarda Concrete","NTR 953435 & 953453 for 251-53 Carl St (Same bldg, but each condo was issued a different NTR for the same scope of work). Replace damaged sidewalk and driveway marked with white paint, possible tree root problem. Street space included.","2011-02-22 16:19:57","ACTIVE","3697000" "11IE-0123","LEXINGTON ST","19TH ST","20TH ST","StrtImprov","Travis Construction","1 New Level Landing for a side entrance. Ref. 11MSE-0070 & BPA 201102281105","2011-03-30 11:49:08","ACTIVE","8319000" "11IE-0139","FLORIDA ST","23RD ST","24TH ST","StrtImprov","AC Contracting","NTR #955389. Repair / replace all sidewalk squares sections marked wtih white dots per City Standards & replace 1 side sewer vent cover. Repair driveway curb.","2011-03-02 09:49:36","ACTIVE","5628000" "11IE-0162","JORDAN AVE","EUCLID AVE","GEARY BLVD","StrtImprov","Santos & Urrutia","","2011-08-01 10:28:21","ACTIVE","7617000" "11IE-0165","NORIEGA ST","24TH AVE","25TH AVE","StrtImprov","E.F. Gomez Cement Contractor","","2011-03-11 16:51:26","ACTIVE","9658000" "11IE-0199","WOOL ST","EUGENIA AVE","CORTLAND AVE","StrtImprov","Sal Deguarda Concrete","Repair tree root related damage - 113 sq ft sidewalk & 17 LF curb. Also remove warped sidewalk and replace with standard sidewalk.","2011-03-28 15:21:47","ACTIVE","13720000" "11IE-0200","WOOL ST","EUGENIA AVE","CORTLAND AVE","StrtImprov","Sal Deguarda Concrete","Repair tree root related damage - 100 sq ft Sidewalk & 17 LF Curb.","2011-03-30 09:43:18","ACTIVE","13720000" "11IE-0203","CALIFORNIA ST","SCOTT ST","DIVISADERO ST","StrtImprov","Cal-Pacific Construction","","2011-05-24 14:18:39","ACTIVE","3561000" "11IE-0204","18TH ST","TEXAS ST","MISSOURI ST","StrtImprov","FARLEY'S","INSTALL ONE (1) 40' LONG PARKLET FRONTING THE SUBJECT PROPERTY, AS PERMITTED BY DPW PERMIT NO. 11PKT-0009, APPROVED APRIL 4, 2011.","2011-04-04 12:54:53","ACTIVE","855000" "11IE-0216","25TH ST","HOFFMAN AVE","FOUNTAIN ST","StrtImprov","Michael Heavey Construction","","2011-04-01 10:30:54","ACTIVE","1459000" "11IE-0252","COLE ST","RIVOLI ST","17TH ST","StrtImprov","Levy Art & Architecture, Inc.","","2012-01-06 15:43:20","ACTIVE","4247000" "11IE-0267","FOLSOM ST","18TH ST","19TH ST","StrtImprov","Donald S. MacLean, Inc.","Reconstruct sidewalk and curb per city standards along the Folsom St frontage. (200 LF of street space is included with this permit.)","2012-01-17 10:20:17","ACTIVE","5693000" "11IE-0339","SILVER AVE","SOMERSET ST","MERRILL ST","StrtImprov","Adolph Ziemba AIA & Assoc.","","2012-01-06 11:36:57","ACTIVE","11919000" "11IE-0346","ALABAMA ST","23RD ST","24TH ST","StrtImprov","Sal Deguarda Concrete","NTR 955430 - repair 120 SF of Sidewalk & 5 LF of Curb. (Contractor intends to repair 108 SF of Sidewalk & 6 LF of Curb).","2011-06-10 16:07:55","ACTIVE","2117000" "11IE-0358","DIAMOND ST","26TH ST","CESAR CHAVEZ ST","StrtImprov","Sal Deguarda Concrete","NTR 958741. Replace/repair all sidewalk squares section marked with a white dots per city standards; also repair driveway ramp. Repair curb as necessary. Street space included.","2011-06-15 08:50:18","ACTIVE","4750000" "11IE-0383","BUSH ST","VAN NESS AVE","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","25223000" "11IE-0383","BUSH ST","VAN NESS AVE","FRANKLIN ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","3445000" "11IE-0383","FERN ST","VAN NESS AVE","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","30077000" "11IE-0383","FERN ST","VAN NESS AVE","FRANKLIN ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","5484000" "11IE-0383","VAN NESS AVE","BUSH ST","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","25223000" "11IE-0383","VAN NESS AVE","FERN ST","","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","30077000" "11IE-0383","VAN NESS AVE","FERN ST","BUSH ST","StrtImprov","A.R. Sanchez-Corea & Associates, Inc.","","2012-01-10 09:51:14","ACTIVE","13155102" "11IE-0388","PINE ST","FRANKLIN ST","GOUGH ST","StrtImprov","E.F. Gomez Cement Contractor","Voluntary Repair (RQ could not pull up a NTR notice for this location). Reconstruct concrete curb, sidewalk and driveway with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space included.","2011-06-22 12:12:05","ACTIVE","10479000" "11IE-0390","PIOCHE ST","HARVARD ST","GAMBIER ST","StrtImprov","IBS USA, Inc.","REPLACE (E) Driveway Curb Cut with Standard Curb and Sidewalk. Ref. BPA 2011.04.13.4001","2011-06-27 11:07:20","ACTIVE","10501000" "11IE-0391","16TH AVE","ORTEGA ST","PACHECO ST","StrtImprov","Sunset Concrete","","2011-06-27 16:26:45","ACTIVE","687000" "11IE-0396","DOLORES ST","DAY ST","30TH ST","StrtImprov","O'Grady Plumbing","Repair sidewalk and replace 6' of curb with 2' pavement conform. All work shall be done per city standards and as directed by city inspector. (This work is done in conjunction with plumbing repair under PW20110617079.)","2011-06-29 10:43:52","ACTIVE","4889101" "11IE-0407","PAGE ST","WEBSTER ST","FILLMORE ST","StrtImprov","SCOTT RUNCORN","Reconstruct concrete curb, sidewalk and curb cut with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector","2011-11-02 14:54:45","ACTIVE","10174000" "11IE-0416","SUTTER ST","KEARNY ST","CLAUDE LN","StrtImprov","TOM LEWIS RESTORATION & CONSULTING, INC","Reconstruct concrete sidewalk and curb per city standards above sub sidewalk basement. Construct two (2) new curb ramps as indicated on plans. All work directed by DPW inspector.","2011-11-04 10:39:18","ACTIVE","12319000" "11IE-0417","SHOTWELL ST","24TH ST","25TH ST","StrtImprov","TARA PIPELINE & ENGINEERING","Per NTR 955339 reconstruct / repair 12 LF of curb and 70 SF of sidewalk to city standards.","2011-07-11 08:15:07","ACTIVE","11842000" "11IE-0420","18TH AVE","IRVING ST","JUDAH ST","StrtImprov","S & H Concrete Construction","Reconstruct damaged sidewalk & portion of curb per NTR#959452.","2011-07-12 08:39:52","ACTIVE","835000" "11IE-0474","GEARY BLVD","COOK ST","SPRUCE ST","StrtImprov","Smelly Mel's Plumbing, INC.","Reconstruct & removed sidewalk & portion of curb per city standards.","2011-08-01 12:08:05","ACTIVE","6050101" "11IE-0480","NOE ST","ELIZABETH ST","24TH ST","StrtImprov","Joseph Vaccaro & Company","NTR 958141. Replace / restore damaged sidewalk & driveway curb (where painted with white dots), due to the tree with root problems. Street space included.","2011-08-05 13:13:23","ACTIVE","9627000" "11IE-0494","FILBERT ST","GOUGH ST","OCTAVIA ST","StrtImprov","E.F. Gomez Cement Contractor","Per NTR 959568 reconstruct 9LF of curb and 170SF of sidewalk per city standards. All work is directed by DPW inspector.","2011-08-16 14:06:38","ACTIVE","5517000" "11IE-0494","OCTAVIA ST","UNION ST","FILBERT ST","StrtImprov","E.F. Gomez Cement Contractor","Per NTR 959568 reconstruct 9LF of curb and 170SF of sidewalk per city standards. All work is directed by DPW inspector.","2011-08-16 14:06:38","ACTIVE","9900000" "11IE-0496","GREEN ST","BUCHANAN ST","WEBSTER ST","StrtImprov","E.F. Gomez Cement Contractor","Voluntary street improvement; replace and repair the sidewalk and curb fronting subject property with 2' AC conform per city standards to match existing. 25LF of street space under this permit.","2011-08-22 11:32:20","ACTIVE","6473000" "11IE-0507","JONES ST","LOMBARD ST","CHESTNUT ST","StrtImprov","Annuzzi's Concrete","Reconstruct & repair sidewalk & portion of curb per NTR#961670.","2011-08-24 12:33:41","ACTIVE","7595000" "11IE-0517","CAYUGA AVE","COTTER ST","SANTA ROSA AVE","StrtImprov","Michael Heavey Construction","Repair 18 LF of curb for DBI Plumbing # PP20110831673 and replace sidewalk flags as necessary. Provide 2-foot pavement conform.","2011-08-31 11:26:11","ACTIVE","3828000" "11IE-0520","VALENCIA ST","21ST ST","HILL ST","StrtImprov","D Lopez Jr","","2011-09-12 08:59:16","ACTIVE","13069000" "11IE-0532","CABRILLO ST","34TH AVE","35TH AVE","StrtImprov","Annuzzi's Concrete","Repair 11 LF of curb and 274 SF of sidewalk to City Standards. Provide 2-foot pavement conform.","2011-09-06 11:31:53","ACTIVE","3501000" "11IE-0543","PALM AVE","CALIFORNIA ST","EUCLID AVE","StrtImprov","ASSOCIATED BUILDERS","","2011-09-13 09:58:28","ACTIVE","10190000" "11IE-0551","MINERVA ST","CAPITOL AVE","ORIZABA AVE","StrtImprov","Dickson Consulting Group","","2011-09-30 11:50:58","ACTIVE","9037000" "11IE-0567","STEINER ST","PINE ST","CALIFORNIA ST","StrtImprov","B & B Contractors Services, LLC","Voluntary repair. Reconstruct concrete curb, sidewalk and replace existing curb cut in kind with min 2' saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space included for one month.","2011-10-12 15:59:02","ACTIVE","12139000" "11IE-0569","MCALLISTER ST","PARKER AVE","STANYAN ST","StrtImprov","E.F. Gomez Cement Contractor","Per NTR 962154 reconstruct sidewalk and squares marked with white dots. (25 LF of street space)","2011-09-20 14:51:17","ACTIVE","8909000" "11IE-0570","18TH ST","OAKWOOD ST","DOLORES ST","StrtImprov","E.F. Gomez Cement Contractor","Per NTR 961287 reconstruct concrete sidewalk and curb marked with white dots. (30 LF street space)","2011-09-20 14:53:52","ACTIVE","886000" "11IE-0575","VALENCIA ST","CUNNINGHAM PL","20TH ST","StrtImprov","E.F. Gomez Cement Contractor","NTR #964301. Replace/repair all sidewalk squares section marked with white dots per city standards. Reconstruct concrete curb per City Standards. All work directed by DPW inspector. Street space included","2011-09-21 17:09:27","ACTIVE","13066000" "11IE-0612","DUNCAN ST","DOLORES ST","CHURCH ST","StrtImprov","Joseph Vaccaro & Company","Reconstruct and repair city sidewalk and curb to city standards. Provide 2' pavement conform. All work shall be directed by a city inspector. Street space included.","2011-10-12 13:20:29","ACTIVE","5000000" "11IE-0615","WALLER ST","CENTRAL AVE","MASONIC AVE","StrtImprov","Sunset Concrete","Voluntary Street Improvement: Replace concrete curb and sidewalk per city standards to match existing. All work directed by DPW inspector. Street is under moratorium, break curb towards the property to avoid damaging AC pavement.","2011-10-13 11:20:54","ACTIVE","13372000" "11IE-0621","DIAMOND ST","JERSEY ST","25TH ST","StrtImprov","Maria Vaccaro","reconstruct sidewalk and curb with 2 ft pave confrom per city standards. All work to be directed by city inspector. street space included","2011-10-14 13:20:38","ACTIVE","4747000" "11IE-0622","OCTAVIA ST","UNION ST","FILBERT ST","StrtImprov","E.F. Gomez Cement Contractor","NTR #959522. Possible tree root problem.Repair / replace sidewalk sections marked with white dots per City Standards.Repair / replace damaged driveway curb. Street space included.","2011-10-14 16:55:49","ACTIVE","9900000" "11IE-0637","NORIEGA ST","45TH AVE","46TH AVE","StrtImprov","Devil's Teeth Baking Company","INSTALL ONE (1) 38' LONG PARKLET FRONTING THE SUBJECT PROPERTY, AS PERMITTED BY DPW PERMIT NO. 11PKT-0025, APPROVED OCTOBER 18, 2011.","2011-10-18 12:30:03","ACTIVE","9680000" "11IE-0659","UNION ST","WEBSTER ST","FILLMORE ST","StrtImprov","IMBIMBO CONCRETE INC.","repair and reconstruct city sidewalk and curb per city standards. all work to be directed by dpw inspector.","2011-10-26 11:15:02","ACTIVE","12871000" "11IE-0687","19TH ST","SAN CARLOS ST","LEXINGTON ST","StrtImprov","HOG & ROCKS","","2011-12-07 12:05:12","ACTIVE","973000" "11IE-0720","VICENTE ST","14TH AVE","15TH AVE","StrtImprov","FATIMA LAU","Reconstruct & repair damaged sidewalk & potion of curb per NTR#961610.","2011-11-28 12:29:46","ACTIVE","13240000" "11IE-0736","HAIGHT ST","ASHBURY ST","CLAYTON ST","StrtImprov","Martin Macks","INSTALL ONE (1) 31' LONG PARKLET FRONTING THE SUBJECT PROPERTY, AS PERMITTED BY DPW PERMIT NO. 11PKT-0031, APPROVED DECEMBER 12, 2011.","2011-12-12 14:22:41","ACTIVE","6619000" "11IE-0746","JONES ST","OFARRELL ST","GEARY ST","StrtImprov","Nile Cafe","INSTALL ONE(1) 42' LONG PARKLET FRONTING THE SUBJECT PROPERTY, AS PERMITTED BY DPW PARKLET PERMIT NO. 11PKT-0028, APPROVED DECEMBER 13, 2011.","2011-12-13 10:29:26","ACTIVE","7570000" "11IE-0749","SAN JOSE AVE","JURI ST","26TH ST","StrtImprov","Joseph Vaccaro & Company","Replace damaged curb, driveway and sidewalk with min 2’ saw-cut / AC paving conform per City Standards. All work directed by DPW inspector. Street space included.","2012-01-18 15:27:26","ACTIVE","11432000" "11IE-0757","PIERCE ST","END","WALLER ST","StrtImprov","Quality Painting & Construction Company","1 New Standard Driveway Curb Cut on Pierce Street. Ref. BPA 201012036076 & 9517046","2011-12-22 15:56:46","ACTIVE","10417000" "11MSE-0068","GREENWICH ST","LARKIN ST","POLK ST","MinorEnc","Christopher Edward Eldredge","Warped driveway & guard rail diverter encraoching past the property into the public right of way 5' & 8".","2011-06-28 09:47:34","ACTIVE","6508000" "11MSE-0138","FRANKLIN ST","REDWOOD ST","GOLDEN GATE AVE","MinorEnc","GONZALO CASTRO","PERMEATION GROUT WALL OF 18 FEET DEEP x 7 FEET WIDE ALONG FRANKLIN STREET and GOLDEN GATE AVENUE","2011-04-20 15:33:19","ACTIVE","5807000" "11MSE-0138","GOLDEN GATE AVE","FRANKLIN ST","GOUGH ST","MinorEnc","GONZALO CASTRO","PERMEATION GROUT WALL OF 18 FEET DEEP x 7 FEET WIDE ALONG FRANKLIN STREET and GOLDEN GATE AVENUE","2011-04-20 15:33:19","ACTIVE","6267000" "11MSE-0265","GROVE ST","VAN NESS AVE","FRANKLIN ST","MinorEnc","War Memorial and Performing Arts Center","THREE (3) FREE STANDING DOUBLE-SIDED, INTERNALLY ILLUMINATED POSTER HOLDERS, AS APPROVED BY THE ARTS COMMISSION VIA RESOLUTION NO. 0606-11-157, AT THE GROVE STREET FRONTAGE OF DAVIES SYMPHONY HALL AT THE SUBJECT PROPERTY.","2011-08-01 14:02:44","ACTIVE","6555000" "11MSE-0330","SUTTER ST","GRANT AVE","STOCKTON ST \ STOCKTON TUNL","MinorEnc","Mosswood Engineering, Inc.","1 New 5' x 5.58' ADA Level Landing, 3 existing 1.42' dia. Air Vents & 1 existing 1' x 1.5' non-skid cover.","2011-11-30 12:45:17","ACTIVE","12321000" "11N-0007","CLARENDON AVE","GALEWOOD CIR","OLYMPIA WAY","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","4075000" "11N-0007","CLARENDON AVE","STANYAN ST","JOHNSTONE DR","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","4068000" "11N-0007","GEARY BLVD","BRODERICK ST","BAKER ST \ SAINT JOSEPHS AVE","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","6044202" "11N-0007","MARKET ST","HWY 101 NORTHBOUND \ HWY 101 SOUTHBOUND \ OCTAVIA ST","OCTAVIA ST","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","8760202" "11N-0007","MARKET ST","MCCOPPIN ST \ PEARL ST","GUERRERO ST \ LAGUNA ST","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","8760102" "11N-0007","MARKET ST","OCTAVIA ST","GUERRERO ST \ LAGUNA ST","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","8760203" "11N-0007","OFARRELL ST","PIERCE ST","SCOTT ST","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","9739000" "11N-0007","WELSH ST","04TH ST","END","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","13571000" "11N-0007","YUKON ST","EAGLE ST","SHORT ST","NightNoise","Pacific Gas & Electric","","2011-01-19 15:44:07","ACTIVE","13789000" "11N-0008","01ST ST","HOWARD ST","TEHAMA ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","107000" "11N-0008","01ST ST","MINNA ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24542000" "11N-0008","01ST ST","MINNA ST","NATOMA ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","105000" "11N-0008","01ST ST","MISSION ST","TRANSBAY HUMP","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","104001" "11N-0008","01ST ST","NATOMA ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24534000" "11N-0008","01ST ST","NATOMA ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","106000" "11N-0008","01ST ST","TRANSBAY HUMP","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","54001000" "11N-0008","01ST ST","TRANSBAY HUMP","MINNA ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","104002" "11N-0008","BEALE ST","HOWARD ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24506000" "11N-0008","FREMONT ST","MISSION ST","TRANSBAY HUMP","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","5861001" "11N-0008","FREMONT ST","NATOMA ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24533000" "11N-0008","FREMONT ST","NATOMA ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","5862000" "11N-0008","FREMONT ST","TRANSBAY HUMP","NATOMA ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","5861002" "11N-0008","HOWARD ST","BEALE ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24506000" "11N-0008","HOWARD ST","MAIN ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24504000" "11N-0008","HOWARD ST","MAIN ST","BEALE ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","7030000" "11N-0008","MAIN ST","HOWARD ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24504000" "11N-0008","MAIN ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24557000" "11N-0008","MINNA ST","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24542000" "11N-0008","MISSION ST","MAIN ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24557000" "11N-0008","NATOMA ST","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24534000" "11N-0008","NATOMA ST","01ST ST","02ND ST","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","9507000" "11N-0008","NATOMA ST","FREMONT ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","24533000" "11N-0008","TRANSBAY HUMP","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-01-24 09:35:13","ACTIVE","54001000" "11N-0019","03RD ST","KEARNY ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","30738000" "11N-0019","ANNIE ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","24612000" "11N-0019","GEARY ST","STOCKTON ST","POWELL ST","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","6109000" "11N-0019","KEARNY ST","03RD ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","30738000" "11N-0019","MARKET ST","03RD ST \ KEARNY ST","","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","30738000" "11N-0019","MARKET ST","05TH ST \ CYRIL MAGNIN ST","MASON ST \ TURK ST","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","8748101" "11N-0019","MISSION ST","ANNIE ST","","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","24612000" "11N-0019","OFARRELL ST","POWELL ST","CYRIL MAGNIN ST","NightNoise","Pacific Gas & Electric","","2011-02-18 08:54:21","ACTIVE","9723000" "11N-0056","03RD ST","FOLSOM ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24583000" "11N-0056","03RD ST","SAINT FRANCIS PL","HARRISON ST","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","171000" "11N-0056","05TH ST","STEVENSON ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24888000" "11N-0056","BUSH ST","GRANT AVE","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24741000" "11N-0056","FOLSOM ST","03RD ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24583000" "11N-0056","GEARY ST","KEARNY ST","GRANT AVE","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","6107000" "11N-0056","GRANT AVE","BUSH ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24741000" "11N-0056","STEVENSON ST","05TH ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24888000" "11N-0056","STOCKTON ST","STOCKTON TUNL \ SUTTER ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24910000" "11N-0056","STOCKTON TUNL","STOCKTON ST \ SUTTER ST","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24910000" "11N-0056","SUTTER ST","STOCKTON ST \ STOCKTON TUNL","","NightNoise","Pacific Gas & Electric","","2011-04-05 14:10:31","ACTIVE","24910000" "11N-0085","BROADWAY","COLUMBUS AVE","","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","25321000" "11N-0085","BROADWAY","GRANT AVE","STOCKTON ST","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","3154000" "11N-0085","BROADWAY","KEARNY ST","","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","24795000" "11N-0085","BROADWAY","ROWLAND ST","","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","24840000" "11N-0085","COLUMBUS AVE","BROADWAY","","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","25321000" "11N-0085","KEARNY ST","BROADWAY","","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","24795000" "11N-0085","ROWLAND ST","BROADWAY","","NightNoise","Pacific Gas & Electric","","2011-04-26 10:25:22","ACTIVE","24840000" "11N-0090","MAIDEN LN","GRANT AVE","STOCKTON ST","NightNoise","SBC - Pacific Bell Engineering","","2011-05-03 13:55:21","ACTIVE","8626000" "11N-0090","MAIDEN LN","KEARNY ST","GRANT AVE","NightNoise","SBC - Pacific Bell Engineering","","2011-05-03 13:55:21","ACTIVE","8625000" "11N-0103","01ST ST","MINNA ST","","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","24542000" "11N-0103","01ST ST","MINNA ST","NATOMA ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","105000" "11N-0103","01ST ST","MISSION ST","TRANSBAY HUMP","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","104001" "11N-0103","01ST ST","NATOMA ST","","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","24534000" "11N-0103","01ST ST","NATOMA ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","106000" "11N-0103","01ST ST","TRANSBAY HUMP","MINNA ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","104002" "11N-0103","FREMONT ST","MISSION ST","TRANSBAY HUMP","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","5861001" "11N-0103","FREMONT ST","NATOMA ST","","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","24533000" "11N-0103","FREMONT ST","NATOMA ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","5862000" "11N-0103","FREMONT ST","TRANSBAY HUMP","NATOMA ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","5861002" "11N-0103","MINNA ST","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","24542000" "11N-0103","MISSION ST","BEALE ST","FREMONT ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","9086000" "11N-0103","MISSION ST","FREMONT ST","01ST ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","9087000" "11N-0103","NATOMA ST","01ST ST","","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","24534000" "11N-0103","NATOMA ST","01ST ST","02ND ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","9507000" "11N-0103","NATOMA ST","FREMONT ST","","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","24533000" "11N-0103","TRANSBAY HUMP","01ST ST","FREMONT ST","NightNoise","Pacific Gas & Electric","","2011-05-26 15:33:25","ACTIVE","19937000" "11N-0112","FOLSOM ST","NORFOLK ST","12TH ST","NightNoise","Pacific Gas & Electric","","2011-06-03 15:36:35","ACTIVE","5684000" "11N-0127","CLAY ST","LEIDESDORFF ST","MONTGOMERY ST","NightNoise","SBC - Pacific Bell Engineering","","2011-06-14 13:59:53","ACTIVE","4085000" "11N-0135","REDWOOD ST","POLK ST","VAN NESS AVE","NightNoise","Yerba Buena Engineering and Construction, Inc.","","2011-08-03 15:19:09","ACTIVE","10955000" "11N-0144","KEARNY ST","POST ST","","NightNoise","Pacific Gas & Electric","","2011-07-12 10:40:36","ACTIVE","24644000" "11N-0144","POST ST","KEARNY ST","","NightNoise","Pacific Gas & Electric","","2011-07-12 10:40:36","ACTIVE","24644000" "11N-0144","POST ST","LICK PL","KEARNY ST","NightNoise","Pacific Gas & Electric","","2011-07-12 10:40:36","ACTIVE","10624002" "11N-0157","09TH ST","MISSION ST","","NightNoise","SBC - Pacific Bell Engineering","","2011-07-29 16:26:28","ACTIVE","24313000" "11N-0157","09TH ST","MISSION ST","MINNA ST","NightNoise","SBC - Pacific Bell Engineering","","2011-07-29 16:26:28","ACTIVE","448000" "11N-0157","MISSION ST","09TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2011-07-29 16:26:28","ACTIVE","24313000" "11N-0163","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Balfour Beatty Infrastructure, Inc.","","2011-08-04 11:52:55","ACTIVE","2864000" "11N-0166","MISSION ST","SPEAR ST","","NightNoise","Pacific Gas & Electric","","2011-08-22 15:16:13","ACTIVE","24555000" "11N-0166","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-08-22 15:16:13","ACTIVE","12044000" "11N-0166","SPEAR ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-08-22 15:16:13","ACTIVE","24555000" "11N-0168","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","30729000" "11N-0168","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","2863000" "11N-0168","BEALE ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","24554000" "11N-0168","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","2864000" "11N-0168","DAVIS ST","BEALE ST \ MARKET ST \ PINE ST","","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","30729000" "11N-0168","FREMONT ST","FRONT ST \ MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","5860000" "11N-0168","MAIN ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","8627000" "11N-0168","MARKET ST","BEALE ST \ DAVIS ST \ PINE ST","","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","30729000" "11N-0168","MISSION ST","BEALE ST","","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","24554000" "11N-0168","MISSION ST","BEALE ST","FREMONT ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","9086000" "11N-0168","MISSION ST","MAIN ST","BEALE ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","9085000" "11N-0168","PINE ST","BEALE ST \ DAVIS ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","30729000" "11N-0168","PINE ST","BEALE ST \ DAVIS ST \ MARKET ST","FRONT ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","10453000" "11N-0168","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-08-23 15:29:52","ACTIVE","12044000" "11N-0170","LEE AVE","OCEAN AVE","","NightNoise","A & B Construction, Inc.","","2011-08-30 08:41:48","ACTIVE","22223000" "11N-0170","OCEAN AVE","LEE AVE","","NightNoise","A & B Construction, Inc.","","2011-08-30 08:41:48","ACTIVE","22223000" "11N-0192","MISSION ST","SPEAR ST","","NightNoise","Pacific Gas & Electric","","2011-09-02 13:13:50","ACTIVE","24555000" "11N-0192","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-09-02 13:13:50","ACTIVE","12044000" "11N-0192","SPEAR ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-09-02 13:13:50","ACTIVE","24555000" "11N-0192","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-09-02 13:13:50","ACTIVE","12045000" "11N-0193","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","30729000" "11N-0193","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","2864000" "11N-0193","DAVIS ST","BEALE ST \ MARKET ST \ PINE ST","","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","30729000" "11N-0193","FREMONT ST","FRONT ST \ MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","5860000" "11N-0193","MAIN ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","8627000" "11N-0193","MARKET ST","BEALE ST \ DAVIS ST \ PINE ST","","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","30729000" "11N-0193","MISSION ST","BEALE ST","FREMONT ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","9086000" "11N-0193","MISSION ST","MAIN ST","BEALE ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","9085000" "11N-0193","PINE ST","BEALE ST \ DAVIS ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","30729000" "11N-0193","PINE ST","BEALE ST \ DAVIS ST \ MARKET ST","FRONT ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","10453000" "11N-0193","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-09-02 14:03:04","ACTIVE","12044000" "11N-0196","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Balfour Beatty Infrastructure, Inc.","","2011-09-06 13:27:08","ACTIVE","2864000" "11N-0204","03RD ST","19TH ST","20TH ST","NightNoise","A & B Construction, Inc.","","2011-09-16 15:57:20","ACTIVE","189101" "11N-0206","BAY SHORE BLVD","LELAND AVE","VISITACION AVE","NightNoise","XO Communications Services, Inc.","","2011-09-20 08:09:19","ACTIVE","2825101" "11N-0206","BAY SHORE BLVD","VISITACION AVE","SUNNYDALE AVE","NightNoise","XO Communications Services, Inc.","","2011-09-20 08:09:19","ACTIVE","2826101" "11N-0206","KEARNY ST","MAIDEN LN","POST ST","NightNoise","XO Communications Services, Inc.","","2011-09-20 08:09:19","ACTIVE","7748000" "11N-0217","BEALE ST","DAVIS ST \ MARKET ST \ PINE ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-10-05 14:41:00","ACTIVE","2863000" "11N-0218","MISSION ST","SPEAR ST","","NightNoise","Pacific Gas & Electric","","2011-09-29 09:48:50","ACTIVE","24555000" "11N-0218","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-09-29 09:48:50","ACTIVE","12044000" "11N-0218","SPEAR ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-09-29 09:48:50","ACTIVE","24555000" "11N-0222","HARRISON ST","BEALE ST","FREMONT ST \ I-80 W OFF RAMP","NightNoise","A & B Construction, Inc.","","2011-11-10 09:22:13","ACTIVE","6710000" "11N-0224","01ST ST","HOWARD ST","TEHAMA ST","NightNoise","Balfour Beatty Infrastructure, Inc.","","2011-10-04 11:04:50","ACTIVE","107000" "11N-0224","01ST ST","MINNA ST","NATOMA ST","NightNoise","Balfour Beatty Infrastructure, Inc.","","2011-10-04 11:04:50","ACTIVE","105000" "11N-0224","01ST ST","NATOMA ST","HOWARD ST","NightNoise","Balfour Beatty Infrastructure, Inc.","","2011-10-04 11:04:50","ACTIVE","106000" "11N-0224","01ST ST","TRANSBAY HUMP","MINNA ST","NightNoise","Balfour Beatty Infrastructure, Inc.","","2011-10-04 11:04:50","ACTIVE","104002" "11N-0226","MISSION ST","SPEAR ST","","NightNoise","Pacific Gas & Electric","","2011-10-04 09:42:40","ACTIVE","24555000" "11N-0226","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-10-04 09:42:40","ACTIVE","12044000" "11N-0226","SPEAR ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2011-10-04 09:42:40","ACTIVE","24555000" "11N-0226","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-10-04 09:42:40","ACTIVE","12045000" "11N-0229","MARKET ST","SPEAR ST","DRUMM ST","NightNoise","Pacific Gas & Electric","","2011-10-06 10:08:31","ACTIVE","8737102" "11N-0233","06TH ST","GOLDEN GATE AVE \ MARKET ST \ TAYLOR ST","","NightNoise","Pacific Gas & Electric","","2011-10-25 09:32:04","ACTIVE","24922000" "11N-0233","06TH ST","GOLDEN GATE AVE \ MARKET ST \ TAYLOR ST","STEVENSON ST","NightNoise","Pacific Gas & Electric","","2011-10-25 09:32:04","ACTIVE","326000" "11N-0233","GOLDEN GATE AVE","06TH ST \ MARKET ST \ TAYLOR ST","","NightNoise","Pacific Gas & Electric","","2011-10-25 09:32:04","ACTIVE","24922000" "11N-0233","MARKET ST","06TH ST \ GOLDEN GATE AVE \ TAYLOR ST","","NightNoise","Pacific Gas & Electric","","2011-10-25 09:32:04","ACTIVE","24922000" "11N-0233","TAYLOR ST","06TH ST \ GOLDEN GATE AVE \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2011-10-25 09:32:04","ACTIVE","24922000" "11N-0240","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-10-13 13:29:03","ACTIVE","12045000" "11N-0254","04TH ST","ELLIS ST \ MARKET ST \ STOCKTON ST","STEVENSON ST","NightNoise","Pacific Gas & Electric","","2011-10-27 10:49:01","ACTIVE","249000" "11N-0254","MARKET ST","04TH ST \ ELLIS ST \ STOCKTON ST","POWELL ST","NightNoise","Pacific Gas & Electric","","2011-10-27 10:49:01","ACTIVE","8747102" "11N-0254","MARKET ST","SUTTER ST","02ND ST","NightNoise","Pacific Gas & Electric","","2011-10-27 10:49:01","ACTIVE","8742203" "11N-0270","CALIFORNIA ST","FILLMORE ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26611000" "11N-0270","CLAY ST","FILLMORE ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26648000" "11N-0270","FILLMORE ST","CALIFORNIA ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26611000" "11N-0270","FILLMORE ST","CALIFORNIA ST","SACRAMENTO ST","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","5553000" "11N-0270","FILLMORE ST","CLAY ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26648000" "11N-0270","FILLMORE ST","SACRAMENTO ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26639000" "11N-0270","FILLMORE ST","SACRAMENTO ST","CLAY ST","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","5554000" "11N-0270","GOLDBERG LN","SACRAMENTO ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","30083000" "11N-0270","SACRAMENTO ST","FILLMORE ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26639000" "11N-0270","SACRAMENTO ST","FILLMORE ST","STEINER ST","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","11257000" "11N-0270","SACRAMENTO ST","GOLDBERG LN","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","30083000" "11N-0270","SACRAMENTO ST","GOLDBERG LN","FILLMORE ST","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","11256000" "11N-0270","SACRAMENTO ST","STEINER ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26637000" "11N-0270","SACRAMENTO ST","WEBSTER ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26647000" "11N-0270","SACRAMENTO ST","WEBSTER ST","GOLDBERG LN","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","11255000" "11N-0270","STEINER ST","SACRAMENTO ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26637000" "11N-0270","WEBSTER ST","SACRAMENTO ST","","NightNoise","Pacific Gas & Electric","","2011-11-14 14:38:09","ACTIVE","26647000" "11N-0279","BATTERY ST","BUSH ST","PINE ST","NightNoise","SBC - Pacific Bell Engineering","","2011-11-17 13:05:38","ACTIVE","2752000" "11N-0283","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-12-02 11:16:48","ACTIVE","12044000" "11N-0283","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-12-02 11:16:48","ACTIVE","12045000" "11N-0294","SPEAR ST","HOWARD ST","FOLSOM ST","NightNoise","Pacific Gas & Electric","","2011-12-29 10:19:23","ACTIVE","12046000" "11N-0294","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-12-29 10:19:23","ACTIVE","12045000" "11N-0297","MARKET ST","SPEAR ST","","NightNoise","Pacific Gas & Electric","","2011-12-29 10:01:59","ACTIVE","30726000" "11N-0297","SPEAR ST","MARKET ST","","NightNoise","Pacific Gas & Electric","","2011-12-29 10:01:59","ACTIVE","30726000" "11N-0297","SPEAR ST","MARKET ST","MISSION ST","NightNoise","Pacific Gas & Electric","","2011-12-29 10:01:59","ACTIVE","12044000" "11N-0297","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2011-12-29 10:01:59","ACTIVE","12045000" "11PKT-0028","JONES ST","OFARRELL ST","GEARY ST","Parklet","Nile Cafe","","2011-12-13 10:26:33","ACTIVE","7570000" "11PKT-0031","HAIGHT ST","ASHBURY ST","CLAYTON ST","Parklet","Martin Macks","","2011-12-12 14:12:41","ACTIVE","6619000" "11S-0054","EVANS AVE","JENNINGS ST \ MIDDLE POINT RD","","SideSewer","E. Mitchell, Inc.","To install 6" side sewer connection to the city main.","2011-04-01 12:06:49","ACTIVE","20177000" "11S-0054","JENNINGS ST","EVANS AVE \ MIDDLE POINT RD","","SideSewer","E. Mitchell, Inc.","To install 6" side sewer connection to the city main.","2011-04-01 12:06:49","ACTIVE","20177000" "11S-0054","MIDDLE POINT RD","EVANS AVE \ JENNINGS ST","","SideSewer","E. Mitchell, Inc.","To install 6" side sewer connection to the city main.","2011-04-01 12:06:49","ACTIVE","20177000" "11S-0100","JACKSON ST","GOUGH ST","OCTAVIA ST","SideSewer","Uniacke Construction","Install a new 6" side sewer to a 16" main with 4 hours of inspection. Street space #1236062","2011-05-18 14:31:08","ACTIVE","7399000" "11S-0121","FELL ST","CENTRAL AVE","MASONIC AVE","SideSewer","M.C. Dixon","Repair 6" SS connecting to 4'x5' brick main with 4 hours of inspection time.","2011-07-08 14:10:35","ACTIVE","5455000" "11S-0133","WASHINGTON ST","COLUMBUS AVE \ MONTGOMERY ST","KEARNY ST","SideSewer","A & B Construction, Inc.","Reference sheet C-1.02. See Hydraulics Notes under special conditions. All work directed by a DPW inspector. Street space included.","2011-08-09 11:50:23","ACTIVE","13410000" "11S-0141","28TH ST","CHURCH ST","SANCHEZ ST","SideSewer","Uniacke Construction","Install a new 6" side sewer to an 18" main on 28th St . 4 hour of inspection. Street space #1234861 ","2011-08-12 17:02:37","ACTIVE","1601000" "11S-0149","GREENWICH ST","STEINER ST","PIERCE ST","SideSewer","Uniacke Construction","Repair an existing 6" side sewer to a 12" main with 4 hours of inspection. Street space included","2011-08-17 14:07:10","ACTIVE","6520000" "11S-0151","THORP LN","CLOVER LN","END","SideSewer","M Squared Construction, Inc.","New (N) side sewer on the Thorp Ln frontage as shown on street improvement drawings 11IE-0141. Restore the public right of way to city standards.","2011-08-18 15:44:23","ACTIVE","12605000" "11S-0157","SANCHEZ ST","CLIPPER ST","26TH ST","SideSewer","TARA PIPELINE & ENGINEERING","Install new 6" sewer lateral to a 18" main with 4 hourso f inspection. All work directed by DPW inspector. Street space #11063586 ","2011-09-12 10:02:29","ACTIVE","11532000" "11S-0173","STANYAN ST","BEULAH ST","FREDERICK ST","SideSewer","ACE Drilling & Excavation","Install 6" SS connecting to a 3'x4'-6" conc main with 4 hours of inspection time.","2011-10-06 11:26:33","ACTIVE","12093000" "11S-0192","MASON ST","SHEPHARD PL \ TRUETT ST","WASHINGTON ST","SideSewer","ACE Drilling & Excavation","Install 1 New 8-inches dia. Side Sewer.","2011-11-03 15:02:20","ACTIVE","8817000" "11S-0199","DIAMOND ST","21ST ST","22ND ST","SideSewer","Uniacke Construction","Repair an existing 6" side sewer to a 15" main with 4 hours of inspection. Street space #11106340 ","2011-11-10 09:44:17","ACTIVE","4741000" "11S-0222","15TH ST","MISSION ST","WIESE ST","SideSewer","A & B Construction, Inc.","Install a new combined 10" sanitary & 12" storm to an existing 5'-6" main on the 15th Street frontage. 4 hours of inspection included. Street space permit #1249944. See sheet "03MSUTIL C3.0 20121208.pdf".","2011-12-08 10:59:04","ACTIVE","651000" "11S-0225","SHOTWELL ST","19TH ST","20TH ST","SideSewer","Uniacke Construction","Repair an existing 6" side sewer to a 15" main with 4 hours of inspection. Street space included.","2011-12-12 14:34:43","ACTIVE","11837000" "11S-0227","SAN CARLOS ST","19TH ST","20TH ST","SideSewer","Uniacke Construction","Repair existing 6" sewer lateral to 15" main sewer. 4 hours of inspection included.","2011-12-14 08:16:05","ACTIVE","11405000" "11SSP-00013","TEHAMA ST","08TH ST","09TH ST","StreetSpace","DOMUS CONSTRUCTION & DESIGN INC","","2011-03-01 13:03:26","ACTIVE","12477000" "11SSP-00048","HOWARD ST","01ST ST","MALDEN ALY","StreetSpace","Evans Brothers Inc.","","2011-06-22 09:46:59","ACTIVE","7033000" "11SW-0066","SUTTER ST","KEARNY ST","CLAUDE LN","SpecSide","TOM LEWIS RESTORATION & CONSULTING, INC","City-standard concrete sidewalk with non standard scoring fronting subject property as shown on sheet A 102.1, titled Score Plan. In conjunction with street improvement permit 11IE-0416.","2011-10-18 12:54:48","ACTIVE","12319000" "11SW-0077","HYDE ST","LOMBARD ST","CHESTNUT ST","SpecSide","Rock and Rose Landscapes & Birkmyer Associates","Install quarry cobbles stone (flush join) along Hyde Street side of the property.","2011-11-18 14:17:04","ACTIVE","7145000" "11TE-0014","STOCKTON ST","OFARRELL ST","GEARY ST","TankRemove","Synergy Project Management","500 gallons underground tank removed and inspected by BCM. This is in associated with Central Subway Project.","2011-03-14 14:34:06","ACTIVE","12195000" "11TE-0027","TAYLOR ST","SUTTER ST","BUSH ST","TankRemove","GOLDEN GATE TANK REMOVAL","One (1) 1500 gallon underground Heating Oil tank located on the Taylor Street frontage.","2011-06-21 12:46:04","ACTIVE","12437000" "11TE-0041","LINCOLN WAY","ARGUELLO BLVD \ FREDERICK ST","02ND AVE","TankRemove","GOLDEN GATE TANK REMOVAL","Remove one (1) 1500-gallon Diesel tank.","2011-09-13 14:17:56","ACTIVE","8341101" "11TE-0054","CASTENADA AVE","MONTALVO AVE","END","TankRemove","GOLDEN GATE TANK REMOVAL","To remove one 1500-Gallon underground Diesel tank in front of 400 Castenade Ave property","2011-11-14 09:02:59","ACTIVE","3777000" "11TE-0058","11TH AVE","CALIFORNIA ST","CLEMENT ST","TankRemove","GOLDEN GATE TANK REMOVAL","Remove one (1) 1500-gallon underground Heating Oil tank under the sidewalk.","2011-11-21 10:49:45","ACTIVE","494000" "11TOC-2410","NORIEGA ST","45TH AVE","46TH AVE","TempOccup","Matarozzi Pelsinger Builders","","2011-11-15 11:12:15","ACTIVE","9680000" "11TOC-2564","PACIFIC AVE","OSGOOD PL","MONTGOMERY ST","TempOccup","Classic Party Rentals","","2011-12-02 15:05:35","ACTIVE","10121000" "11V-0011","TURK ST","HYDE ST","DODGE ST","Vault","Highland Property Construction, Inc.","","2011-05-31 12:53:02","ACTIVE","12720000" "11V-0021","BUSH ST","VAN NESS AVE","FRANKLIN ST","Vault","A.R. Sanchez-Corea & Associates, Inc.","","2011-12-05 15:34:22","ACTIVE","3445000" "12E-0044","NATOMA ST","MARY ST","06TH ST","ExcStreet","A & B Construction, Inc.","Trenching for new underground electric and gas service.","2012-01-24 15:32:05","ACTIVE","9511000" "12EXC-0008","WALLACE AVE","JENNINGS ST","KEITH ST","Excavation","Pacific Gas & Electric","1510 WALLACE AVE. - INSTALL NEW ANCHORS","2012-01-17 09:08:00","APPROVED","13356000" "12EXC-0010","FULTON ST","25TH AVE \ CROSSOVER DR","26TH AVE","Excavation","San Francisco Water Department","N/SIDE FULTON - E/26TH AVE","2012-01-05 09:29:54","APPROVED","5932000" "12EXC-0016","MERCHANT ST","MONTGOMERY ST","KEARNY ST","Excavation","Cable Com of California Inc","750 KEARNY ST","2012-01-05 11:20:41","APPROVED","8986000" "12EXC-0018","HOWARD ST","SPEAR ST","","Excavation","Pacific Gas & Electric","Relocate Electric UG Facilities to clear route for 42'' rd. Force Main Sewer, prior to construction","2012-01-06 12:03:32","APPROVED","24547000" "12EXC-0018","SPEAR ST","HOWARD ST","","Excavation","Pacific Gas & Electric","Relocate Electric UG Facilities to clear route for 42'' rd. Force Main Sewer, prior to construction","2012-01-06 12:03:32","APPROVED","24547000" "12EXC-0018","SPEAR ST","MISSION ST","HOWARD ST","Excavation","Pacific Gas & Electric","Relocate Electric UG Facilities to clear route for 42'' rd. Force Main Sewer, prior to construction","2012-01-06 12:03:32","APPROVED","12045000" "12EXC-0021","07TH ST","BERRY ST","","Excavation","SBC - Pacific Bell Engineering","8541666","2012-01-05 15:08:33","APPROVED","23851000" "12EXC-0021","BERRY ST","07TH ST","","Excavation","SBC - Pacific Bell Engineering","8541666","2012-01-05 15:08:33","APPROVED","23851000" "12EXC-0021","BERRY ST","07TH ST","DE HARO ST","Excavation","SBC - Pacific Bell Engineering","8541666","2012-01-05 15:08:33","APPROVED","2957000" "12EXC-0024","BAY SHORE BLVD","PAUL AVE","","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","20574000" "12EXC-0024","DWIGHT ST","SAN BRUNO AVE","","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","20600000" "12EXC-0024","DWIGHT ST","SAN BRUNO AVE","GIRARD ST","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","5019000" "12EXC-0024","PAUL AVE","BAY SHORE BLVD","","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","20574000" "12EXC-0024","PAUL AVE","BAY SHORE BLVD","SAN BRUNO AVE","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","10312000" "12EXC-0024","PAUL AVE","SAN BRUNO AVE","","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","20578000" "12EXC-0024","PAUL AVE","WHEAT ST","BAY SHORE BLVD","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","10311000" "12EXC-0024","SAN BRUNO AVE","DWIGHT ST","","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","20600000" "12EXC-0024","SAN BRUNO AVE","DWIGHT ST","PAUL AVE","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","11381000" "12EXC-0024","SAN BRUNO AVE","PAUL AVE","","Excavation","NextG Networks of California, Inc","CLW1001PH2UFL10 - Paul Ave","2012-01-11 14:12:19","ACTIVE","20578000" "12EXC-0028","23RD ST","CHATTANOOGA ST","SEVERN ST","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","1275000" "12EXC-0028","23RD ST","CHURCH ST","","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","25641000" "12EXC-0028","23RD ST","SEVERN ST","","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","25657000" "12EXC-0028","23RD ST","SEVERN ST","CHURCH ST","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","1276000" "12EXC-0028","CHURCH ST","23RD ST","","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","25641000" "12EXC-0028","CHURCH ST","23RD ST","ELIZABETH ST","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","4025000" "12EXC-0028","SEVERN ST","23RD ST","","Excavation","SBC - Pacific Bell Engineering","1115 Church-Underground overhead facilities","2012-02-01 13:33:23","APPROVED","25657000" "12EXC-0033","ALAMEDA ST","VERMONT ST","","Excavation","San Francisco Water Department","INTERSECTION VERMONT AND ALAMEDA","2012-01-05 16:49:05","APPROVED","23865000" "12EXC-0033","VERMONT ST","ALAMEDA ST","","Excavation","San Francisco Water Department","INTERSECTION VERMONT AND ALAMEDA","2012-01-05 16:49:05","APPROVED","23865000" "12EXC-0036","HOMEWOOD CT","WILDWOOD WAY","END","Excavation","San Francisco Water Department","16 HOMEWOOD CT","2012-01-05 16:55:39","APPROVED","7020000" "12EXC-0043","ALEMANY BLVD","LEO ST","ONONDAGA AVE","Excavation","San Francisco Water Department","EAST SIDE ALEMANY - N/ONONDAGA","2012-01-05 17:03:37","APPROVED","2167102" "12EXC-0049","CENTRAL AVE","MCALLISTER ST","GOLDEN GATE AVE","Excavation","San Francisco Water Department","2000 McAllister (On Central/n of McAllister)","2012-01-06 11:43:51","APPROVED","3867000" "12EXC-0050","44TH AVE","ULLOA ST","VICENTE ST","Excavation","Pacific Gas & Electric","44th Ave.(Ulloa to Vicente Sts)","2012-01-06 11:00:51","APPROVED","1989000" "12EXC-0052","FOOTE AVE","ELLINGTON AVE","HURON AVE","Excavation","San Francisco Water Department","178 FOOTE","2012-01-06 11:11:09","APPROVED","5725000" "12EXC-0054","VALLEJO ST","DIVISADERO ST","BRODERICK ST","Excavation","Pacific Gas & Electric","2750 Vallejo St.","2012-01-12 09:05:04","APPROVED","13121000" "12EXC-0057","CHESTNUT ST","FRANKLIN ST","","Excavation","Pacific Gas & Electric","S/E/C Franklin & Chestnut","2012-01-09 14:11:45","APPROVED","26700000" "12EXC-0057","FRANKLIN ST","CHESTNUT ST","","Excavation","Pacific Gas & Electric","S/E/C Franklin & Chestnut","2012-01-09 14:11:45","APPROVED","26700000" "12EXC-0059","DUBOCE AVE","ELGIN PARK","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","25847000" "12EXC-0059","DUBOCE AVE","PEARL ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","25849000" "12EXC-0059","DUBOCE AVE","STEVENSON ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24401000" "12EXC-0059","ELGIN PARK","DUBOCE AVE","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","25847000" "12EXC-0059","ELGIN PARK","MCCOPPIN ST","DUBOCE AVE","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","5139000" "12EXC-0059","GOUGH ST","MCCOPPIN ST \ OTIS ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24390000" "12EXC-0059","JESSIE ST","MCCOPPIN ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24392000" "12EXC-0059","JESSIE ST","MCCOPPIN ST","END","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","7527000" "12EXC-0059","MARKET ST","MCCOPPIN ST \ PEARL ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","30759000" "12EXC-0059","MCCOPPIN ST","GOUGH ST \ OTIS ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24390000" "12EXC-0059","MCCOPPIN ST","GOUGH ST \ OTIS ST","JESSIE ST","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","8914000" "12EXC-0059","MCCOPPIN ST","JESSIE ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24392000" "12EXC-0059","MCCOPPIN ST","JESSIE ST","STEVENSON ST","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","8915000" "12EXC-0059","MCCOPPIN ST","MARKET ST \ PEARL ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","30759000" "12EXC-0059","MCCOPPIN ST","STEVENSON ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24406000" "12EXC-0059","MCCOPPIN ST","STEVENSON ST","VALENCIA ST","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","8916000" "12EXC-0059","OTIS ST","GOUGH ST \ MCCOPPIN ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24390000" "12EXC-0059","PEARL ST","DUBOCE AVE","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","25849000" "12EXC-0059","PEARL ST","MARKET ST \ MCCOPPIN ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","30759000" "12EXC-0059","PEARL ST","MARKET ST \ MCCOPPIN ST","PINK ALY","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","10320000" "12EXC-0059","PEARL ST","PINK ALY","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","25850000" "12EXC-0059","PEARL ST","PINK ALY","DUBOCE AVE","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","10321000" "12EXC-0059","PINK ALY","PEARL ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","25850000" "12EXC-0059","STEVENSON ST","DUBOCE AVE","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24401000" "12EXC-0059","STEVENSON ST","MCCOPPIN ST","","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","24406000" "12EXC-0059","STEVENSON ST","MCCOPPIN ST","DUBOCE AVE","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","12178000" "12EXC-0059","VALENCIA ST","MCCOPPIN ST","DUBOCE AVE","Excavation","Shaw Pipeline Inc.","SOMA West Ancillary Improvements Project (Contract No. 1378J)","2012-01-10 14:02:14","APPROVED","13053000" "12EXC-0060","MISSION ST","CAPP ST \ CESAR CHAVEZ ST","PRECITA AVE","Excavation","San Francisco Water Department","3139 Mission St - FIRE Pls See 11EXC-4640","2012-01-06 15:37:39","APPROVED","9129000" "12EXC-0062","EUCALYPTUS DR","GLADIOLUS LN","19TH AVE","Excavation","SBC - Pacific Bell Engineering","JOB #8530073","2012-01-09 15:14:54","APPROVED","5268000" "12EXC-0066","32ND AVE","ORTEGA ST","PACHECO ST","Excavation","Pacific Gas & Electric","1958 32nd Ave.","2012-01-10 13:36:31","APPROVED","1714000" "12EXC-0067","34TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Pacific Gas & Electric","2358 34th Ave.","2012-01-10 13:48:23","APPROVED","1757000" "12EXC-0076","30TH AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","1839 30th Ave.","2012-01-10 14:02:43","APPROVED","1654000" "12EXC-0081","29TH AVE","QUINTARA ST","RIVERA ST","Excavation","Pacific Gas & Electric","2128 29th Ave.","2012-01-10 14:08:04","APPROVED","1623000" "12EXC-0082","39TH AVE","TARAVAL ST","ULLOA ST","Excavation","Pacific Gas & Electric","2427 39th Ave.","2012-01-10 14:20:15","APPROVED","1879000" "12EXC-0083","CHESTNUT ST","DIVISADERO ST","BRODERICK ST","Excavation","San Francisco Water Department","2472 - 2474 Chestnut - FIRE","2012-01-10 14:34:04","APPROVED","3983000" "12EXC-0084","NATOMA ST","10TH ST","11TH ST","Excavation","Cable Com of California Inc","169 11th ST","2012-01-06 15:44:41","APPROVED","9516000" "12EXC-0085","FILBERT ST","BRODERICK ST","BAKER ST","Excavation","San Francisco Water Department","2774-2776 Filbert - FIRE","2012-01-10 15:22:13","APPROVED","5527000" "12EXC-0087","MISSION ST","KINGSTON ST","CORTLAND AVE","Excavation","San Francisco Water Department","3446-3448 Mission","2012-01-11 07:41:43","APPROVED","9139000" "12EXC-0099","NORIEGA ST","28TH AVE","29TH AVE","Excavation","Pacific Gas & Electric","2124 Noriega St.","2012-01-11 08:52:16","APPROVED","9662000" "12EXC-0103","ROLPH ST","MADRID ST","MORSE ST","Excavation","San Francisco Water Department","236 ROLPH","2012-01-11 10:25:16","APPROVED","11120000" "12EXC-0105","CAIRE TER","CAROLINA ST","END","Excavation","Pacific Gas & Electric","21 Caire Terrace","2012-01-11 09:00:36","APPROVED","3723000" "12EXC-0106","CALIFORNIA ST","DIVISADERO ST","BRODERICK ST","Excavation","San Francisco Water Department","2820-2824 California - See Exc-4805","2012-01-09 15:23:21","APPROVED","3562000" "12EXC-0107","FLORIDA ST","18TH ST","19TH ST","Excavation","San Francisco Water Department","1376-1378 Florida - FIRE Pls see 11exc-4806","2012-01-10 08:41:10","APPROVED","5623000" "12EXC-0108","PALM AVE","CALIFORNIA ST","EUCLID AVE","Excavation","San Francisco Water Department","42 palm - Pls see 11exc-4470","2012-01-10 09:15:54","APPROVED","10190000" "12EXC-0109","HANCOCK ST","CHURCH ST","SANCHEZ ST","Excavation","San Francisco Water Department","52 - 54 hancock","2012-01-19 13:03:26","APPROVED","6661000" "12EXC-0110","CONNECTICUT ST","26TH ST","CESAR CHAVEZ ST","Excavation","San Francisco Water Department","1251-1255 Connecticut - Pls see 11exc-4623","2012-01-10 09:23:03","APPROVED","4352000" "12EXC-0111","TARAVAL ST","38TH AVE","39TH AVE","Excavation","Pacific Gas & Electric","2839 Taraval St.","2012-01-11 09:31:55","APPROVED","12415000" "12EXC-0112","AMHERST ST","SILVER AVE","SILLIMAN ST","Excavation","Pacific Gas & Electric","20 Amherst St.","2012-01-11 09:51:04","APPROVED","2262000" "12EXC-0116","PRECITA AVE","SHOTWELL ST","FOLSOM ST","Excavation","Pacific Gas & Electric","254 Precita Ave.","2012-01-11 10:03:37","APPROVED","10742000" "12EXC-0119","SAN BRUNO AVE","WAYLAND ST","WOOLSEY ST","Excavation","San Francisco Water Department","2809 San Bruno Ave - FIRE","2012-01-11 14:01:33","ACTIVE","11379000" "12EXC-0121","28TH AVE","BALBOA ST","","Excavation","San Francisco Water Department","intersection 28th ave and balboa","2012-01-11 11:00:59","APPROVED","27550000" "12EXC-0121","BALBOA ST","28TH AVE","","Excavation","San Francisco Water Department","intersection 28th ave and balboa","2012-01-11 11:00:59","APPROVED","27550000" "12EXC-0122","41ST AVE","ULLOA ST","VICENTE ST","Excavation","Pacific Gas & Electric","41st Ave.(Ulloa & Vicente Sts)","2012-01-11 08:20:47","APPROVED","1923000" "12EXC-0123","01ST ST","ELIM ALY","MISSION ST","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","103000" "12EXC-0123","01ST ST","HOWARD ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24532000" "12EXC-0123","01ST ST","HOWARD ST","TEHAMA ST","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","107000" "12EXC-0123","01ST ST","MINNA ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24542000" "12EXC-0123","01ST ST","MINNA ST","NATOMA ST","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","105000" "12EXC-0123","01ST ST","MISSION ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24563000" "12EXC-0123","01ST ST","MISSION ST","TRANSBAY HUMP","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","104001" "12EXC-0123","01ST ST","NATOMA ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24534000" "12EXC-0123","01ST ST","NATOMA ST","HOWARD ST","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","106000" "12EXC-0123","01ST ST","TRANSBAY HUMP","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","54001000" "12EXC-0123","01ST ST","TRANSBAY HUMP","MINNA ST","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","104002" "12EXC-0123","HOWARD ST","01ST ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24532000" "12EXC-0123","MINNA ST","01ST ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24542000" "12EXC-0123","MISSION ST","01ST ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24563000" "12EXC-0123","NATOMA ST","01ST ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","24534000" "12EXC-0123","TRANSBAY HUMP","01ST ST","","Excavation","MCI Metro/Verizon","This is part of the Transbay Tube Phase II utility relocation Project. This project is on First Street and extends from Elim Ally to Tehama St. Contact is Paul Marshall 510 703-0671","2012-01-19 09:36:08","ACTIVE","54001000" "12EXC-0124","SAN CARLOS ST","18TH ST","19TH ST","Excavation","San Francisco Water Department","179 San Carlos - FIRE","2012-01-11 13:39:14","APPROVED","11404000" "12EXC-0125","39TH AVE","VICENTE ST","WAWONA ST","Excavation","Pacific Gas & Electric","39th Ave.(Vicente & Wawona Sts)","2012-01-11 08:26:09","APPROVED","1881000" "12EXC-0129","MASON ST","POST ST","SUTTER ST","Excavation","Cable Com of California Inc","530 MASON ST","2012-01-11 14:46:43","APPROVED","8806000" "12EXC-0130","MOSCOW ST","AVALON AVE","EXCELSIOR AVE","Excavation","Pacific Gas & Electric","258 Moscow St.","2012-01-11 10:11:44","APPROVED","9398000" "12EXC-0132","CLARENCE PL","END","TOWNSEND ST","Excavation","San Francisco Water Department","178 Townsend - FIRE Pls see 11exc-4811","2012-01-10 10:04:52","APPROVED","4066000" "12EXC-0133","CLARENCE PL","END","TOWNSEND ST","Excavation","San Francisco Water Department","178 Townsend - Fire Hydrant on Clarence PL north of Townsend Pls see 11exc-4400","2012-01-10 10:18:48","APPROVED","4066000" "12EXC-0134","GENEVA AVE","MISSION ST","","Excavation","SBC - Pacific Bell Engineering","X1104 TO REPAIR DEFECT # 966666 AT GENEVA AVE & MISSION ST INTERSECTION","2012-01-13 13:35:10","APPROVED","21486000" "12EXC-0134","MISSION ST","GENEVA AVE","","Excavation","SBC - Pacific Bell Engineering","X1104 TO REPAIR DEFECT # 966666 AT GENEVA AVE & MISSION ST INTERSECTION","2012-01-13 13:35:10","APPROVED","21486000" "12EXC-0145","SANCHEZ ST","CLIPPER ST","26TH ST","Excavation","San Francisco Water Department","1268-1270 Sanchez","2012-01-13 15:58:51","APPROVED","11532000" "12EXC-0150","BRYANT ST","17TH ST","MARIPOSA ST","Excavation","San Francisco Water Department","1800 BRYANT ST","2012-01-13 16:20:02","APPROVED","3306000" "12EXC-0151","48TH AVE","LAWTON ST","MORAGA ST","Excavation","Pacific Gas & Electric","1668 48th Ave.","2012-01-13 15:08:59","APPROVED","2070000" "12EXC-0153","JACKSON ST","POWELL ST","DORIC ALY","Excavation","San Francisco Water Department","969 jackson","2012-01-13 16:31:16","APPROVED","7385000" "12EXC-0154","PARQUE DR","CIELITO DR","GENEVA AVE","Excavation","San Francisco Water Department","265 parque dr","2012-01-17 08:13:53","APPROVED","10298000" "12EXC-0155","SHRADER ST","RIVOLI ST","17TH ST","Excavation","San Francisco Water Department","1427 Shrader - FIRE","2012-01-17 08:44:24","APPROVED","11863000" "12EXC-0156","LISBON ST","FRANCE AVE","ITALY AVE","Excavation","Pacific Gas & Electric","619 Lisbon St.","2012-01-13 15:19:37","APPROVED","8411000" "12EXC-0157","03RD ST","KEITH ST \ LE CONTE AVE","","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","20548000" "12EXC-0157","03RD ST","LE CONTE AVE","","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","20467000" "12EXC-0157","KEITH ST","END","LE CONTE AVE","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","7796000" "12EXC-0157","KEITH ST","LE CONTE AVE","","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","20548000" "12EXC-0157","LE CONTE AVE","03RD ST","","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","20467000" "12EXC-0157","LE CONTE AVE","03RD ST","KEITH ST","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","8234000" "12EXC-0157","LE CONTE AVE","KEITH ST","","Excavation","J. Flores Construction Co.","Contract #WD-2415, Added Work, Install New 8" D.I. Water Main","2012-01-31 15:09:14","APPROVED","20548000" "12EXC-0158","SAN BRUNO AVE","BEEMAN LN","SOMERSET ST","Excavation","Pacific Gas & Electric","4000 San Bruno Ave.","2012-01-13 15:30:09","APPROVED","11395000" "12EXC-0159","NORIEGA ST","48TH AVE","GREAT HWY","Excavation","Pacific Gas & Electric","4114 and 4123 Noriega St.","2012-01-13 15:46:22","APPROVED","9683000" "12EXC-0160","HOWARD ST","SPEAR ST","","Excavation","Cable Com of California Inc","101 HOWARD ST","2012-01-25 07:38:53","APPROVED","24547000" "12EXC-0160","HOWARD ST","SPEAR ST","MAIN ST","Excavation","Cable Com of California Inc","101 HOWARD ST","2012-01-25 07:38:53","APPROVED","7029000" "12EXC-0160","HOWARD ST","STEUART ST","SPEAR ST","Excavation","Cable Com of California Inc","101 HOWARD ST","2012-01-25 07:38:53","APPROVED","7028000" "12EXC-0160","SPEAR ST","HOWARD ST","","Excavation","Cable Com of California Inc","101 HOWARD ST","2012-01-25 07:38:53","APPROVED","24547000" "12EXC-0161","02ND ST","HOWARD ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24540000" "12EXC-0161","02ND ST","JESSIE ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24605000" "12EXC-0161","02ND ST","JESSIE ST","MISSION ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","131000" "12EXC-0161","02ND ST","MARKET ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","30734000" "12EXC-0161","02ND ST","MARKET ST","STEVENSON ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","129000" "12EXC-0161","02ND ST","MINNA ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24594000" "12EXC-0161","02ND ST","MINNA ST","NATOMA ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","133000" "12EXC-0161","02ND ST","MISSION ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24597000" "12EXC-0161","02ND ST","MISSION ST","MINNA ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","132000" "12EXC-0161","02ND ST","NATOMA ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24543000" "12EXC-0161","02ND ST","NATOMA ST","HOWARD ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","134000" "12EXC-0161","02ND ST","STEVENSON ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24618000" "12EXC-0161","02ND ST","STEVENSON ST","JESSIE ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","130000" "12EXC-0161","AMBROSE BIERCE ST","NEW MONTGOMERY ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24611000" "12EXC-0161","ANNIE ST","JESSIE ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24615000" "12EXC-0161","ANNIE ST","STEVENSON ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24617000" "12EXC-0161","ANNIE ST","STEVENSON ST","JESSIE ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","2298000" "12EXC-0161","ECKER ST","STEVENSON ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24607000" "12EXC-0161","HOWARD ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24540000" "12EXC-0161","HOWARD ST","NEW MONTGOMERY ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24596000" "12EXC-0161","JESSIE ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24605000" "12EXC-0161","JESSIE ST","ANNIE ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24615000" "12EXC-0161","JESSIE ST","NEW MONTGOMERY ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24620000" "12EXC-0161","MARKET ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","30734000" "12EXC-0161","MINNA ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24594000" "12EXC-0161","MINNA ST","02ND ST","NEW MONTGOMERY ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9040000" "12EXC-0161","MINNA ST","NEW MONTGOMERY ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24599000" "12EXC-0161","MINNA ST","NEW MONTGOMERY ST","03RD ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9041000" "12EXC-0161","MISSION ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24597000" "12EXC-0161","MISSION ST","NEW MONTGOMERY ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24610000" "12EXC-0161","NATOMA ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24543000" "12EXC-0161","NEW MONTGOMERY ST","AMBROSE BIERCE ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24611000" "12EXC-0161","NEW MONTGOMERY ST","AMBROSE BIERCE ST","MISSION ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9543000" "12EXC-0161","NEW MONTGOMERY ST","HOWARD ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24596000" "12EXC-0161","NEW MONTGOMERY ST","JESSIE ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24620000" "12EXC-0161","NEW MONTGOMERY ST","JESSIE ST","AMBROSE BIERCE ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9542000" "12EXC-0161","NEW MONTGOMERY ST","MARKET ST \ MONTGOMERY ST","STEVENSON ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9540000" "12EXC-0161","NEW MONTGOMERY ST","MINNA ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24599000" "12EXC-0161","NEW MONTGOMERY ST","MINNA ST","NATOMA ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9545000" "12EXC-0161","NEW MONTGOMERY ST","MISSION ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24610000" "12EXC-0161","NEW MONTGOMERY ST","MISSION ST","MINNA ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9544000" "12EXC-0161","NEW MONTGOMERY ST","NATOMA ST","HOWARD ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9546000" "12EXC-0161","NEW MONTGOMERY ST","STEVENSON ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24621000" "12EXC-0161","NEW MONTGOMERY ST","STEVENSON ST","JESSIE ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","9541000" "12EXC-0161","STEVENSON ST","01ST ST","ECKER ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","12164000" "12EXC-0161","STEVENSON ST","02ND ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24618000" "12EXC-0161","STEVENSON ST","02ND ST","NEW MONTGOMERY ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","12166000" "12EXC-0161","STEVENSON ST","ANNIE ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24617000" "12EXC-0161","STEVENSON ST","ANNIE ST","03RD ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","12167000" "12EXC-0161","STEVENSON ST","ECKER ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24607000" "12EXC-0161","STEVENSON ST","ECKER ST","02ND ST","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","12165000" "12EXC-0161","STEVENSON ST","NEW MONTGOMERY ST","","Excavation","P & J Utility Company","8-inch Ductile Iron Pipe Main Installation in Second, New Montgomery, Stevenson, Minna and Annie Streets (San Francisco Water Power Sewer Contract No. WD-2445)","2012-01-20 14:53:53","ACTIVE","24621000" "12EXC-0162","SACRAMENTO ST","LARKIN ST","POLK ST","Excavation","Pacific Gas & Electric","1645-9 Sacramento St","2012-01-17 09:26:51","APPROVED","11247000" "12EXC-0163","17TH ST","HAMPSHIRE ST","","Excavation","Bureau of Street & Sewer Repair","INFRASTURCTURE DIVISION 17TH ST & HAMPSHIRE ST CURB RAMP","2012-01-13 12:20:44","APPROVED","24025000" "12EXC-0163","17TH ST","HAMPSHIRE ST","BRYANT ST","Excavation","Bureau of Street & Sewer Repair","INFRASTURCTURE DIVISION 17TH ST & HAMPSHIRE ST CURB RAMP","2012-01-13 12:20:44","APPROVED","787000" "12EXC-0163","HAMPSHIRE ST","17TH ST","","Excavation","Bureau of Street & Sewer Repair","INFRASTURCTURE DIVISION 17TH ST & HAMPSHIRE ST CURB RAMP","2012-01-13 12:20:44","APPROVED","24025000" "12EXC-0163","HAMPSHIRE ST","17TH ST","MARIPOSA ST","Excavation","Bureau of Street & Sewer Repair","INFRASTURCTURE DIVISION 17TH ST & HAMPSHIRE ST CURB RAMP","2012-01-13 12:20:44","APPROVED","6649000" "12EXC-0163","HAMPSHIRE ST","END","17TH ST","Excavation","Bureau of Street & Sewer Repair","INFRASTURCTURE DIVISION 17TH ST & HAMPSHIRE ST CURB RAMP","2012-01-13 12:20:44","APPROVED","6648000" "12EXC-0164","17TH ST","KANSAS ST","","Excavation","Bureau of Street & Sewer Repair","INFRASTUCTURE DIVISION 17TH ST & KANSANS ST CURB RAMP ","2012-01-13 12:43:49","APPROVED","23774000" "12EXC-0164","17TH ST","KANSAS ST","VERMONT ST","Excavation","Bureau of Street & Sewer Repair","INFRASTUCTURE DIVISION 17TH ST & KANSANS ST CURB RAMP ","2012-01-13 12:43:49","APPROVED","782000" "12EXC-0164","17TH ST","RHODE ISLAND ST","KANSAS ST","Excavation","Bureau of Street & Sewer Repair","INFRASTUCTURE DIVISION 17TH ST & KANSANS ST CURB RAMP ","2012-01-13 12:43:49","APPROVED","781000" "12EXC-0164","KANSAS ST","16TH ST","17TH ST","Excavation","Bureau of Street & Sewer Repair","INFRASTUCTURE DIVISION 17TH ST & KANSANS ST CURB RAMP ","2012-01-13 12:43:49","APPROVED","7727000" "12EXC-0164","KANSAS ST","17TH ST","","Excavation","Bureau of Street & Sewer Repair","INFRASTUCTURE DIVISION 17TH ST & KANSANS ST CURB RAMP ","2012-01-13 12:43:49","APPROVED","23774000" "12EXC-0164","KANSAS ST","17TH ST","MARIPOSA ST","Excavation","Bureau of Street & Sewer Repair","INFRASTUCTURE DIVISION 17TH ST & KANSANS ST CURB RAMP ","2012-01-13 12:43:49","APPROVED","7728000" "12EXC-0165","19TH AVE","STERN GROVE CT","SLOAT BLVD","Excavation","Pacific Gas & Electric","E/side 19th Ave, N of Sloat Blvd","2012-01-17 09:43:41","APPROVED","924103" "12EXC-0166","BRUSSELS ST","DWIGHT ST","OLMSTEAD ST","Excavation","Pacific Gas & Electric","732 Brussels St.","2012-01-17 10:42:47","APPROVED","3268000" "12EXC-0168","SANSOME ST","GREENWICH ST","LOMBARD ST","Excavation","Cable Com of California Inc","1 LOMBARD ST","2012-01-20 08:36:25","APPROVED","11560000" "12EXC-0169","SENECA AVE","CAYUGA AVE","DELANO AVE","Excavation","Pacific Gas & Electric","285 Seneca St.","2012-01-17 11:10:16","APPROVED","11761000" "12EXC-0170","GREAT HWY","MORAGA ST","NORIEGA ST","Excavation","Pacific Gas & Electric","1798 and 1770 Great Highway","2012-01-17 11:25:39","APPROVED","8513000" "12EXC-0171","GOUGH ST","HAIGHT ST","ROSE ST","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS ROSE ST & GOUGH ST","2012-01-13 12:52:18","APPROVED","6311000" "12EXC-0171","GOUGH ST","ROSE ST","","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS ROSE ST & GOUGH ST","2012-01-13 12:52:18","APPROVED","24453000" "12EXC-0171","ROSE ST","GOUGH ST","","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS ROSE ST & GOUGH ST","2012-01-13 12:52:18","APPROVED","24453000" "12EXC-0171","ROSE ST","MARKET ST","GOUGH ST","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS ROSE ST & GOUGH ST","2012-01-13 12:52:18","APPROVED","11151000" "12EXC-0172","23RD ST","POTRERO AVE","","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS POTRERO AVE & 23RD ST (DRIVEWAY)","2012-01-13 13:02:06","APPROVED","23963000" "12EXC-0172","23RD ST","UTAH ST","POTRERO AVE","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS POTRERO AVE & 23RD ST (DRIVEWAY)","2012-01-13 13:02:06","APPROVED","1252000" "12EXC-0172","POTRERO AVE","23RD ST","","Excavation","Bureau of Street & Sewer Repair","MAYOR'S OFFICE ON DISABILITY CURB RAMP DETAILS POTRERO AVE & 23RD ST (DRIVEWAY)","2012-01-13 13:02:06","APPROVED","23963000" "12EXC-0173","ANZA ST","BEAUMONT AVE","STANYAN BLVD","Excavation","Pacific Gas & Electric","800-02 Anza St","2012-01-17 11:31:36","APPROVED","2313000" "12EXC-0174","03RD ST","HOLLISTER AVE","INGERSON AVE","Excavation","Pacific Gas & Electric","6248 3rd St. Laundry Mat","2012-01-11 14:58:31","APPROVED","229201" "12EXC-0175","STEVENSON ST","07TH ST","END","Excavation","NRG Energy Center SF","Stevenson St btwn 7th & 8th St.","2012-01-19 15:18:43","APPROVED","12172000" "12EXC-0176","45TH AVE","MORAGA ST","NORIEGA ST","Excavation","Pacific Gas & Electric","E/side 45th Ave, N of Noriega St","2012-01-17 13:36:19","APPROVED","2003000" "12EXC-0184","NIAGARA AVE","MISSION ST","ALEMANY BLVD","Excavation","Pacific Gas & Electric","65 Niagara Ave.","2012-01-19 15:57:41","APPROVED","9591000" "12EXC-0185","FULTON ST","SHRADER ST","STANYAN ST","Excavation","Cable Com of California Inc","1 SHRADER ST","2012-01-20 08:45:41","APPROVED","5903000" "12EXC-0186","08TH ST","GROVE ST \ HYDE ST \ MARKET ST","","Excavation","Pacific Gas & Electric","Intersection of Market & 8th st.","2012-01-12 09:45:58","APPROVED","24429000" "12EXC-0186","GROVE ST","08TH ST \ HYDE ST \ MARKET ST","","Excavation","Pacific Gas & Electric","Intersection of Market & 8th st.","2012-01-12 09:45:58","APPROVED","24429000" "12EXC-0186","HYDE ST","08TH ST \ GROVE ST \ MARKET ST","","Excavation","Pacific Gas & Electric","Intersection of Market & 8th st.","2012-01-12 09:45:58","APPROVED","24429000" "12EXC-0186","MARKET ST","08TH ST \ GROVE ST \ HYDE ST","","Excavation","Pacific Gas & Electric","Intersection of Market & 8th st.","2012-01-12 09:45:58","APPROVED","24429000" "12EXC-0188","38TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Pacific Gas & Electric","2347 & 2382 38th Ave","2012-01-18 15:04:32","APPROVED","1859000" "12EXC-0189","GEARY BLVD","02ND AVE","03RD AVE","Excavation","Cable Com of California Inc","3809 GEARY BLVD","2012-01-19 15:38:01","APPROVED","6058201" "12EXC-0190","EDGAR AVE","END","NIAGARA AVE","Excavation","Pacific Gas & Electric","35 & 37 Edgar Ave","2012-01-18 15:12:57","APPROVED","5078000" "12EXC-0192","23RD ST","FOLSOM ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","23991000" "12EXC-0192","24TH ST","FOLSOM ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","23990000" "12EXC-0192","25TH ST","FOLSOM ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","23984000" "12EXC-0192","26TH ST","FOLSOM ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","21178000" "12EXC-0192","FOLSOM ST","22ND ST","23RD ST","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","5697000" "12EXC-0192","FOLSOM ST","23RD ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","23991000" "12EXC-0192","FOLSOM ST","23RD ST","24TH ST","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","5698000" "12EXC-0192","FOLSOM ST","24TH ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","23990000" "12EXC-0192","FOLSOM ST","25TH ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","23984000" "12EXC-0192","FOLSOM ST","25TH ST","26TH ST","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","5700000" "12EXC-0192","FOLSOM ST","26TH ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","21178000" "12EXC-0192","FOLSOM ST","KAMILLE CT","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","54058000" "12EXC-0192","KAMILLE CT","FOLSOM ST","","Excavation","A. Ruiz Construction Co.","As-Needed Main Sewer Replacement No. 1 (SFPUC Contract No. WW-488)","2012-01-13 16:28:45","APPROVED","54058000" "12EXC-0194","08TH AVE","FULTON ST","","Excavation","Cable Com of California Inc","55 CONCOURSE","2012-01-25 15:17:51","APPROVED","27258000" "12EXC-0194","FULTON ST","07TH AVE","08TH AVE","Excavation","Cable Com of California Inc","55 CONCOURSE","2012-01-25 15:17:51","APPROVED","5913000" "12EXC-0194","FULTON ST","08TH AVE","","Excavation","Cable Com of California Inc","55 CONCOURSE","2012-01-25 15:17:51","APPROVED","27258000" "12EXC-0194","FULTON ST","08TH AVE","09TH AVE","Excavation","Cable Com of California Inc","55 CONCOURSE","2012-01-25 15:17:51","APPROVED","5914000" "12EXC-0196","LOWER TER","LEVANT ST","ROOSEVELT WAY","Excavation","San Francisco Water Department","185 LOWER TERRACE","2012-01-19 13:23:27","APPROVED","8526000" "12EXC-0198","NORTON ST","MISSION ST","ALEMANY BLVD","Excavation","San Francisco Water Department","43 - 45 NORTON","2012-01-19 13:31:42","APPROVED","9714000" "12EXC-0200","KEARNY ST","DUNNES ALY","FRESNO ST","Excavation","San Francisco Water Department","1123 kearny","2012-01-19 14:17:05","APPROVED","7766000" "12EXC-0203","EDDY ST","LEAVENWORTH ST","HYDE ST","Excavation","NRG Energy Center SF","Eddy btwn Hyde & Leavenworth","2012-01-20 11:30:56","APPROVED","5062000" "12EXC-0204","PENNSYLVANIA AVE","20TH ST","22ND ST","Excavation","San Francisco Water Department","548 pennsylvania ave","2012-01-19 14:03:14","APPROVED","10335000" "12EXC-0207","SAN JOSE AVE","SERGEANT JOHN V YOUNG ST","OCEAN AVE","Excavation","Pacific Gas & Electric","2015 San Jose Ave","2012-01-19 16:07:56","APPROVED","11454000" "12EXC-0209","POST ST","LICK PL","KEARNY ST","Excavation","Pacific Gas & Electric","50 Post St.","2012-01-13 08:47:21","APPROVED","10624002" "12EXC-0210","WALLACE AVE","JENNINGS ST","KEITH ST","Excavation","Pacific Gas & Electric","IFO 1526 Wallace","2012-01-18 14:56:35","APPROVED","13356000" "12EXC-0211","CAYUGA AVE","OCEAN AVE","","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL14 - CAYUGA AVE & OCEAN AVE (BORE","2012-01-19 16:36:42","APPROVED","21758000" "12EXC-0211","CAYUGA AVE","OCEAN AVE","VALERTON CT","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL14 - CAYUGA AVE & OCEAN AVE (BORE","2012-01-19 16:36:42","APPROVED","3832000" "12EXC-0211","CAYUGA AVE","SANTA YNEZ AVE","","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL14 - CAYUGA AVE & OCEAN AVE (BORE","2012-01-19 16:36:42","APPROVED","33020000" "12EXC-0211","CAYUGA AVE","SANTA YNEZ AVE","OCEAN AVE","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL14 - CAYUGA AVE & OCEAN AVE (BORE","2012-01-19 16:36:42","APPROVED","3831000" "12EXC-0211","OCEAN AVE","CAYUGA AVE","","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL14 - CAYUGA AVE & OCEAN AVE (BORE","2012-01-19 16:36:42","APPROVED","21758000" "12EXC-0211","SANTA YNEZ AVE","CAYUGA AVE","","Excavation","NextG Networks of California, Inc","CLW1001CAPH2UFL14 - CAYUGA AVE & OCEAN AVE (BORE","2012-01-19 16:36:42","APPROVED","33020000" "12EXC-0214","CAYUGA AVE","SICKLES AVE","","Excavation","Pacific Gas & Electric","Ints Sickles Av/Cayuga Av & Sickles Av/Sears St","2012-01-20 12:11:30","APPROVED","21582000" "12EXC-0214","SEARS ST","SICKLES AVE","","Excavation","Pacific Gas & Electric","Ints Sickles Av/Cayuga Av & Sickles Av/Sears St","2012-01-20 12:11:30","APPROVED","21583000" "12EXC-0214","SICKLES AVE","CAYUGA AVE","","Excavation","Pacific Gas & Electric","Ints Sickles Av/Cayuga Av & Sickles Av/Sears St","2012-01-20 12:11:30","APPROVED","21582000" "12EXC-0214","SICKLES AVE","SEARS ST","","Excavation","Pacific Gas & Electric","Ints Sickles Av/Cayuga Av & Sickles Av/Sears St","2012-01-20 12:11:30","APPROVED","21583000" "12EXC-0231","SPEAR ST","MISSION ST","HOWARD ST","Excavation","ABOVE NET COMMUNICATIONS, INC.","Building Connection (150 Spear Street)","2012-01-13 14:54:54","APPROVED","12045000" "12EXC-0234","17TH ST","BRYANT ST","FLORIDA ST","Excavation","J. Flores Construction Co.","Spot Sewer 26, Contract #WW-520, Work Order 9, PUC#SW00564171, 2700 17th St @ Bryant St / Florida St.","2012-01-20 10:46:41","APPROVED","788000" "12EXC-0236","CALIFORNIA ST","LAGUNA ST","BUCHANAN ST","Excavation","Pacific Gas & Electric","IFO 2150 CALIFORNIA","2012-01-18 15:21:11","APPROVED","3554000" "12EXC-0238","02ND ST","MISSION ST","","Excavation","Pacific Gas & Electric","N/E/C 2nd St. and Mission St.","2012-01-20 15:31:13","APPROVED","24597000" "12EXC-0238","MISSION ST","02ND ST","","Excavation","Pacific Gas & Electric","N/E/C 2nd St. and Mission St.","2012-01-20 15:31:13","APPROVED","24597000" "12EXC-0239","CLARENDON AVE","BIGLER AVE \ TWIN PEAKS BLVD","STANYAN ST","Excavation","San Francisco Water Department","1410 Stanyan (On Clarendon/Stanyan), see 11exc-4810","2012-01-20 12:41:19","APPROVED","4067000" "12EXC-0240","GROVE ST","GOUGH ST","OCTAVIA ST","Excavation","San Francisco Water Department","401 Grove west of Gough St - NOT CalTrans, see 11exc-4637","2012-01-20 12:56:58","APPROVED","6557000" "12EXC-0241","VALENCIA ST","SYCAMORE ST","18TH ST","Excavation","San Francisco Water Department","680 Valencia - FIRE, see 11exc-4804","2012-01-20 13:39:06","ACTIVE","13063000" "12EXC-0242","BEACH ST","TAYLOR ST","JONES ST","Excavation","San Francisco Water Department","420 Beach St, see 11exc-5090","2012-01-20 13:50:39","APPROVED","2842000" "12EXC-0243","PORTOLA DR","OSHAUGHNESSY BLVD \ WOODSIDE AVE","FOWLER AVE \ SYDNEY WAY","Excavation","Pacific Gas & Electric","IN FRONT OF 610 PORTOLA DRIVE","2012-01-18 09:04:43","APPROVED","10615201" "12EXC-0245","07TH AVE","JUDAH ST","","Excavation","San Francisco Water Department","intersection 7th and judah","2012-01-20 14:23:33","APPROVED","27143000" "12EXC-0245","JUDAH ST","07TH AVE","","Excavation","San Francisco Water Department","intersection 7th and judah","2012-01-20 14:23:33","APPROVED","27143000" "12EXC-0246","06TH AVE","IRVING ST","JUDAH ST","Excavation","San Francisco Water Department","EAST SIDE 6TH AVE - S/ IRVING","2012-01-20 14:47:52","APPROVED","323000" "12EXC-0248","CASTRO ST","21ST ST","HILL ST","Excavation","Pacific Gas & Electric","811 Castro St.","2012-01-20 15:40:41","APPROVED","3795000" "12EXC-0251","17TH ST","CORBIN PL","","Excavation","San Francisco Water Department","intersection corbin and 17th street","2012-01-20 14:58:37","APPROVED","32935000" "12EXC-0251","CORBIN PL","17TH ST","","Excavation","San Francisco Water Department","intersection corbin and 17th street","2012-01-20 14:58:37","APPROVED","32935000" "12EXC-0252","31ST AVE","NORIEGA ST","ORTEGA ST","Excavation","Pacific Gas & Electric","1878 31st Ave.","2012-01-20 15:53:13","APPROVED","1689000" "12EXC-0254","MAYNARD ST","CRAUT ST","CONGDON ST","Excavation","San Francisco Water Department","166 maynard","2012-01-20 15:12:36","APPROVED","8881000" "12EXC-0255","WAYLAND ST","GIRARD ST","BRUSSELS ST","Excavation","Pacific Gas & Electric","218 Wayland St.","2012-01-20 16:23:45","APPROVED","13505000" "12EXC-0256","PUEBLO ST","VELASCO AVE","END","Excavation","San Francisco Water Department","54 pueblo st","2012-01-20 15:20:29","APPROVED","10796000" "12EXC-0258","LEAVENWORTH ST","OFARRELL ST","GEARY ST","Excavation","Pacific Gas & Electric","535 Leavenwoth St","2012-01-20 16:32:32","APPROVED","8243000" "12EXC-0259","ATHENS ST","PERSIA AVE","RUSSIA AVE","Excavation","Pacific Gas & Electric","554 Athens St.","2012-01-23 07:54:45","APPROVED","2537000" "12EXC-0260","LARKIN ST","MCALLISTER ST","","Excavation","SBC - Pacific Bell Engineering","8492257","2012-01-19 14:42:42","APPROVED","24439000" "12EXC-0260","MCALLISTER ST","LARKIN ST","","Excavation","SBC - Pacific Bell Engineering","8492257","2012-01-19 14:42:42","APPROVED","24439000" "12EXC-0261","BRUNSWICK ST","WHITTIER ST","OLIVER ST","Excavation","Pacific Gas & Electric","753 brunswick St","2012-01-23 08:51:24","ACTIVE","3260000" "12EXC-0265","SPEAR ST","MARKET ST","MISSION ST","Excavation","Pacific Gas & Electric","65 SPEAR ST S.F.","2012-01-23 09:45:40","APPROVED","12044000" "12EXC-0267","GEARY BLVD","STEINER ST","SCOTT ST","Excavation","Pacific Gas & Electric","Replace Existing Splice Box","2012-01-23 09:55:37","APPROVED","6042101" "12EXC-0269","DUBOCE AVE","BELCHER ST","SANCHEZ ST","Excavation","San Francisco Water Department","469 Duboce Ave - Pls See 11exc-0269","2012-01-23 10:12:33","APPROVED","4987000" "12EXC-0270","SAN JOSE AVE","END","LAKEVIEW AVE","Excavation","Pacific Gas & Electric","2613 San Jose Ave.","2012-01-24 08:18:39","APPROVED","11463000" "12EXC-0272","TARAVAL ST","38TH AVE","39TH AVE","Excavation","Pacific Gas & Electric","2833 Taraval St.","2012-01-24 08:33:42","APPROVED","12415000" "12EXC-0273","46TH AVE","VICENTE ST","WAWONA ST","Excavation","Pacific Gas & Electric","2670 46th Ave.","2012-01-24 08:39:33","APPROVED","2034000" "12EXC-0274","14TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Pacific Gas & Electric","2368 and 2380 14th Ave.","2012-01-23 15:20:21","ACTIVE","572000" "12EXC-0275","JUDAH ST","46TH AVE","47TH AVE","Excavation","Pacific Gas & Electric","1396 47th Ave.(Svc. off Judah St)","2012-01-24 08:44:48","APPROVED","7683000" "12EXC-0276","43RD AVE","JUDAH ST","KIRKHAM ST","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 43RD AVE & KIRKHAM ST (ENTIRE INTERSECTION) CURB RAMP DETAILS","2012-01-23 10:50:44","APPROVED","1956000" "12EXC-0276","43RD AVE","KIRKHAM ST","","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 43RD AVE & KIRKHAM ST (ENTIRE INTERSECTION) CURB RAMP DETAILS","2012-01-23 10:50:44","APPROVED","27778000" "12EXC-0276","43RD AVE","KIRKHAM ST","LAWTON ST","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 43RD AVE & KIRKHAM ST (ENTIRE INTERSECTION) CURB RAMP DETAILS","2012-01-23 10:50:44","APPROVED","1957000" "12EXC-0276","KIRKHAM ST","42ND AVE","43RD AVE","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 43RD AVE & KIRKHAM ST (ENTIRE INTERSECTION) CURB RAMP DETAILS","2012-01-23 10:50:44","APPROVED","7882000" "12EXC-0276","KIRKHAM ST","43RD AVE","","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 43RD AVE & KIRKHAM ST (ENTIRE INTERSECTION) CURB RAMP DETAILS","2012-01-23 10:50:44","APPROVED","27778000" "12EXC-0276","KIRKHAM ST","43RD AVE","44TH AVE","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 43RD AVE & KIRKHAM ST (ENTIRE INTERSECTION) CURB RAMP DETAILS","2012-01-23 10:50:44","APPROVED","7883000" "12EXC-0278","42ND AVE","KIRKHAM ST","","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 42ND AVE & KIRKHAM ST (ENTIRE INTERSECTION)","2012-01-23 11:02:06","APPROVED","27774000" "12EXC-0278","43RD AVE","JUDAH ST","KIRKHAM ST","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 42ND AVE & KIRKHAM ST (ENTIRE INTERSECTION)","2012-01-23 11:02:06","APPROVED","1956000" "12EXC-0278","43RD AVE","KIRKHAM ST","LAWTON ST","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 42ND AVE & KIRKHAM ST (ENTIRE INTERSECTION)","2012-01-23 11:02:06","APPROVED","1957000" "12EXC-0278","KIRKHAM ST","42ND AVE","","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 42ND AVE & KIRKHAM ST (ENTIRE INTERSECTION)","2012-01-23 11:02:06","APPROVED","27774000" "12EXC-0278","KIRKHAM ST","42ND AVE","43RD AVE","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 42ND AVE & KIRKHAM ST (ENTIRE INTERSECTION)","2012-01-23 11:02:06","APPROVED","7882000" "12EXC-0278","KIRKHAM ST","43RD AVE","44TH AVE","Excavation","Bureau of Street & Sewer Repair","SFUSD PHASE 3B ACCESSIBILITY IMPROVEMENTS FRANCIS SCOTT KEY ELEMENTARY SCHOOL 42ND AVE & KIRKHAM ST (ENTIRE INTERSECTION)","2012-01-23 11:02:06","APPROVED","7883000" "12EXC-0280","SHRADER ST","HAIGHT ST","WALLER ST","Excavation","San Francisco Water Department","624 SHRADER","2012-01-24 10:47:46","APPROVED","11856000" "12EXC-0284","MARKET ST","12TH ST \ PAGE ST","FRANKLIN ST","Excavation","Pacific Gas & Electric","1601 Market St.","2012-01-24 08:51:35","APPROVED","8756101" "12EXC-0285","DUBLIN ST","RUSSIA AVE","END","Excavation","Pacific Gas & Electric","250 Dublin St.","2012-01-24 08:58:27","APPROVED","4977000" "12EXC-0286","GOLDEN GATE AVE","JONES ST","","Excavation","Pacific Gas & Electric","S/W/C Golden Gate and Jones Sts.","2012-01-23 14:09:19","APPROVED","24326000" "12EXC-0286","JONES ST","GOLDEN GATE AVE","","Excavation","Pacific Gas & Electric","S/W/C Golden Gate and Jones Sts.","2012-01-23 14:09:19","APPROVED","24326000" "12EXC-0287","EDDY ST","TAYLOR ST","JONES ST","Excavation","Pacific Gas & Electric","N/O Eddy W/O Taylor Sts.","2012-01-20 10:58:22","APPROVED","5060000" "12EXC-0288","RUTLAND ST","SUNNYDALE AVE","","Excavation","Super Excavators, Inc.","Sunnydale Auxiliary Sewer Project (SFPUC Contract No. WW-487)","2012-01-20 16:37:48","ACTIVE","20352000" "12EXC-0288","SUNNYDALE AVE","RUTLAND ST","","Excavation","Super Excavators, Inc.","Sunnydale Auxiliary Sewer Project (SFPUC Contract No. WW-487)","2012-01-20 16:37:48","ACTIVE","20352000" "12EXC-0289","18TH ST","ARKANSAS ST","CAROLINA ST","Excavation","Pacific Gas & Electric","1635 18th Street","2012-01-24 09:07:12","APPROVED","858000" "12EXC-0290","HAIGHT ST","MASONIC AVE","ASHBURY ST","Excavation","Pacific Gas & Electric","1433 Haight St.","2012-01-24 09:14:31","APPROVED","6618000" "12EXC-0291","BRENTWOOD AVE","COLON AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22801000" "12EXC-0291","BRENTWOOD AVE","COLON AVE","YERBA BUENA AVE","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","3110000" "12EXC-0291","BRENTWOOD AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22682000" "12EXC-0291","BRENTWOOD AVE","FERNWOOD DR \ ROSEWOOD DR \ UNNAMED 040","MAYWOOD DR","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","3112000" "12EXC-0291","BRENTWOOD AVE","HAZELWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22799000" "12EXC-0291","BRENTWOOD AVE","HAZELWOOD AVE","VALDEZ AVE","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","3108000" "12EXC-0291","BRENTWOOD AVE","MAYWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22689000" "12EXC-0291","BRENTWOOD AVE","VALDEZ AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22800000" "12EXC-0291","BRENTWOOD AVE","VALDEZ AVE","COLON AVE","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","3109000" "12EXC-0291","CASITAS AVE","HAZELWOOD AVE \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22810000" "12EXC-0291","COLON AVE","BRENTWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22801000" "12EXC-0291","FERNWOOD DR","BRENTWOOD AVE \ ROSEWOOD DR \ UNNAMED 040","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22682000" "12EXC-0291","FERNWOOD DR","RAVENWOOD DR \ ROSEWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22813000" "12EXC-0291","FERNWOOD DR","RAVENWOOD DR \ ROSEWOOD DR","BRENTWOOD AVE \ ROSEWOOD DR \ UNNAMED 040","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","5486000" "12EXC-0291","HAZELWOOD AVE","BRENTWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22799000" "12EXC-0291","HAZELWOOD AVE","CASITAS AVE \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22810000" "12EXC-0291","MAYWOOD DR","BRENTWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22689000" "12EXC-0291","MAYWOOD DR","BRENTWOOD AVE","EL VERANO WAY","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","8886000" "12EXC-0291","MAYWOOD DR","RAVENWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22816000" "12EXC-0291","MAYWOOD DR","RAVENWOOD DR","BRENTWOOD AVE","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","8885000" "12EXC-0291","MAYWOOD DR","YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22818000" "12EXC-0291","MAYWOOD DR","YERBA BUENA AVE","RAVENWOOD DR","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","8884000" "12EXC-0291","MIRALOMA DR","RAVENWOOD DR \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22811000" "12EXC-0291","RAVENWOOD DR","FERNWOOD DR \ ROSEWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22813000" "12EXC-0291","RAVENWOOD DR","FERNWOOD DR \ ROSEWOOD DR","MAYWOOD DR","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","10938000" "12EXC-0291","RAVENWOOD DR","MAYWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22816000" "12EXC-0291","RAVENWOOD DR","MIRALOMA DR \ YERBA BUENA AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22811000" "12EXC-0291","RAVENWOOD DR","MIRALOMA DR \ YERBA BUENA AVE","FERNWOOD DR \ ROSEWOOD DR","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","10937000" "12EXC-0291","ROSEWOOD DR","BRENTWOOD AVE \ FERNWOOD DR \ UNNAMED 040","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22682000" "12EXC-0291","ROSEWOOD DR","FERNWOOD DR \ RAVENWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22813000" "12EXC-0291","ROSEWOOD DR","FERNWOOD DR \ RAVENWOOD DR","BRENTWOOD AVE \ FERNWOOD DR \ UNNAMED 040","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","11161000" "12EXC-0291","UNNAMED 040","BRENTWOOD AVE \ FERNWOOD DR \ ROSEWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22682000" "12EXC-0291","VALDEZ AVE","BRENTWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22800000" "12EXC-0291","YERBA BUENA AVE","BAXTER ALY","CASITAS AVE \ HAZELWOOD AVE","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","13751000" "12EXC-0291","YERBA BUENA AVE","CASITAS AVE \ HAZELWOOD AVE","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22810000" "12EXC-0291","YERBA BUENA AVE","CASITAS AVE \ HAZELWOOD AVE","BRENTWOOD AVE","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","13752000" "12EXC-0291","YERBA BUENA AVE","MAYWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22818000" "12EXC-0291","YERBA BUENA AVE","MAYWOOD DR","MIRALOMA DR \ RAVENWOOD DR","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","13749000" "12EXC-0291","YERBA BUENA AVE","MIRALOMA DR \ RAVENWOOD DR","","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","22811000" "12EXC-0291","YERBA BUENA AVE","MIRALOMA DR \ RAVENWOOD DR","BAXTER ALY","Excavation","Pacific Gas & Electric","Monterey 5 GPRP Project","2012-01-20 13:36:55","APPROVED","13750000" "12EXC-0292","18TH ST","CASTRO ST","COLLINGWOOD ST","Excavation","Phoenix Electric Company","Church and Duboce Track Improvement Project","2012-01-20 10:26:37","APPROVED","892000" "12EXC-0292","18TH ST","HARTFORD ST","CASTRO ST","Excavation","Phoenix Electric Company","Church and Duboce Track Improvement Project","2012-01-20 10:26:37","APPROVED","891000" "12EXC-0292","CASTRO ST","17TH ST \ MARKET ST","18TH ST","Excavation","Phoenix Electric Company","Church and Duboce Track Improvement Project","2012-01-20 10:26:37","APPROVED","3790000" "12EXC-0292","DIVISADERO ST","FELL ST","HAYES ST","Excavation","Phoenix Electric Company","Church and Duboce Track Improvement Project","2012-01-20 10:26:37","APPROVED","4802101" "12EXC-0292","HAYES ST","SCOTT ST","DIVISADERO ST","Excavation","Phoenix Electric Company","Church and Duboce Track Improvement Project","2012-01-20 10:26:37","APPROVED","6824000" "12EXC-0295","NATOMA ST","RUSS ST","07TH ST","Excavation","Cable Com of California Inc","568 NATOMA ST","2012-01-27 15:05:53","APPROVED","9513000" "12EXC-0297","SANSOME ST","PACIFIC AVE","BROADWAY","Excavation","Cable Com of California Inc","394 PACIFIC AVE","2012-01-25 08:30:55","APPROVED","11554000" "12EXC-0298","07TH ST","BRANNAN ST","TOWNSEND ST","Excavation","Cable Com of California Inc","600 TOWNSEND ST","2012-01-30 11:25:29","APPROVED","376000" "12EXC-0299","FREMONT ST","FRONT ST \ MARKET ST","MISSION ST","Excavation","Cable Com of California Inc","50 FREMONT ST","2012-01-25 09:59:03","APPROVED","5860000" "12EXC-0299","FREMONT ST","MISSION ST","","Excavation","Cable Com of California Inc","50 FREMONT ST","2012-01-25 09:59:03","APPROVED","24560000" "12EXC-0299","MISSION ST","FREMONT ST","","Excavation","Cable Com of California Inc","50 FREMONT ST","2012-01-25 09:59:03","APPROVED","24560000" "12EXC-0302","AUSTIN ST","GOUGH ST","OCTAVIA ST","Excavation","Cable Com of California Inc","1710 OCTAVIA ST","2012-01-25 10:53:49","APPROVED","5794000" "12EXC-0305","04TH ST","HOWARD ST","","Excavation","Synergy Project Management","SFMTA # 1251 Pothole Investigation Union Square and Market Street Utility Relocation","2012-02-01 07:47:54","APPROVED","24627000" "12EXC-0305","04TH ST","HOWARD ST","CLEMENTINA ST","Excavation","Synergy Project Management","SFMTA # 1251 Pothole Investigation Union Square and Market Street Utility Relocation","2012-02-01 07:47:54","APPROVED","254000" "12EXC-0305","HOWARD ST","04TH ST","","Excavation","Synergy Project Management","SFMTA # 1251 Pothole Investigation Union Square and Market Street Utility Relocation","2012-02-01 07:47:54","APPROVED","24627000" "12EXC-0318","37TH AVE","TARAVAL ST","ULLOA ST","Excavation","Pacific Gas & Electric","2427 37th Ave.","2012-01-24 11:49:51","APPROVED","1838000" "12EXC-0319","CALIFORNIA ST","FILLMORE ST","STEINER ST","Excavation","SBC - Pacific Bell Engineering","R207 8587017 4C","2012-01-25 13:47:14","APPROVED","3558000" "12EXC-0320","03RD ST","16TH ST","MARIPOSA ST","Excavation","Pacific Gas & Electric","W/S 3rd St. 100' S/O 16th St.","2012-01-24 13:15:30","APPROVED","186201" "12EXC-0325","LOMBARD ST","HYDE ST","LARKIN ST","Excavation","SBC - Pacific Bell Engineering","R207 8599184 4C","2012-01-25 13:54:33","APPROVED","8450000" "12EXC-0326","03RD ST","16TH ST","MARIPOSA ST","Excavation","San Francisco Water Department","1800 3rd Street","2012-01-25 13:36:20","APPROVED","186201" "12EXC-0327","JUNIPERO SERRA BLVD","MERCEDES WAY \ WINSTON DR","ESTERO AVE","Excavation","SBC - Pacific Bell Engineering","Repair collapsed conduit to serve 157 Lunado Way","2012-01-25 14:02:06","APPROVED","7708101" "12EXC-0328","19TH ST","DIAMOND ST","EUREKA ST","Excavation","Pacific Gas & Electric","4314 19th St.","2012-01-24 13:35:34","APPROVED","987000" "12EXC-0332","SUNNYDALE AVE","DESMOND ST","TALBERT ST","Excavation","Pacific Gas & Electric","N/S SUNNYDALE E/O TALBERT","2012-01-24 14:14:30","APPROVED","12257000" "12EXC-0333","ULLOA ST","23RD AVE","24TH AVE","Excavation","Pacific Gas & Electric","2243 Ulloa St.","2012-01-26 08:39:38","APPROVED","12800000" "12EXC-0334","DOLORES ST","21ST ST","22ND ST","Excavation","Pacific Gas & Electric","827-9 Dolores St.","2012-01-26 08:55:23","APPROVED","4875101" "12EXC-0335","11TH AVE","LINCOLN WAY","IRVING ST","Excavation","Pacific Gas & Electric","1235 and 1246 11th Ave.","2012-01-26 09:04:20","APPROVED","500000" "12EXC-0338","BROADWAY","HIMMELMANN PL","TAYLOR ST","Excavation","Pacific Gas & Electric","S/S Broadway W/O Himmelman","2012-01-24 14:37:26","APPROVED","3160000" "12EXC-0339","EUCALYPTUS DR","21ST AVE","22ND AVE","Excavation","Pacific Gas & Electric","S/S Eucalyptus E/O 22nd Ave.","2012-01-24 14:54:01","APPROVED","5271000" "12EXC-0340","YORK ST","25TH ST","26TH ST","Excavation","Pacific Gas & Electric","1332 York St.","2012-01-24 15:07:40","APPROVED","13774000" "12EXC-0341","FILBERT ST","HYDE ST","LARKIN ST","Excavation","Pacific Gas & Electric","N/S Filbert W/O Hyde","2012-01-24 15:18:00","APPROVED","5512000" "12EXC-0342","FILBERT ST","LARKIN ST","POLK ST","Excavation","Pacific Gas & Electric","1384 Filbert St.","2012-01-24 15:27:04","APPROVED","5513000" "12EXC-0351","PACIFIC AVE","OSGOOD PL","MONTGOMERY ST","Excavation","SBC - Pacific Bell Engineering","8587694 - NEW SERVICE 450 PACIFIC AVE","2012-01-26 10:13:29","APPROVED","10121000" "12EXC-0352","MARKET ST","SOUTH VAN NESS AVE \ VAN NESS AVE","","Excavation","Pacific Gas & Electric","Van Ness @ Market","2012-01-26 13:25:10","APPROVED","30748000" "12EXC-0352","SOUTH VAN NESS AVE","MARKET ST \ VAN NESS AVE","","Excavation","Pacific Gas & Electric","Van Ness @ Market","2012-01-26 13:25:10","APPROVED","30748000" "12EXC-0352","VAN NESS AVE","MARKET ST \ SOUTH VAN NESS AVE","","Excavation","Pacific Gas & Electric","Van Ness @ Market","2012-01-26 13:25:10","APPROVED","30748000" "12EXC-0353","MUNICH ST","EXCELSIOR AVE \ INA CT","BRAZIL AVE","Excavation","Trinet Construction Inc.","La Grande Pump Station Upgrades (SFPUC Contract No. WD-2558)","2012-01-23 10:38:40","ACTIVE","9447000" "12EXC-0354","ARGUELLO BLVD","CARL ST","","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","27062000" "12EXC-0354","CARL ST","ARGUELLO BLVD","","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","27062000" "12EXC-0354","CARL ST","COLE ST","SHRADER ST","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","3695000" "12EXC-0354","CARL ST","HILLWAY AVE","ARGUELLO BLVD","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","3699000" "12EXC-0354","CARL ST","SHRADER ST","STANYAN ST","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","3696000" "12EXC-0354","CARL ST","STANYAN ST","","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","26303000" "12EXC-0354","CARL ST","WILLARD ST","HILLWAY AVE","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","3698000" "12EXC-0354","STANYAN ST","CARL ST","","Excavation","Shimmick Construction Co., Inc.","N-Line Along Carl Street Track Improvement Project (SFMTA Contract No. 1248)","2012-01-23 11:22:33","APPROVED","26303000" "12EXC-0355","CROWN TER","PEMBERTON PL","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","32954000" "12EXC-0355","CROWN TER","PEMBERTON PL","CROWN CT \ RACCOON DR","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","4541000" "12EXC-0355","CROWN TER","TWIN PEAKS BLVD","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","26258000" "12EXC-0355","CROWN TER","TWIN PEAKS BLVD","PEMBERTON PL","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","4540000" "12EXC-0355","GRAYSTONE TER","PEMBERTON PL","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","32953000" "12EXC-0355","GRAYSTONE TER","TWIN PEAKS BLVD","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","26257000" "12EXC-0355","PEMBERTON PL","CROWN TER","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","32954000" "12EXC-0355","PEMBERTON PL","GRAYSTONE TER","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","32953000" "12EXC-0355","PEMBERTON PL","GRAYSTONE TER","CROWN TER","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","10325000" "12EXC-0355","TWIN PEAKS BLVD","CROWN TER","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","26258000" "12EXC-0355","TWIN PEAKS BLVD","CROWN TER","BIGLER AVE \ CLARENDON AVE","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","12762000" "12EXC-0355","TWIN PEAKS BLVD","GRAYSTONE TER","","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","26257000" "12EXC-0355","TWIN PEAKS BLVD","GRAYSTONE TER","CROWN TER","Excavation","Pacific Gas & Electric","Crown Terrace GPRP Project","2012-01-25 11:01:45","APPROVED","12761000" "12EXC-0357","BEMIS ST","MIGUEL ST","","Excavation","Pacific Gas & Electric","IFO #1 BEMIS ST and Intersection of Bemis & Miguel","2012-01-26 09:22:10","APPROVED","21873000" "12EXC-0357","BEMIS ST","MIGUEL ST","ADDISON ST","Excavation","Pacific Gas & Electric","IFO #1 BEMIS ST and Intersection of Bemis & Miguel","2012-01-26 09:22:10","APPROVED","2915000" "12EXC-0357","MIGUEL ST","BEMIS ST","","Excavation","Pacific Gas & Electric","IFO #1 BEMIS ST and Intersection of Bemis & Miguel","2012-01-26 09:22:10","APPROVED","21873000" "12EXC-0357","MIGUEL ST","BEMIS ST","LAIDLEY ST","Excavation","Pacific Gas & Electric","IFO #1 BEMIS ST and Intersection of Bemis & Miguel","2012-01-26 09:22:10","APPROVED","9023000" "12EXC-0358","07TH ST","HOWARD ST","","Excavation","Pacific Gas & Electric","7th St.(Howard to Folsom Sts.)","2012-01-25 14:40:17","APPROVED","24265000" "12EXC-0358","07TH ST","HOWARD ST","FOLSOM ST","Excavation","Pacific Gas & Electric","7th St.(Howard to Folsom Sts.)","2012-01-25 14:40:17","APPROVED","371000" "12EXC-0358","HOWARD ST","07TH ST","","Excavation","Pacific Gas & Electric","7th St.(Howard to Folsom Sts.)","2012-01-25 14:40:17","APPROVED","24265000" "12EXC-0359","BRUSSELS ST","WOOLSEY ST","DWIGHT ST","Excavation","Pacific Gas & Electric","625 Brussels St.","2012-01-26 13:32:08","APPROVED","3267000" "12EXC-0360","BRUSSELS ST","WAYLAND ST","WOOLSEY ST","Excavation","Pacific Gas & Electric","545 Brussels St.","2012-01-26 13:38:49","APPROVED","3266000" "12EXC-0366","MONTEREY BLVD","EDNA ST","EDNA ST","Excavation","J. Flores Construction Co.","Spot Sewer 26 Contract #WW-520, Work Order 14, PUC #1327933/SW00553146, 500, 550 & 558 Monterey Blvd. @ Edna","2012-01-27 08:15:41","APPROVED","9276201" "12EXC-0366","MONTEREY BLVD","EDNA ST","FOERSTER ST","Excavation","J. Flores Construction Co.","Spot Sewer 26 Contract #WW-520, Work Order 14, PUC #1327933/SW00553146, 500, 550 & 558 Monterey Blvd. @ Edna","2012-01-27 08:15:41","APPROVED","9277201" "12EXC-0367","17TH ST","SHOTWELL ST","SOUTH VAN NESS AVE","Excavation","J. Flores Construction Co.","Spot Sewer 26, Contract #WW-520, Work Order 9, PUC #778827/SW00548773/1236235, 3154, 3178 & 3189 17th Street @ Shotwell St/ South Van Ness Ave.","2012-01-26 15:09:57","APPROVED","794000" "12EXC-0368","17TH ST","SOUTH VAN NESS AVE","CAPP ST","Excavation","J. Flores Construction Co.","Spot Sewer 26, Contract #WW-520, Work Order 9, PUC #1228999/1229013, 3226 & 3236 17th Street @ South Van Ness Ave / Capp St.","2012-01-27 10:44:37","APPROVED","795000" "12EXC-0369","PENNSYLVANIA AVE","18TH ST","19TH ST","Excavation","J. Flores Construction Co.","Spot Sewer 26, Contract #WW-520, Work Order 14, PUC #SW00546889/1334063, 372 & 385 Pennsylvania Ave @ 18th St / 19th St","2012-01-26 13:02:02","APPROVED","10333000" "12EXC-0371","ELM ST","PIERCE ST","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26064000" "12EXC-0371","ELM ST","PIERCE ST","END","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","5205000" "12EXC-0371","ELM ST","SCOTT ST","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26069000" "12EXC-0371","GOLDEN GATE AVE","PIERCE ST","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26062000" "12EXC-0371","GOLDEN GATE AVE","PIERCE ST","SCOTT ST","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","6273000" "12EXC-0371","GOLDEN GATE AVE","SCOTT ST","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26065000" "12EXC-0371","PIERCE ST","ELM ST","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26064000" "12EXC-0371","PIERCE ST","ELM ST","TURK ST","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","10426000" "12EXC-0371","PIERCE ST","GOLDEN GATE AVE","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26062000" "12EXC-0371","PIERCE ST","GOLDEN GATE AVE","ELM ST","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","10425000" "12EXC-0371","SCOTT ST","ELM ST","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26069000" "12EXC-0371","SCOTT ST","GOLDEN GATE AVE","","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","26065000" "12EXC-0371","SCOTT ST","GOLDEN GATE AVE","ELM ST","Excavation","SBC - Pacific Bell Engineering","R207 8373838 4C","2012-01-26 13:47:29","APPROVED","11692000" "12EXC-0372","GROVE ST","LYON ST","CENTRAL AVE","Excavation","J. Flores Construction Co.","Spot Sewer 26 Contract #WW-520, Work Order 14, PUC # 1337855/1079716/SW00641870, 1641-49, 1672, 1675 Grove Street","2012-01-26 13:11:52","APPROVED","6567000" "12EXC-0375","GEARY ST","POLK ST","GEARY BLVD \ VAN NESS AVE","Excavation","San Francisco Water Department","1029 GEARY ST","2012-01-26 15:20:51","APPROVED","6118000" "12EXC-0379","FOERSTER ST","LOS PALMOS DR","GATUN ALY","Excavation","San Francisco Water Department","828 foerster st","2012-01-26 15:30:52","APPROVED","5647000" "12EXC-0380","COLLINGWOOD ST","20TH ST","21ST ST","Excavation","San Francisco Water Department","350 collingwood","2012-01-26 15:37:52","APPROVED","4272000" "12EXC-0381","02ND ST","TEHAMA ST","","Excavation","ABOVE NET COMMUNICATIONS, INC.","Building Connection (217 02nd Street)","2012-01-31 13:25:02","ACTIVE","24539000" "12EXC-0381","TEHAMA ST","02ND ST","","Excavation","ABOVE NET COMMUNICATIONS, INC.","Building Connection (217 02nd Street)","2012-01-31 13:25:02","ACTIVE","24539000" "12EXC-0382","VALENCIA ST","18TH ST","19TH ST","Excavation","San Francisco Water Department","740 Valencia - FIRE,see 11exc-4814, renew for construction","2012-01-25 14:51:11","APPROVED","13064000" "12EXC-0383","VALMAR TER","MADISON ST","SILLIMAN ST","Excavation","San Francisco Water Department","58 valmar ter","2012-01-26 15:49:09","APPROVED","13132000" "12EXC-0385","DOLORES ST","23RD ST","24TH ST","Excavation","San Francisco Water Department","1009 dolores st","2012-01-27 10:00:05","APPROVED","4877101" "12EXC-0390","STOCKTON ST","04TH ST \ ELLIS ST \ MARKET ST","OFARRELL ST","Excavation","San Francisco Water Department","17 & 21-25 Stockton (for Muni Subway Project)","2012-01-24 14:24:28","APPROVED","12194000" "12EXC-0391","36TH AVE","SLOAT BLVD","","Excavation","Pacific Gas & Electric","N/W/C Sloat Blvd. & 36th Ave.","2012-01-25 14:18:44","APPROVED","32891000" "12EXC-0391","SLOAT BLVD","36TH AVE","","Excavation","Pacific Gas & Electric","N/W/C Sloat Blvd. & 36th Ave.","2012-01-25 14:18:44","APPROVED","32891000" "12EXC-0392","37TH AVE","SLOAT BLVD","","Excavation","Pacific Gas & Electric","N/E/C Sloat Blvd. & 37th Ave.","2012-01-25 14:33:48","APPROVED","32903000" "12EXC-0392","SLOAT BLVD","37TH AVE","","Excavation","Pacific Gas & Electric","N/E/C Sloat Blvd. & 37th Ave.","2012-01-25 14:33:48","APPROVED","32903000" "12EXC-0394","44TH AVE","CABRILLO ST","FULTON ST","Excavation","J. Flores Construction Co.","Spot Sewer 26, Contract #WW-520, Work Order 13, PUC #936643/936614, 885, 829-830 44th Avenue @ Cabrillo St., 4245 Cabrillo St & 6748 Fulton St.","2012-01-26 14:03:50","APPROVED","1975000" "12EXC-0401","CANYON DR","SOUTH HILL BLVD","END","Excavation","Pacific Gas & Electric","130 Canyon Dr.","2012-01-26 15:02:45","APPROVED","3652201" "12EXC-0406","SPEAR ST","MISSION ST","HOWARD ST","Excavation","SBC - Pacific Bell Engineering","2-4ft x 4ft pits to repair collapsed ducts","2012-01-25 09:23:48","APPROVED","12045000" "12EXC-0408","LAKE MERCED BLVD","HIGUERA AVE","HIGUERA AVE","Excavation","A & B Construction, Inc.","Harding Park Recycled Water Project (SFPUC Contract No. WD-2623)","2012-01-25 08:41:27","ACTIVE","8050101" "12EXC-0408","LAKE MERCED BLVD","HIGUERA AVE","HIGUERA AVE","Excavation","A & B Construction, Inc.","Harding Park Recycled Water Project (SFPUC Contract No. WD-2623)","2012-01-25 08:41:27","ACTIVE","8050201" "12EXC-0409","WAYLAND ST","BRUSSELS ST","GOETTINGEN ST","Excavation","Pacific Gas & Electric","300 & 330 Wayland St.","2012-01-27 11:33:07","APPROVED","13506000" "12EXC-0410","FOLSOM ST","MOSS ST","07TH ST","Excavation","SBC - Pacific Bell Engineering","AT&T Job Number 8469157","2012-02-01 15:15:38","APPROVED","5672000" "12EXC-0412","BIRCH ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25937000" "12EXC-0412","CLEARY CT","GALILEE LN \ LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26513000" "12EXC-0412","EDDY ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25964000" "12EXC-0412","ELLIS ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26512000" "12EXC-0412","FELL ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25913000" "12EXC-0412","FULTON ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25958000" "12EXC-0412","GALILEE LN","CLEARY CT \ LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26513000" "12EXC-0412","GEARY BLVD","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26514000" "12EXC-0412","GOLDEN GATE AVE","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25959000" "12EXC-0412","GROVE ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25934000" "12EXC-0412","GROVE ST","LAGUNA ST","BUCHANAN ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","6559000" "12EXC-0412","HAIGHT ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25867000" "12EXC-0412","HAYES ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25932000" "12EXC-0412","HERMANN ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25863000" "12EXC-0412","HICKORY ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","30071000" "12EXC-0412","HWY 101 NORTHBOUND","FELL ST \ LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25913000" "12EXC-0412","HWY 101 SOUTHBOUND","LAGUNA ST \ OAK ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","30069000" "12EXC-0412","IVY ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25935000" "12EXC-0412","LAGUNA ST","BIRCH ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25937000" "12EXC-0412","LAGUNA ST","BIRCH ST","FULTON ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7953000" "12EXC-0412","LAGUNA ST","CLEARY CT \ GALILEE LN","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26513000" "12EXC-0412","LAGUNA ST","CLEARY CT \ GALILEE LN","GEARY BLVD","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7962000" "12EXC-0412","LAGUNA ST","EDDY ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25964000" "12EXC-0412","LAGUNA ST","EDDY ST","WILLOW ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7959000" "12EXC-0412","LAGUNA ST","ELLIS ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26512000" "12EXC-0412","LAGUNA ST","ELLIS ST","CLEARY CT \ GALILEE LN","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7961000" "12EXC-0412","LAGUNA ST","FELL ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25913000" "12EXC-0412","LAGUNA ST","FELL ST","LINDEN ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7948000" "12EXC-0412","LAGUNA ST","FULTON ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25958000" "12EXC-0412","LAGUNA ST","FULTON ST","MCALLISTER ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7954000" "12EXC-0412","LAGUNA ST","GEARY BLVD","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26514000" "12EXC-0412","LAGUNA ST","GEARY BLVD","POST ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7963000" "12EXC-0412","LAGUNA ST","GOLDEN GATE AVE","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25959000" "12EXC-0412","LAGUNA ST","GOLDEN GATE AVE","TURK ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7957000" "12EXC-0412","LAGUNA ST","GROVE ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25934000" "12EXC-0412","LAGUNA ST","GROVE ST","BIRCH ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7952000" "12EXC-0412","LAGUNA ST","HAIGHT ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25867000" "12EXC-0412","LAGUNA ST","HAIGHT ST","ROSE ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7942000" "12EXC-0412","LAGUNA ST","HAYES ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25932000" "12EXC-0412","LAGUNA ST","HAYES ST","IVY ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7950000" "12EXC-0412","LAGUNA ST","HERMANN ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25863000" "12EXC-0412","LAGUNA ST","HERMANN ST","WALLER ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7940000" "12EXC-0412","LAGUNA ST","HICKORY ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","30071000" "12EXC-0412","LAGUNA ST","HICKORY ST","FELL ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7947000" "12EXC-0412","LAGUNA ST","IVY ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25935000" "12EXC-0412","LAGUNA ST","IVY ST","GROVE ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7951000" "12EXC-0412","LAGUNA ST","LARCH ST","EDDY ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7958002" "12EXC-0412","LAGUNA ST","LILY ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25911000" "12EXC-0412","LAGUNA ST","LILY ST","OAK ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7945000" "12EXC-0412","LAGUNA ST","LINDEN ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25927000" "12EXC-0412","LAGUNA ST","LINDEN ST","HAYES ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7949000" "12EXC-0412","LAGUNA ST","MCALLISTER ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25946000" "12EXC-0412","LAGUNA ST","MCALLISTER ST","REDWOOD ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7955000" "12EXC-0412","LAGUNA ST","OAK ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","30069000" "12EXC-0412","LAGUNA ST","OAK ST","HICKORY ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7946002" "12EXC-0412","LAGUNA ST","PAGE ST","LILY ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7944000" "12EXC-0412","LAGUNA ST","POST ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26505000" "12EXC-0412","LAGUNA ST","REDWOOD ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25960000" "12EXC-0412","LAGUNA ST","REDWOOD ST","GOLDEN GATE AVE","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7956000" "12EXC-0412","LAGUNA ST","ROSE ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25870000" "12EXC-0412","LAGUNA ST","ROSE ST","PAGE ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7943000" "12EXC-0412","LAGUNA ST","TURK ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25962000" "12EXC-0412","LAGUNA ST","TURK ST","LARCH ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7958001" "12EXC-0412","LAGUNA ST","WALLER ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25868000" "12EXC-0412","LAGUNA ST","WALLER ST","HAIGHT ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7941000" "12EXC-0412","LAGUNA ST","WILLOW ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26511000" "12EXC-0412","LAGUNA ST","WILLOW ST","ELLIS ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","7960000" "12EXC-0412","LILY ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25911000" "12EXC-0412","LINDEN ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25927000" "12EXC-0412","LINDEN ST","LAGUNA ST","BUCHANAN ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","8395000" "12EXC-0412","LINDEN ST","OCTAVIA ST","LAGUNA ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","8394000" "12EXC-0412","MCALLISTER ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25946000" "12EXC-0412","OAK ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","30069000" "12EXC-0412","POST ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26505000" "12EXC-0412","REDWOOD ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25960000" "12EXC-0412","ROSE ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25870000" "12EXC-0412","ROSE ST","OCTAVIA ST","LAGUNA ST","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","11153000" "12EXC-0412","TURK ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25962000" "12EXC-0412","WALLER ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","25868000" "12EXC-0412","WILLOW ST","LAGUNA ST","","Excavation","M Squared Construction, Inc.","8-inch Ductile Iron Water Main Installation in Laguna St. from Market St. to Post St. (SFPUC Contract No. WD-2439)","2012-01-25 14:09:31","APPROVED","26511000" "12EXC-0413","NAYLOR ST","CHICAGO WAY","BALTIMORE WAY","Excavation","Pacific Gas & Electric","330 Naylor St.","2012-01-27 11:43:39","APPROVED","9526000" "12EXC-0414","20TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","998000" "12EXC-0414","21ST AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","1072000" "12EXC-0414","22ND AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","1132000" "12EXC-0414","23RD AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","1211000" "12EXC-0414","24TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","1291000" "12EXC-0414","25TH AVE","LAKE ST","CALIFORNIA ST","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","1373000" "12EXC-0414","CALIFORNIA ST","20TH AVE","21ST AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","3597000" "12EXC-0414","CALIFORNIA ST","21ST AVE","22ND AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","3598000" "12EXC-0414","CALIFORNIA ST","22ND AVE","23RD AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","3599000" "12EXC-0414","CALIFORNIA ST","23RD AVE","24TH AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","3600000" "12EXC-0414","CALIFORNIA ST","24TH AVE","25TH AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","3601000" "12EXC-0414","LAKE ST","20TH AVE","21ST AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","8029000" "12EXC-0414","LAKE ST","21ST AVE","22ND AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","8030000" "12EXC-0414","LAKE ST","22ND AVE","23RD AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","8031000" "12EXC-0414","LAKE ST","23RD AVE","24TH AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","8032000" "12EXC-0414","LAKE ST","24TH AVE","25TH AVE","Excavation","LC General Engineering & Construction","SIRP 31 - California C","2012-01-25 13:35:27","APPROVED","8033000" "12EXC-0419","37TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1837000" "12EXC-0419","37TH AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1838000" "12EXC-0419","38TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1859000" "12EXC-0419","38TH AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1860000" "12EXC-0419","39TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1878000" "12EXC-0419","39TH AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1879000" "12EXC-0419","40TH AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1898000" "12EXC-0419","40TH AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1899000" "12EXC-0419","41ST AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1921000" "12EXC-0419","41ST AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1922000" "12EXC-0419","42ND AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1943000" "12EXC-0419","42ND AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1944000" "12EXC-0419","43RD AVE","SANTIAGO ST","TARAVAL ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1965000" "12EXC-0419","43RD AVE","TARAVAL ST","ULLOA ST","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","1966000" "12EXC-0419","SANTIAGO ST","37TH AVE","38TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","11629000" "12EXC-0419","SANTIAGO ST","38TH AVE","39TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","11630000" "12EXC-0419","SANTIAGO ST","39TH AVE","40TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","11631000" "12EXC-0419","SANTIAGO ST","40TH AVE","41ST AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","11632000" "12EXC-0419","SANTIAGO ST","41ST AVE","42ND AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","11633000" "12EXC-0419","SANTIAGO ST","42ND AVE","43RD AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","11634000" "12EXC-0419","TARAVAL ST","37TH AVE","38TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12414000" "12EXC-0419","TARAVAL ST","38TH AVE","39TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12415000" "12EXC-0419","TARAVAL ST","39TH AVE","40TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12416000" "12EXC-0419","TARAVAL ST","40TH AVE","41ST AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12417000" "12EXC-0419","TARAVAL ST","41ST AVE","42ND AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12418000" "12EXC-0419","TARAVAL ST","42ND AVE","43RD AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12419000" "12EXC-0419","ULLOA ST","37TH AVE","38TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12815000" "12EXC-0419","ULLOA ST","38TH AVE","39TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12816000" "12EXC-0419","ULLOA ST","39TH AVE","40TH AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12817000" "12EXC-0419","ULLOA ST","40TH AVE","41ST AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12818000" "12EXC-0419","ULLOA ST","41ST AVE","42ND AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12819000" "12EXC-0419","ULLOA ST","42ND AVE","43RD AVE","Excavation","Esquivel Grading & Paving, Inc.","SIRP 38 - Taraval B","2012-01-25 16:39:36","APPROVED","12820000" "12EXC-0420","MISSION ST","KENNY ALY","ITALY AVE","Excavation","Pacific Gas & Electric","IFO 4959 MISSION ST","2012-01-27 12:49:33","ACTIVE","9174201" "12EXC-0424","ARDATH CT","HAWKINS LN \ HUDSON AVE","END","Excavation","San Francisco Water Department","27 ARDATH, see 11exc-5037, renew for construction","2012-01-27 14:31:03","APPROVED","2403000" "12EXC-0426","29TH ST","NOE ST","CASTRO ST \ DAY ST","Excavation","San Francisco Water Department","585 - 29TH STREET, see 11exc-5036, renew for paving","2012-01-27 14:41:52","APPROVED","1634000" "12EXC-0429","SAINT ELMO WAY","EL VERANO WAY","MONTEREY BLVD","Excavation","San Francisco Water Department","170 ST ELMO WAY - FIRE, renew for paving","2012-01-27 15:13:36","APPROVED","11293000" "12EXC-0431","SPRUCE ST","EUCLID AVE","GEARY BLVD","Excavation","San Francisco Water Department","628 spruce","2012-01-31 08:26:49","APPROVED","12064000" "12EXC-0432","GRAND VIEW TER","GRAND VIEW AVE","END","Excavation","San Francisco Water Department","14 grand view ter","2012-01-27 16:08:26","APPROVED","6380000" "12EXC-0434","SHOTWELL ST","20TH ST","21ST ST","Excavation","San Francisco Water Department","642 SHOTWELL, see 11exc-1692, renew for construction, ORIGINAL WAS 11EXC-1401, RENEW AGAIN SEE 5024,","2012-01-27 15:19:05","APPROVED","11838000" "12EXC-0435","SANTIAGO ST","14TH AVE","15TH AVE","Excavation","San Francisco Water Department","325 santiago, see 11exc-1533, renew for construction, RENEW AGAIN SEE 5025","2012-01-27 15:25:54","APPROVED","11605000" "12EXC-0436","GEARY BLVD","28TH AVE","29TH AVE","Excavation","San Francisco Water Department","6423 GEARY, see 11exc-1788, renew for construction, RENEW AGAIN SEE 5021","2012-01-27 15:32:17","APPROVED","6085101" "12EXC-0437","PARNASSUS AVE","WOODLAND AVE","WILLARD ST","Excavation","San Francisco Water Department","272 parnassus, RENEW FOR CONSTRUCTION, SEE 11EXC4464","2012-01-27 15:38:44","APPROVED","10290000" "12EXC-0438","25TH ST","CASTRO ST","DIAMOND ST","Excavation","San Francisco Water Department","4215 - 17 - 25TH STREET, RENEW FOR CONSTRUCTION SEE 11EXC-5053","2012-01-27 15:45:45","APPROVED","1455000" "12EXC-0439","39TH AVE","ULLOA ST","VICENTE ST","Excavation","San Francisco Water Department","2543 - 47 - 39TH AV, RENEW FOR CONSTRUCITON SEE 11EXC-5059","2012-01-27 15:58:58","APPROVED","1880000" "12EXC-0440","BROADWAY","TAYLOR ST","","Excavation","San Francisco Water Department","INTERSECTION TAYLOR AND BROADWAY & INTERSECTION TAYLOR AND PACIFIC","2012-01-31 09:18:06","APPROVED","25118000" "12EXC-0440","PACIFIC AVE","TAYLOR ST","","Excavation","San Francisco Water Department","INTERSECTION TAYLOR AND BROADWAY & INTERSECTION TAYLOR AND PACIFIC","2012-01-31 09:18:06","APPROVED","25130000" "12EXC-0440","TAYLOR ST","BROADWAY","","Excavation","San Francisco Water Department","INTERSECTION TAYLOR AND BROADWAY & INTERSECTION TAYLOR AND PACIFIC","2012-01-31 09:18:06","APPROVED","25118000" "12EXC-0440","TAYLOR ST","PACIFIC AVE","","Excavation","San Francisco Water Department","INTERSECTION TAYLOR AND BROADWAY & INTERSECTION TAYLOR AND PACIFIC","2012-01-31 09:18:06","APPROVED","25130000" "12EXC-0442","17TH ST","KANSAS ST","VERMONT ST","Excavation","J. Flores Construction Co.","Spot Sewer 26 Contract #WW-520, Work Order 9, PUC # 1285702, 2000 17th St. @ Kansas St / Vermont St","2012-01-26 11:45:48","APPROVED","782000" "12EXC-0451","QUESADA AVE","CRISP RD","HAWES ST","Excavation","Pacific Gas & Electric","1184 Quesada Ave, pole replacement.","2012-01-31 10:36:25","APPROVED","10810000" "12EXC-0453","GOETTINGEN ST","BACON ST","WAYLAND ST","Excavation","Pacific Gas & Electric","411 Goettingen St","2012-01-31 10:42:51","APPROVED","6235000" "12EXC-0454","NORTH POINT ST","LEAVENWORTH ST","HYDE ST","Excavation","Pacific Gas & Electric","767 Northpoint St","2012-02-01 11:44:32","APPROVED","9694000" "12EXC-0458","LELAND AVE","PEABODY ST","RUTLAND ST","Excavation","Pacific Gas & Electric","182-4 Leland Ave","2012-01-31 11:07:44","ACTIVE","8295000" "12EXC-0460","BUENA VISTA AVE","FREDERICK ST","CENTRAL AVE","Excavation","Pacific Gas & Electric","731 Buena Vista Ave","2012-01-31 11:20:19","APPROVED","3369000" "12EXC-0461","CHESTNUT ST","AVILA ST","SCOTT ST","Excavation","SBC - Pacific Bell Engineering","Cable Failure 2285 Chestnut St","2012-01-30 09:56:51","APPROVED","3981000" "12EXC-0462","26TH ST","DIAMOND ST","DOUGLASS ST","Excavation","Pacific Gas & Electric","4363 26th St","2012-01-31 11:26:57","APPROVED","1540000" "12EXC-0463","ALEMANY BLVD","COTTER ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21777000" "12EXC-0463","ALEMANY BLVD","COTTER ST","FRANCIS ST","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2164101" "12EXC-0463","ALEMANY BLVD","COTTER ST","SANTA ROSA AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2164201" "12EXC-0463","ALEMANY BLVD","FRANCIS ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21776000" "12EXC-0463","ALEMANY BLVD","FRANCIS ST","SANTA ROSA AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2164102" "12EXC-0463","ALEMANY BLVD","HARRINGTON ST","NORTON ST","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2165102" "12EXC-0463","ALEMANY BLVD","NORTON ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","32971000" "12EXC-0463","ALEMANY BLVD","SAN JUAN AVE","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21740000" "12EXC-0463","ALEMANY BLVD","SAN JUAN AVE","OCEAN AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2166101" "12EXC-0463","ALEMANY BLVD","SAN JUAN AVE","OCEAN AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2166201" "12EXC-0463","ALEMANY BLVD","SANTA ROSA AVE","HARRINGTON ST","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2165101" "12EXC-0463","ALEMANY BLVD","SANTA ROSA AVE","SAN JUAN AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2165201" "12EXC-0463","ALEMANY BLVD","THERESA ST","COTTER ST","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2163101" "12EXC-0463","ALEMANY BLVD","THERESA ST","COTTER ST","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","2163201" "12EXC-0463","COTTER ST","ALEMANY BLVD","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21777000" "12EXC-0463","COTTER ST","ALEMANY BLVD","CAYUGA AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","4463000" "12EXC-0463","COTTER ST","MISSION ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21775000" "12EXC-0463","COTTER ST","MISSION ST","ALEMANY BLVD","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","4462000" "12EXC-0463","FRANCIS ST","ALEMANY BLVD","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21776000" "12EXC-0463","FRANCIS ST","MISSION ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21774000" "12EXC-0463","MISSION ST","COTTER ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21775000" "12EXC-0463","MISSION ST","EXCELSIOR AVE","SANTA ROSA AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","9161000" "12EXC-0463","MISSION ST","FRANCIS ST","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21774000" "12EXC-0463","NORTON ST","ALEMANY BLVD","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","32971000" "12EXC-0463","SAN JUAN AVE","ALEMANY BLVD","","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","21740000" "12EXC-0463","SANTA ROSA AVE","ALEMANY BLVD","CAYUGA AVE","Excavation","Pacific Gas & Electric","Balboa Park #4 GPRP Project","2012-01-30 15:42:34","ACTIVE","11590000" "12EXC-0466","BOSWORTH ST","LYELL ST","","Excavation","Pacific Gas & Electric","Holly Park 2 GPRP Project","2012-01-30 15:57:41","ACTIVE","21788000" "12EXC-0466","BOSWORTH ST","MARSILY ST","CUVIER ST","Excavation","Pacific Gas & Electric","Holly Park 2 GPRP Project","2012-01-30 15:57:41","ACTIVE","3020000" "12EXC-0466","CUVIER ST","MIRANDO WAY","","Excavation","Pacific Gas & Electric","Holly Park 2 GPRP Project","2012-01-30 15:57:41","ACTIVE","21701000" "12EXC-0466","LYELL ST","BOSWORTH ST","","Excavation","Pacific Gas & Electric","Holly Park 2 GPRP Project","2012-01-30 15:57:41","ACTIVE","21788000" "12EXC-0466","MIRANDO WAY","CUVIER ST","","Excavation","Pacific Gas & Electric","Holly Park 2 GPRP Project","2012-01-30 15:57:41","ACTIVE","21701000" "12EXC-0466","MIRANDO WAY","CUVIER ST","MILTON ST","Excavation","Pacific Gas & Electric","Holly Park 2 GPRP Project","2012-01-30 15:57:41","ACTIVE","9080000" "12EXC-0470","LEAVENWORTH ST","NORTH POINT ST","","Excavation","Pacific Gas & Electric","N/W/C Northpoint & Leavenworth Sts.","2012-02-01 11:54:43","APPROVED","25575000" "12EXC-0470","NORTH POINT ST","LEAVENWORTH ST","","Excavation","Pacific Gas & Electric","N/W/C Northpoint & Leavenworth Sts.","2012-02-01 11:54:43","APPROVED","25575000" "12EXC-0475","GIRARD ST","SILVER AVE","SILLIMAN ST","Excavation","Pacific Gas & Electric","50 Silliman St.(Svc. off Girard St.)","2012-02-02 08:55:07","ACTIVE","6195000" "12EXC-0477","CLAY ST","DRUMM ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24575000" "12EXC-0477","DRUMM ST","CLAY ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24575000" "12EXC-0477","DRUMM ST","CLAY ST","WASHINGTON ST","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","4972000" "12EXC-0477","DRUMM ST","JACKSON ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24578000" "12EXC-0477","DRUMM ST","SACRAMENTO ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24574000" "12EXC-0477","DRUMM ST","SACRAMENTO ST","CLAY ST","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","4971000" "12EXC-0477","DRUMM ST","WASHINGTON ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24571000" "12EXC-0477","DRUMM ST","WASHINGTON ST","JACKSON ST","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","4973000" "12EXC-0477","JACKSON ST","DRUMM ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24578000" "12EXC-0477","MARKET ST","SPEAR ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","30726000" "12EXC-0477","SACRAMENTO ST","DRUMM ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24574000" "12EXC-0477","SPEAR ST","MARKET ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","30726000" "12EXC-0477","SPEAR ST","MARKET ST","MISSION ST","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","12044000" "12EXC-0477","WASHINGTON ST","DRUMM ST","","Excavation","Underground Construction Co., INC","MCI-OSP Service - West","2012-01-30 13:05:05","ACTIVE","24571000" "12EXC-0496","42ND AVE","RIVERA ST","SANTIAGO ST","Excavation","Pacific Gas & Electric","2267 42nd Ave.","2012-02-02 10:34:42","APPROVED","1942000" "12EXC-0498","SAN CARLOS ST","18TH ST","19TH ST","Excavation","Pacific Gas & Electric","126, 166 & 181-5 San Carlos St.","2012-02-02 10:53:37","APPROVED","11404000" "12EXC-0499","SOUTH VAN NESS AVE","16TH ST","17TH ST","Excavation","Pacific Gas & Electric","573 So. VanNess Ave.","2012-02-02 11:04:39","APPROVED","12023000" "12EXC-0501","48TH AVE","CABRILLO ST","FULTON ST","Excavation","Pacific Gas & Electric","832 48th Ave","2012-02-02 11:19:39","APPROVED","2065000" "12EXC-0502","18TH ST","CLOVER ST","DANVERS ST","Excavation","Pacific Gas & Electric","18th Street GPRP Project","2012-02-02 08:54:25","APPROVED","899000" "12EXC-0502","18TH ST","HATTIE ST \ STORRIE ST","CLOVER ST","Excavation","Pacific Gas & Electric","18th Street GPRP Project","2012-02-02 08:54:25","APPROVED","898000" "12EXC-0503","CHESTNUT ST","HYDE ST","LARKIN ST","Excavation","Pacific Gas & Electric","1090 Chestnut St","2012-02-02 11:32:41","APPROVED","3964000" "12EXC-0504","VICKSBURG ST","ELIZABETH ST","24TH ST","Excavation","Pacific Gas & Electric","202 Vicksburg St","2012-02-02 11:49:24","APPROVED","13277000" "12EXC-0510","POND ST","16TH ST \ JOSE SARRIA CT","17TH ST","Excavation","Pacific Gas & Electric","46 Pond St","2012-02-02 12:02:54","APPROVED","10590000" "12EXC-0522","ALBION ST","16TH ST","CAMP ST","Excavation","Pacific Gas & Electric","135 & 194 Albion St.","2012-02-02 16:08:14","APPROVED","2145000" "12EXC-0522","ALBION ST","CAMP ST","17TH ST","Excavation","Pacific Gas & Electric","135 & 194 Albion St.","2012-02-02 16:08:14","APPROVED","2146000" "12EXC-0525","03RD ST","LE CONTE AVE","KEITH ST \ LE CONTE AVE","Excavation","Pacific Gas & Electric","6609 3rd St.","2012-02-03 07:49:08","APPROVED","233201" "12EXC-0527","05TH ST","TEHAMA ST","","Excavation","Pacific Gas & Electric","Tehema & 5th Sts","2012-02-03 08:43:05","APPROVED","23940000" "12EXC-0527","TEHAMA ST","05TH ST","","Excavation","Pacific Gas & Electric","Tehema & 5th Sts","2012-02-03 08:43:05","APPROVED","23940000" "12EXC-0527","TEHAMA ST","GALLAGHER LN","05TH ST","Excavation","Pacific Gas & Electric","Tehema & 5th Sts","2012-02-03 08:43:05","APPROVED","12475000" "12EXC-0548","TAYLOR ST","BEACH ST","JEFFERSON ST","Excavation","Pacific Gas & Electric","Taylor St.(Beach to Jefferson Sts.)","2012-02-03 13:24:26","APPROVED","12465000" "12IE-0011","GOLDEN GATE AVE","POLK ST","VAN NESS AVE","StrtImprov","Yerba Buena Engineering and Construction, Inc.","Install a new catch basin at the southwest corner of Golden Gate Avenue and Polk Street and the associate 10" culvert connecting to the sewer manhole on Golden Gate Avenue.","2012-01-24 15:22:01","ACTIVE","6265000" "12IE-0037","JORDAN AVE","CALIFORNIA ST","EUCLID AVE","StrtImprov","Gonzalez Concrete","Per NTR 960397, saw cut, remove 270 sq footage. Remove and replace 12' curb and gutter. Work on Sidewalk and Curb Only, do not touch street.","2012-01-24 11:55:09","ACTIVE","7616000" "12IE-0039","05TH ST","FOLSOM ST","SHIPLEY ST","StrtImprov","Richard Tai Woon","Construct new curb cut per city standards & repair / replace damaged sidewalk as directed by DPW inspector. Meters paid for one (1) day on 2/2/2012","2012-01-30 16:27:26","ACTIVE","299000" "12IE-0043","LAPIDGE ST","18TH ST","19TH ST","StrtImprov","O'Grady Plumbing","Reconstruct and repair existing curb and city sidewalk as necessary to city standards. Provide 2' pavement conform. All work shall be directed by a city inspector. Street space included.","2012-01-27 10:05:50","ACTIVE","8115000" "12N-0001","BEALE ST","MISSION ST","","NightNoise","Pacific Gas & Electric","","2012-01-04 09:44:11","ACTIVE","24554000" "12N-0001","BEALE ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2012-01-04 09:44:11","ACTIVE","2864000" "12N-0001","MISSION ST","BEALE ST","","NightNoise","Pacific Gas & Electric","","2012-01-04 09:44:11","ACTIVE","24554000" "12N-0005","BUSH ST","BELDEN ST","KEARNY ST","NightNoise","SBC - Pacific Bell Engineering","","2012-01-09 09:35:02","ACTIVE","3426000" "12N-0005","BUSH ST","KEARNY ST","","NightNoise","SBC - Pacific Bell Engineering","","2012-01-09 09:35:02","ACTIVE","24724000" "12N-0005","KEARNY ST","BUSH ST","","NightNoise","SBC - Pacific Bell Engineering","","2012-01-09 09:35:02","ACTIVE","24724000" "12N-0006","07TH ST","BERRY ST","","NightNoise","SBC - Pacific Bell Engineering","","2012-01-09 09:08:38","ACTIVE","23851000" "12N-0006","BERRY ST","07TH ST","","NightNoise","SBC - Pacific Bell Engineering","","2012-01-09 09:08:38","ACTIVE","23851000" "12N-0006","BERRY ST","07TH ST","DE HARO ST","NightNoise","SBC - Pacific Bell Engineering","","2012-01-09 09:08:38","ACTIVE","2957000" "12N-0009","10TH ST","STEVENSON ST","","NightNoise","Pacific Gas & Electric","","2012-01-13 14:53:34","ACTIVE","24424000" "12N-0009","STEVENSON ST","10TH ST","","NightNoise","Pacific Gas & Electric","","2012-01-13 14:53:34","ACTIVE","24424000" "12N-0011","08TH ST","GROVE ST \ HYDE ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2012-01-13 15:25:17","ACTIVE","24429000" "12N-0011","GROVE ST","08TH ST \ HYDE ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2012-01-13 15:25:17","ACTIVE","24429000" "12N-0011","HYDE ST","08TH ST \ GROVE ST \ MARKET ST","","NightNoise","Pacific Gas & Electric","","2012-01-13 15:25:17","ACTIVE","24429000" "12N-0011","MARKET ST","08TH ST \ GROVE ST \ HYDE ST","","NightNoise","Pacific Gas & Electric","","2012-01-13 15:25:17","ACTIVE","24429000" "12N-0012","LARKIN ST","MCALLISTER ST","","NightNoise","SBC - Pacific Bell Engineering","","2012-01-19 15:05:09","ACTIVE","24439000" "12N-0012","MCALLISTER ST","LARKIN ST","","NightNoise","SBC - Pacific Bell Engineering","","2012-01-19 15:05:09","ACTIVE","24439000" "12N-0015","SPEAR ST","HOWARD ST","FOLSOM ST","NightNoise","Pacific Gas & Electric","","2012-01-23 13:01:03","ACTIVE","12046000" "12N-0015","SPEAR ST","MISSION ST","HOWARD ST","NightNoise","Pacific Gas & Electric","","2012-01-23 13:01:03","ACTIVE","12045000" "12N-0016","03RD ST","GILMAN AVE \ PAUL AVE","HOLLISTER AVE","NightNoise","Pacific Gas & Electric","","2012-01-23 13:35:40","ACTIVE","228101" "12N-0016","03RD ST","GILMAN AVE \ PAUL AVE","HOLLISTER AVE","NightNoise","Pacific Gas & Electric","","2012-01-23 13:35:40","ACTIVE","228201" "12N-0016","BUSH ST","CHATHAM PL","STOCKTON ST","NightNoise","Pacific Gas & Electric","","2012-01-23 13:35:40","ACTIVE","3432000" "12N-0026","01ST ST","MINNA ST","NATOMA ST","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","105000" "12N-0026","01ST ST","MISSION ST","","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","24563000" "12N-0026","01ST ST","MISSION ST","MINNA ST","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","104000" "12N-0026","01ST ST","MISSION ST","TRANSBAY HUMP","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","104001" "12N-0026","01ST ST","NATOMA ST","HOWARD ST","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","106000" "12N-0026","01ST ST","TRANSBAY HUMP","MINNA ST","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","104002" "12N-0026","MISSION ST","01ST ST","","NightNoise","Compass Engineering","","2012-01-31 13:48:20","ACTIVE","24563000" "12S-0003","INDIANA ST","23RD ST","25TH ST \ I-280 N ON RAMP","SideSewer","TARA PIPELINE & ENGINEERING","Excavate and install new 6" sewer lateral to a 15" VCP main with 4 hours of inspection. Street space #1246412 .","2012-01-13 15:03:00","ACTIVE","7198000" "12S-0005","10TH ST","FELL ST \ MARKET ST \ POLK ST","STEVENSON ST","SideSewer","A & B Construction, Inc.","","2012-01-10 09:42:41","ACTIVE","480000" "12S-0005","10TH ST","STEVENSON ST","JESSIE ST","SideSewer","A & B Construction, Inc.","","2012-01-10 09:42:41","ACTIVE","481000" "12S-0007","CALIFORNIA ST","16TH AVE","17TH AVE","SideSewer","TARA PIPELINE & ENGINEERING","Excavate and install new 6" sewer lateral to a 8" main on California St. 4 hours of inspection. Street space included","2012-01-13 15:07:18","ACTIVE","3593000" "12S-0009","CLAY ST","PRESIDIO AVE","WALNUT ST","SideSewer","Gorman Pipeline Inc","Install new 6" side sewer to a 12" main with 4 hours of inspection. Street space #11105996","2012-01-17 17:04:47","ACTIVE","4120000" "12S-0021","CALIFORNIA ST","DIVISADERO ST","BRODERICK ST","SideSewer","TARA PIPELINE & ENGINEERING","Excavate and install new 6" sewer lateral to a 24" main with 4 hours of inspection.","2012-01-30 11:55:09","ACTIVE","3562000" "12S-0027","SAN CARLOS ST","18TH ST","19TH ST","SideSewer","Fitzgerald Construction","Install a new 6" sewer lateral connecting to the 15" main.","2012-01-27 14:55:07","ACTIVE","11404000" "12SW-0003","VAN NESS AVE","FERN ST","BUSH ST","SpecSide","A.R. Sanchez-Corea & Associates, Inc.","Cross slopes within the path of travel on Bush, Fern and Van Ness frontages to range from 1% to 4.2% (max). Bush and Van Ness to have gade break in sidewalk, outside of path of travel, between curb cuts with maximum 15% slopes.","2012-01-05 14:48:08","ACTIVE","13155202" "12TE-0001","BAY ST","FRANKLIN ST","GOUGH ST","TankRemove","GOLDEN GATE TANK REMOVAL","1500-gallon underground Heating Oil Tank.","2012-01-03 14:03:07","ACTIVE","2786000" "99MSE-538","19TH ST","SANCHEZ ST","NOE ST","MinorEnc","","","2000-02-07 00:00:00","ACTIVE","982000"